Ram Construction SRVCS of Michigan Inc: INDOT bid record

Ram Construction SRVCS of Michigan Inc submitted 82 bids on Indiana DOT contracts in the data, from 09 FEB 2022 to 14 JAN 2026, and was the low bidder on 42 of them (51%). When it was not low, its total sat a median +16% above the low bid.

Owner
Indiana DOT
Low bid volume
$37,405,021
Latest bid
14 JAN 2026
Data through
05 NOV 2026
82Bids
42Low bids
51Win rate, percent
+16%Median gap to the low bid when not low, 40 bids

By year

YearBidsLow bidsWin rate
2022251144%
202315960%
2024211467%
202519737%
20262150%
Ram Construction SRVCS of Michigan Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Seymour271244%
LaPorte191158%
Fort Wayne12867%
Crawfordsville11545%
Vincennes8563%
Greenfield4125%
LaPorte, Seymour100%
Ram Construction SRVCS of Michigan Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL7979 (100%)$1.00$1.00
Contract liens109-08360DOL7979 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL7979 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL7979 (100%)$1.00$1.00
Project estimate adjustment109-08463DOL5353 (100%)$1.00$1.00
Bridge deck patching, partial depth722-51852SFT6643 (65%)$5.00$5.00
Construction sign, type A801-06640EACH5038 (76%)$180.00$200.00
Flashing arrow sign801-06710DAY3629 (81%)$16.00$17.00
Temporary pavement marking, removable, 6 in.801-06209LFT3627 (75%)$1.73$2.00
Snowplowable raised pavement marker, remove808-75996EACH3926 (67%)$50.00$25.00
Temporary pavement marking, removable, 4 in.801-06207LFT2924 (83%)$1.25$1.40
Line, multi-component, solid, yellow, 6 in.808-10057LFT2924 (83%)$1.20$1.15
Ram Construction SRVCS of Michigan Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Ram Construction SRVCS of Michigan Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
14 JAN 2026B-43822-AFort WayneBRIDGE THIN DECK OVERLAY2 of 4$661,872+3.0%
14 JAN 2026B-45637-AFort WayneREPAIR OR REPLACE JOINTS1 of 5$742,594Low, 11% under the second
10 DEC 2025B-43738-ASeymourBRIDGE THIN DECK OVERLAY1 of 3$122,708Low, 3.0% under the second
10 DEC 2025B-43817-AFort WayneBRIDGE THIN DECK OVERLAY1 of 2$1,793,025Low, 66% under the second
08 OCT 2025B-43744-ASeymourBRIDGE THIN DECK OVERLAY2 of 2$141,166+20%
08 OCT 2025B-44650-AGreenfieldSUBSTRUCTURE REPAIR AND REHABILITATION6 of 7$505,484+101%
10 SEP 2025B-41371-BCrawfordsvilleBRIDGE THIN DECK OVERLAY2 of 3$285,545+15%
10 SEP 2025B-43001-ACrawfordsvilleBRIDGE THIN DECK OVERLAY1 of 3$208,292Low, 33% under the second
10 SEP 2025B-43727-ASeymourBRIDGE THIN DECK OVERLAY1 of 2$245,689Low, 29% under the second
10 SEP 2025B-43737-ASeymourBRIDGE THIN DECK OVERLAY2 of 3$142,995+15%
06 AUG 2025B-43731-ASeymourBRIDGE THIN DECK OVERLAY2 of 2$187,375+31%
06 AUG 2025B-43794-AFort WayneBRIDGE DECK OVERLAY3 of 4$2,995,701+17%
06 AUG 2025B-44241-AVincennesBRIDGE THIN DECK OVERLAY, SMALL STRUCTURE PIPE LINING2 of 2$840,737+19%
09 JUL 2025B-43317-ASeymourBRIDGE THIN DECK OVERLAY2 of 2$338,549+11%
09 JUL 2025B-43781-ASeymourBRIDGE THIN DECK OVERLAY1 of 4$1,737,342Low, 11% under the second
09 JUL 2025B-44357-ALaPorteBRIDGE THIN DECK OVERLAY3 of 3$739,904+49%
12 MAR 2025B-43040-ALaPorteBRIDGE THIN DECK OVERLAY1 of 2$292,432Low, 45% under the second
12 MAR 2025B-43913-ALaPorteBRIDGE THIN DECK OVERLAY AND BRIDGE PAINTING3 of 4$2,489,547+5.0%
12 FEB 2025B-42955-ACrawfordsvilleBRIDGE THIN DECK OVERLAY2 of 2$521,566+6.0%
12 FEB 2025B-44928-AFort WayneBRIDGE MAINTENANCE AND REPAIRS TO APPROACH SLAB3 of 4$242,221+52%
15 JAN 2025R-43137-AFort WayneHIGH FRICTION SURFACE TREATMENT1 of 2$523,036Low, 27% under the second
11 DEC 2024B-43002-ACrawfordsvilleBRIDGE THIN DECK OVERLAY2 of 2$163,278+33%
11 DEC 2024B-43360-ALaPorteBRIDGE THIN DECK OVERLAY4 of 5$165,931+4.0%
11 DEC 2024B-44960-ASeymourSUBSTRUCTURE REPAIR AND REHABILITATION3 of 5$263,608+62%
11 DEC 2024B-44963-ASeymourBRIDGE COATING1 of 2$761,677Low, 4.0% under the second
Ram Construction SRVCS of Michigan Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy