INDOT contract B-43781-A bid tabulation
BRIDGE THIN DECK OVERLAY. Let by Indiana DOT on July 9, 2025, Monroe, Seymour. 4 bids received; low bid $1,737,342 by Ram Construction SRVCS of Michigan Inc.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 54
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ram Construction SRVCS of Michigan Inc | $1,737,342 | Low |
| 2 | Enneking Pressure Cleaning Inc | $1,924,258 | +11% |
| 3 | CLR Inc | $2,022,220 | +16% |
| 4 | Rieth-Riley Construction Co., Inc. | $2,236,153 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ram Construction SRVCS of Michigan Inc | 2. Enneking Pressure Cleaning Inc | 3. CLR Inc | 4. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $5,000.00 | $1,000.00 | $125,000 | $7,500.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Mobilization and demobilization (110-01001) | LS | 1 | $184,200 | $178,358 | $101,100 | $111,808 |
| 0008 | Cracks in PCCP, rout and seal (507-07482) | LFT | 2,100 | $2.50 | $5.00 | $10.00 | $1.69 |
| 0009 | Joints in PCCP, saw and seal (507-08272) | LFT | 4,200 | $5.00 | $10.00 | $5.00 | $1.69 |
| 0010 | Barrier delineator (602-06729) | EACH | 322 | $20.00 | $25.00 | $12.00 | $40.00 |
| 0011 | Field office, type C (628-09403) | MOS | 8 | $1,000.00 | $500.00 | $1,200.00 | $3,400.00 |
| 0012 | Computer system equipment (628-11976) | EACH | 1 | $10.00 | $100.00 | $100.00 | $1,000.00 |
| 0013 | Surface seal , bridge no. 01 (709-51821) | LS | 1 | $3,500.00 | $3,567.00 | $8,000.00 | $6,988.00 |
| 0014 | Surface seal , bridge no. 02 (709-51821) | LS | 1 | $3,500.00 | $3,567.00 | $8,000.00 | $6,988.00 |
| 0015 | Surface seal , bridge no. 03 (709-51821) | LS | 1 | $4,850.00 | $5,016.00 | $9,000.00 | $6,988.00 |
| 0016 | Surface seal , bridge no. 04 (709-51821) | LS | 1 | $4,850.00 | $5,016.00 | $9,000.00 | $6,988.00 |
| 0017 | Surface seal , bridge no. 05 (709-51821) | LS | 1 | $3,980.00 | $4,102.00 | $9,000.00 | $5,706.00 |
| 0018 | Surface seal , bridge no. 06 (709-51821) | LS | 1 | $3,980.00 | $4,102.00 | $9,000.00 | $5,706.00 |
| 0019 | Surface seal , bridge no. 07 (709-51821) | LS | 1 | $3,000.00 | $3,018.00 | $8,000.00 | $3,660.00 |
| 0020 | Surface seal , bridge no. 08 (709-51821) | LS | 1 | $5,825.00 | $6,003.00 | $12,000 | $7,280.00 |
| 0021 | Surface seal , bridge no. 09 (709-51821) | LS | 1 | $3,165.00 | $3,262.00 | $8,000.00 | $5,189.00 |
| 0022 | Surface seal , bridge no. 10 (709-51821) | LS | 1 | $3,165.00 | $3,262.00 | $8,000.00 | $5,189.00 |
| 0023 | Surface seal , bridge no. 11 (709-51821) | LS | 1 | $2,645.00 | $2,727.00 | $8,000.00 | $3,306.00 |
| 0024 | Surface seal , bridge no. 12 (709-51821) | LS | 1 | $2,645.00 | $2,727.00 | $8,000.00 | $3,306.00 |
| 0025 | Surface seal , bridge no. 13 (709-51821) | LS | 1 | $4,000.00 | $4,084.00 | $9,000.00 | $6,993.00 |
| 0026 | Surface seal , bridge no. 14 (709-51821) | LS | 1 | $4,000.00 | $4,084.00 | $9,000.00 | $6,993.00 |
