INDOT contract B-45637-A bid tabulation
REPAIR OR REPLACE JOINTS. Let by Indiana DOT on January 14, 2026, Allen, Fort Wayne. 5 bids received; low bid $742,594 by Ram Construction SRVCS of Michigan Inc.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 26
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ram Construction SRVCS of Michigan Inc | $742,594 | Low |
| 2 | Pioneer Associates Inc | $826,452 | +11% |
| 3 | E & B Paving LLC | $1,190,000 | +60% |
| 4 | Milestone Contractors LP | $1,270,432 | +71% |
| 5 | R L McCoy Inc | $1,346,609 | +81% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ram Construction SRVCS of Michigan Inc | 2. Pioneer Associates Inc | 3. E & B Paving LLC | 4. Milestone Contractors LP | 5. R L McCoy Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $3,000.00 | $1,000.00 | $6,000.00 | $6,500.00 | $10,000 |
| 0002 | E-ticket incentive (106-12979) | EACH | 6 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0003 | Railroad flagging budget (107-12976) | DOL | 12,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $52,300 | $79,875 | $61,466 | $63,522 | $135,000 |
| 0010 | Bridge deck patching, partial depth (722-51852) | SFT | 725 | $5.00 | $70.00 | $150.00 | $100.00 | $98.00 |
| 0011 | Bridge joint nosing (724-12420) | SFT | 164 | $313.20 | $450.00 | $1,200.00 | $550.00 | $520.00 |
| 0012 | Bridge expansion joint seal, type PCF, replace (724-12779) | LFT | 780 | $101.30 | $210.00 | $60.00 | $125.00 | $275.00 |
| 0013 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 125,276 | $1.71 | $0.75 | $1.00 | $2.25 | $2.25 |
| 0014 | Construction sign, type A (801-06640) | EACH | 120 | $209.00 | $210.00 | $250.00 | $250.00 | $250.00 |
| 0015 | Flashing arrow sign (801-06710) | DAY | 50 | $15.00 | $15.00 | $25.00 | $25.00 | $25.00 |
| 0016 | Maintaining traffic (801-06775) | LS | 1 | $158,290 | $153,500 | $380,000 | $326,791 | $250,000 |
| 0017 | Barricade, type III-A (801-07118) | LFT | 300 | $15.56 | $16.00 | $15.00 | $15.00 | $15.00 |
| 0018 | Portable changeable message sign (801-11642) | EACH | 4 | $3,348.00 | $3,350.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0019 | Truck mounted attenuator (801-12042) | DAY | 136 | $25.00 | $220.00 | $200.00 | $690.00 | $450.00 |
| 0020 | Law enforcement officer (801-12324) | HRS | 144 | $60.00 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0021 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 20 | $909.00 | $1,000.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 0022 | Line, remove (808-06716) | LFT | 50,830 | $0.59 | $0.59 | $1.00 | $1.00 | $1.00 |
| 0023 | Transverse marking, multi-component, crosshatch line, white, 24 in. (808-10038) | LFT | 272 | $13.49 | $13.50 | $20.00 | $20.00 | $20.00 |
| 0024 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 19,796 | $0.89 | $0.90 | $1.25 | $1.25 | $1.25 |
| 0025 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 6,961 | $0.89 | $0.90 | $1.25 | $1.25 | $1.25 |
| 0026 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 6,065 | $6.13 | $6.15 | $9.00 | $9.00 | $9.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.