INDOT contract B-43873-A bid tabulation
BRIDGE DECK OVERLAY AND SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on March 11, 2026, Laporte, Porter, LaPorte. 4 bids received; low bid $2,392,981 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 120
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $2,392,981 | Low |
| 2 | Ellas Construction Company Inc | $2,578,210 | +8.0% |
| 3 | Dunnet Bay Construction Company | $2,593,991 | +8.0% |
| 4 | Milestone Contractors LP | $2,998,239 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Ellas Construction Company Inc | 3. Dunnet Bay Construction Company | 4. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $60,000 | $78,000 | $70,000 | $38,000 |
| 0002 | Railroad flagging budget (107-12976) | DOL | 346,804 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $118,000 | $127,500 | $114,000 | $150,000 |
| 0013 | Clearing and grubbing (201-01015) | LS | 1 | $25,000 | $10,000 | $26,105 | $15,500 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $25,000 | $25,500 | $26,105 | $13,000 |
| 0015 | Pavement removal (202-02240) | SYS | 320 | $55.00 | $58.00 | $40.00 | $135.00 |
| 0016 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $50,000 | $392,500 | $150,000 | $75,000 |
| 0017 | Excavation, common (203-02000) | CYS | 473 | $101.00 | $57.00 | $50.00 | $95.00 |
| 0018 | Borrow (203-02070) | CYS | 5 | $20.00 | $125.00 | $300.00 | $400.00 |
| 0019 | Linear grading (203-08607) | LFT | 480 | $17.00 | $8.00 | $9.00 | $10.00 |
| 0020 | Pump around (205-11626) | EACH | 1 | $15,000 | $1,000.00 | $140,000 | $130.00 |
| 0021 | Stormwater management budget (205-12108) | DOL | 3,138 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0022 | Stormwater management implementation (205-12616) | LS | 1 | $15,000 | $3,600.00 | $4,000.00 | $4,600.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 792 | $62.00 | $52.00 | $45.00 | $96.00 |
| 0024 | Aggregate for end bent backfill (211-06467) | CYS | 38 | $135.00 | $117.00 | $375.00 | $150.00 |
| 0025 | Structure backfill, type 2 (211-09265) | CYS | 352 | $82.00 | $40.00 | $125.00 | $40.00 |
| 0026 | Flowable backfill, non- removable (213-09269) | CYS | 12 | $300.00 | $300.00 | $200.00 | $435.00 |
| 0027 | Geotextile for pavement, type 2A (214-12238) | SYS | 366 | $5.00 | $4.50 | $3.00 | $5.00 |
| 0028 | Geotextile for pavement, type 2B (214-12239) | SYS | 829 | $5.00 | $4.50 | $3.00 | $5.00 |
| 0029 | Compacted aggregate, no. 8 (301-12233) | CYS | 11 | $175.00 | $112.00 | $90.00 | $190.00 |
| 0030 | Compacted aggregate, no. 53 (301-12234) | CYS | 40 | $130.00 | $108.00 | $90.00 | $170.00 |
| 0031 | Subbase for PCCP (302-06464) | CYS | 32 | $190.00 | $99.00 | $150.00 | $275.00 |
| 0032 | Compacted aggregate, no. 53 (303-01180) | TON | 237 | $72.00 | $51.00 | $50.00 | $97.00 |
| 0033 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,020 | $13.00 | $7.85 | $5.00 | $8.00 |
| 0034 | Milling, transition (306-08043) | SYS | 1,600 | $10.00 | $6.35 | $2.90 | $5.00 |
| 0035 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 100 | $211.00 | $231.00 | $231.00 | $231.00 |
| 0036 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 172 | $236.00 | $231.00 | $231.00 | $231.00 |
| 0037 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 42 | $378.00 | $225.00 | $225.00 | $225.00 |
| 0038 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 46 | $534.00 | $225.00 | $225.00 | $225.00 |
| 0039 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 137 | $229.00 | $215.00 | $215.00 | $215.00 |
| 0040 | QC/QA-HMA, 3, 58H, base, 25.0 MM (401-000050) | TON | 80 | $237.00 | $215.00 | $215.00 | $215.00 |
| 0041 | Joint adhesive (401-11526) | LFT | 2,410 | $8.00 | $0.15 | $0.15 | $0.15 |
| 0042 | HMA wedge and level, type B (402-07451) | TON | 12 | $614.00 | $305.00 | $305.00 | $305.00 |
| 0043 | Asphalt for tack coat (406-05520) | TON | 3 | $2,800.00 | $3,100.00 | $100.00 | $100.00 |