| 0027 | Surface seal , bridge no. 15 (709-51821) | LS | 1 | $3,000.00 | $3,106.00 | $8,000.00 | $5,191.00 |
| 0028 | Surface seal , bridge no. 16 (709-51821) | LS | 1 | $3,000.00 | $3,160.00 | $8,000.00 | $5,191.00 |
| 0029 | Surface seal , bridge no. 17 (709-51821) | LS | 1 | $4,400.00 | $4,541.00 | $9,000.00 | $7,090.00 |
| 0030 | Surface seal , bridge no. 18 (709-51821) | LS | 1 | $4,400.00 | $4,541.00 | $9,000.00 | $7,090.00 |
| 0031 | Surface seal , bridge no. 19 (709-51821) | LS | 1 | $2,700.00 | $2,781.00 | $8,000.00 | $4,250.00 |
| 0032 | Surface seal , bridge no. 20 (709-51821) | LS | 1 | $2,700.00 | $2,781.00 | $8,000.00 | $4,250.00 |
| 0033 | Surface seal , bridge no. 21 (709-51821) | LS | 1 | $4,400.00 | $4,545.00 | $11,000 | $5,513.00 |
| 0034 | Bridge deck patching, partial depth (722-51852) | SFT | 1,851 | $5.00 | $2.50 | $5.00 | $3.73 |
| 0035 | Warranted polymer overlay, bridge deck (738-12855) | SYS | 20,523 | $36.70 | $45.00 | $34.50 | $34.24 |
| 0036 | Temporary pavement marking, removable, 4 in. (801-06207) | LFT | 105,000 | $0.50 | $0.98 | $0.94 | $0.98 |
| 0037 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 105,000 | $1.00 | $1.75 | $1.25 | $1.75 |
| 0038 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 144 | $10.00 | $10.00 | $12.00 | $10.00 |
| 0039 | Construction sign, type A (801-06640) | EACH | 220 | $150.00 | $150.00 | $150.00 | $150.00 |
| 0040 | Flashing arrow sign (801-06710) | DAY | 540 | $17.00 | $17.00 | $30.00 | $17.00 |
| 0041 | Maintaining traffic (801-06775) | LS | 1 | $362,160 | $178,010 | $329,740 | $687,316 |
| 0042 | Barricade, type III-A (801-07118) | LFT | 72 | $17.00 | $17.00 | $75.00 | $17.00 |
| 0043 | Portable changeable message sign (801-11642) | EACH | 8 | $5,555.00 | $8,555.00 | $4,800.00 | $8,555.00 |
| 0044 | Portable signal (801-12081) | LS | 1 | $8,000.00 | $15,000 | $100,000 | $15,250 |
| 0045 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 36 | $390.00 | $555.00 | $375.00 | $555.00 |
| 0046 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,630 | $0.50 | $0.50 | $1.61 | $0.50 |
| 0047 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,630 | $0.50 | $0.50 | $1.61 | $0.50 |
| 0048 | Line, multi-component, broken, white, 4 in. (808-10031) | LFT | 1,437 | $2.00 | $2.00 | $1.75 | $2.00 |
| 0049 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 4,720 | $2.00 | $2.00 | $2.15 | $2.00 |
| 0050 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 5,390 | $2.00 | $2.00 | $2.15 | $2.00 |
| 0051 | Pavement message marking, multi- component, only (808-10052) | EACH | 1 | $400.00 | $400.00 | $485.00 | $400.00 |
| 0052 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 1 | $450.00 | $450.00 | $485.00 | $450.00 |
| 0053 | Snowplowable raised pavement marker (808-75998) | EACH | 69 | $25.00 | $95.55 | $85.00 | $95.55 |
| 0054 | Truck mounted attenuator (801-12042) | DAY | 180 | $50.00 | $150.00 | $200.00 | $450.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.