| 0044 | Terminal joint, type HMA (503-12477) | LFT | 72 | $450.00 | $415.00 | $550.00 | $740.00 |
| 0045 | Guardrail, remove (601-02241) | LFT | 360 | $11.00 | $3.00 | $3.00 | $5.00 |
| 0046 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 25 | $23.00 | $42.00 | $42.00 | $23.00 |
| 0047 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $990.00 | $950.00 | $950.00 | $1,400.00 |
| 0048 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,700.00 | $3,304.00 | $3,304.00 | $3,750.00 |
| 0049 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 1,785 | $9.75 | $0.67 | $3.95 | $3.95 |
| 0050 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 174.40 | $180.00 | $182.00 | $210.00 | $410.00 |
| 0051 | Monument, type B (615-06505) | EACH | 2 | $2,000.00 | $1,004.00 | $1,004.00 | $1,450.00 |
| 0052 | Benchmark post (615-06530) | EACH | 1 | $2,320.00 | $1,100.00 | $250.00 | $1,200.00 |
| 0053 | Riprap, class 1 (616-05688) | TON | 50 | $155.00 | $117.00 | $183.72 | $209.00 |
| 0054 | Riprap, revetment (616-06405) | TON | 152 | $142.00 | $160.00 | $144.33 | $320.00 |
| 0055 | Geotextile for riprap, type 1A (616-12246) | SYS | 279 | $7.00 | $3.75 | $3.02 | $5.00 |
| 0056 | Geotextile for riprap, type 2B (616-12249) | SYS | 306 | $8.00 | $5.00 | $6.27 | $6.00 |
| 0057 | Clean steel bridge, partial, QP-2, bridge no. 1 (619-11050) | LS | 1 | $15,000 | $15,000 | $15,000 | $15,000 |
| 0058 | Disposal of cleaning waste, hazardous, bridge no. 1 (619-12459) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0059 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0060 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $500.00 | $500.00 | $500.00 | $1,000.00 |
| 0061 | Erosion control blanket (621-02770) | SYS | 229 | $2.50 | $2.50 | $2.50 | $2.50 |
| 0062 | Mulched seeding, type R (621-06559) | SYS | 229 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0063 | Sodding (621-06574) | SYS | 151 | $24.00 | $24.00 | $24.00 | $24.00 |
| 0064 | Field office, type C (628-09403) | MOS | 12 | $3,050.00 | $3,000.00 | $2,450.00 | $2,750.00 |
| 0065 | Computer system equipment (628-11976) | EACH | 3 | $580.00 | $200.00 | $100.00 | $950.00 |
| 0066 | Concrete, B, footings (702-51015) | CYS | 8.30 | $1,200.00 | $2,600.00 | $1,875.00 | $2,950.00 |
| 0067 | Field drilled hole in concrete (702-51863) | EACH | 170 | $25.00 | $27.00 | $30.00 | $65.00 |
| 0068 | Concrete, A (702-90915) | CYS | 3.60 | $3,000.00 | $2,555.00 | $3,200.00 | $6,700.00 |
| 0069 | Reinforcing bars, epoxy coated (703-06029) | LBS | 18,284 | $2.50 | $1.85 | $2.20 | $2.85 |
| 0070 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 242 | $20.00 | $27.00 | $48.00 | $75.00 |
| 0071 | Concrete, C, superstructure (704-51002) | CYS | 38.80 | $1,930.00 | $1,825.00 | $2,250.00 | $4,555.00 |
| 0072 | Railing, concrete type FC , modified (706-11600) | CYS | 0.60 | $3,464.55 | $6,300.00 | $8,000.00 | $11,000 |
| 0073 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $3,833.00 | $3,750.00 | $5,000.00 | $6,500.00 |
| 0074 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $3,000.00 | $3,000.00 | $3,400.00 | $3,000.00 |
| 0075 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $3,000.00 | $3,000.00 | $3,400.00 | $3,000.00 |
| 0076 | Patching concrete structures (710-09158) | SFT | 42 | $222.00 | $199.00 | $199.00 | $199.00 |
| 0077 | Drilled hole (711-51864) | EACH | 84 | $102.00 | $114.00 | $73.00 | $114.00 |
| 0078 | Jacking and supporting superstructure , bridge no. 1 (711-90114) | LS | 1 | $93,000 | $35,000 | $180,000 | $60,000 |
| 0079 | Pipe end section, diameter 48 in. (715-02246) | EACH | 1 | $3,110.00 | $4,000.00 | $5,000.00 | $15,000 |
| 0080 | Pipe, type 1, circular, diameter 48 in. (715-05128) | LFT | 85 | $700.00 | $925.00 | $520.00 | $1,000.00 |
| 0081 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 92 | $15.00 | $18.00 | $35.00 | $45.00 |
| 0082 | Bridge deck, remove polymer overlay and surface (722-000146) | SYS | 867 | $7.00 | $10.00 | $10.50 | $14.00 |
| 0083 | Hydrodemolition (722-01066) | SYS | 1,515 | $95.00 | $101.00 | $105.00 | $110.00 |
| 0084 | Bridge deck overlay budget (722-12380) | DOL | 17,925 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0085 | Bridge deck, remove concrete surface (722-12464) | SYS | 648 | $17.00 | $11.50 | $16.50 | $17.00 |
| 0086 | Longitudinal grooving (722-12732) | SYS | 1,515 | $5.00 | $8.50 | $8.50 | $4.04 |
| 0087 | Bridge deck patching, full depth (722-51401) | SFT | 274 | $58.00 | $10.00 | $5.00 | $27.00 |
| 0088 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,515 | $120.00 | $130.00 | $100.00 | $240.00 |
| 0089 | Overlay dam (722-51874) | SFT | 124.50 | $85.00 | $51.00 | $50.00 | $80.00 |
| 0090 | Bearing assembly, elastomeric (726-92406) | EACH | 21 | $3,000.00 | $4,560.00 | $8,000.00 | $6,000.00 |
| 0091 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 5 | $65.00 | $65.00 | $65.00 | $65.00 |
| 0092 | Epoxy injection, crack preparation (727-90308) | LFT | 42 | $142.00 | $142.00 | $142.00 | $142.00 |
| 0093 | Epoxy injection, furnishing equipment , bridge no. 1 (727-93560) | LS | 1 | $965.00 | $965.00 | $965.00 | $965.00 |
| 0094 | Road closure sign assembly (801-04308) | EACH | 13 | $218.00 | $218.00 | $218.00 | $218.00 |
| 0095 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 15,000 | $1.88 | $1.88 | $1.88 | $1.88 |
| 0096 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 120 | $10.88 | $10.88 | $10.88 | $10.88 |
| 0097 | Detour route marker assembly (801-06625) | EACH | 55 | $148.00 | $148.00 | $148.00 | $148.00 |
| 0098 | Construction sign, type A (801-06640) | EACH | 49 | $188.00 | $188.00 | $188.00 | $188.00 |
| 0099 | Construction sign, type B (801-06645) | EACH | 16 | $102.00 | $102.00 | $102.00 | $102.00 |
| 0100 | Maintaining traffic (801-06775) | LS | 1 | $35,070 | $50,000 | $10,000 | $11,000 |
| 0101 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $10,600 | $6,416.00 | $6,416.00 | $6,650.00 |
| 0102 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $8,200.00 | $8,226.00 | $8,226.00 | $8,500.00 |
| 0103 | Barricade, type III-A (801-07118) | LFT | 80 | $15.94 | $15.94 | $15.94 | $15.94 |
| 0104 | Temporary traffic barrier, type 2 (801-08401) | LFT | 850 | $50.00 | $34.00 | $30.00 | $128.00 |
| 0105 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 1,107 | $62.00 | $51.00 | $30.00 | $128.00 |
| 0106 | Portable changeable message sign (801-11642) | EACH | 2 | $3,692.00 | $3,692.00 | $3,692.00 | $3,692.00 |
| 0107 | Temporary portable rumble strips (801-12031) | DAY | 50 | $115.81 | $150.00 | $45.00 | $200.00 |
| 0108 | Portable signal (801-12081) | LS | 1 | $25,000 | $34,000 | $33,091 | $33,091 |
| 0109 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $864.00 | $864.00 | $864.00 | $864.00 |
| 0110 | Reference post (802-04893) | EACH | 2 | $250.00 | $475.00 | $475.00 | $300.00 |
| 0111 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 64 | $17.00 | $20.00 | $35.00 | $35.00 |
| 0112 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 9.66 | $67.00 | $150.00 | $35.30 | $35.30 |
| 0113 | Line, remove (808-06716) | LFT | 13,800 | $0.51 | $0.51 | $0.51 | $0.51 |
| 0114 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0115 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 5,765 | $0.88 | $0.88 | $0.88 | $0.88 |
| 0116 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 3,238 | $0.88 | $0.88 | $0.88 | $0.88 |
| 0117 | Grooving for pavement markings (808-12032) | LFT | 1,403 | $0.77 | $0.77 | $0.77 | $0.77 |
| 0118 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 1,052 | $1.22 | $1.22 | $1.22 | $1.22 |
| 0119 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 3 | $52.00 | $35.00 | $25.00 | $200.00 |
| 0120 | Snowplowable raised pavement marker (808-75998) | EACH | 9 | $94.00 | $94.00 | $94.00 | $94.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.