INDOT contract B-43916-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on February 11, 2026, Lake, LaPorte. 7 bids received; low bid $1,734,167 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 93
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $1,734,167 | Low |
| 2 | F H Paschen S N Nielsen & Associates LLC | $1,950,567 | +12% |
| 3 | Dunnet Bay Construction Company | $2,131,086 | +23% |
| 4 | Ellas Construction Company Inc | $2,230,674 | +29% |
| 5 | Superior Construction Co Inc | $2,390,515 | +38% |
| 6 | Gariup Construction Co Inc | $2,427,500 | +40% |
| 7 | Milestone Contractors LP | $2,658,000 | +53% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. F H Paschen S N Nielsen & Associates LLC | 3. Dunnet Bay Construction Company | 4. Ellas Construction Company Inc | 5. Superior Construction Co Inc | 6. Gariup Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $125,000 | $165,000 | $37,000 | $35,000 | $18,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 4 | $1,200.00 | $2,133.43 | $1,050.00 | $910.00 | $775.00 | $1,100.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $200,000 | $97,500 | $106,554 | $110,000 | $119,000 | $198,510 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $3,000.00 | $19,000 | $21,311 | $22,000 | $24,000 | $20,000 |
| 0012 | Pavement removal (202-02240) | SYS | 503 | $60.00 | $32.64 | $44.71 | $58.50 | $34.00 | $45.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $80,000 | $200,000 | $200,000 | $481,000 | $687,695 | $110,000 |
| 0014 | Sign, remove (202-74035) | EACH | 4 | $41.50 | $41.50 | $41.50 | $41.50 | $41.50 | $47.00 |
| 0015 | Handhole, remove (202-86946) | EACH | 3 | $551.15 | $551.15 | $551.15 | $551.15 | $551.15 | $620.00 |
| 0016 | Pipe, remove (202-96133) | LFT | 5 | $100.00 | $166.54 | $25.00 | $70.00 | $90.00 | $160.00 |
| 0017 | Excavation, common (203-02000) | CYS | 458 | $25.00 | $50.49 | $25.00 | $72.00 | $30.00 | $55.00 |
| 0018 | Linear grading (203-08607) | LFT | 331 | $5.00 | $14.42 | $10.00 | $8.00 | $1.10 | $24.00 |
| 0020 | Stormwater management budget (205-12108) | DOL | 22,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $1,500.00 | $2,380.00 | $20,000 | $6,000.00 | $12,500 | $12,000 |
| 0022 | Excavation, wet (206-51220) | CYS | 50 | $250.00 | $250.00 | $650.00 | $92.00 | $250.00 | $200.00 |
| 0023 | Cofferdam (206-51235) | LS | 1 | $122,338 | $40,000 | $100,000 | $10,000 | $10,000 | $70,000 |
| 0024 | Subgrade treatment, type IC (207-09935) | SYS | 770 | $34.00 | $40.19 | $35.00 | $56.50 | $29.00 | $33.00 |
| 0025 | B borrow (211-02050) | CYS | 18 | $133.00 | $50.05 | $220.00 | $100.00 | $37.00 | $70.00 |
| 0026 | Structure backfill, type 4 (211-09267) | CYS | 30 | $215.00 | $192.88 | $500.00 | $235.00 | $165.00 | $305.00 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,354 | $4.00 | $3.38 | $3.00 | $4.50 | $1.25 | $4.50 |
| 0028 | Subbase for PCCP (302-06464) | CYS | 140 | $98.00 | $144.35 | $100.00 | $104.00 | $106.00 | $140.00 |
| 0029 | Compacted aggregate, no. 53 (303-01180) | TON | 166 | $46.00 | $79.29 | $95.00 | $50.00 | $58.00 | $42.00 |
| 0030 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,326 | $4.50 | $2.06 | $7.29 | $5.00 | $1.30 | $7.50 |
| 0031 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 119 | $183.00 | $150.53 | $183.00 | $183.00 | $183.00 | $165.00 |
| 0032 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 101 | $188.00 | $158.66 | $188.00 | $188.00 | $188.00 | $174.00 |
| 0033 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 402 | $128.00 | $111.88 | $128.00 | $128.00 | $128.00 | $123.00 |
| 0034 | Joint adhesive (401-11526) | LFT | 2,660 | $2.30 | $0.51 | $2.30 | $2.30 | $2.30 | $0.60 |
| 0035 | Asphalt for tack coat (406-05521) | SYS | 2,154 | $2.00 | $0.86 | $2.00 | $2.00 | $2.00 | $1.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 602 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $7.00 |
| 0037 | Hand dig guardrail post holes (601-09238) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $112.00 |
| 0038 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 153.75 | $24.00 | $24.00 | $24.00 | $24.00 | $24.00 | $27.00 |
| 0039 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,395.00 | $3,395.00 | $3,395.00 | $3,395.00 | $3,395.00 | $3,800.00 |
| 0040 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,050.00 | $3,050.00 | $3,050.00 | $3,050.00 | $3,050.00 | $3,400.00 |
| 0041 | Barrier delineator (602-06729) | EACH | 8 | $22.61 | $22.61 | $22.61 | $22.61 | $22.61 | $28.00 |
| 0042 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 559 | $150.00 | $131.65 | $180.00 | $176.00 | $143.00 | $215.00 |
| 0043 | Monument, type B (615-06505) | EACH | 2 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,350.00 |
| 0044 | Benchmark post (615-06530) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,350.00 |
| 0045 | Riprap, class 1 (616-05688) | TON | 837 | $115.00 | $109.32 | $155.00 | $185.00 | $106.00 | $175.00 |
| 0046 | Riprap, revetment (616-06405) | TON | 18 | $190.00 | $168.11 | $180.00 | $100.00 | $133.00 | $110.00 |
| 0047 | Geotextile for riprap, type 2A (616-12248) | SYS | 892 | $3.00 | $3.67 | $2.50 | $3.50 | $4.25 | $5.00 |
| 0048 | Disposal of cleaning waste, non-hazardous, bridge no. 1 (619-12460) | LS | 1 | $1,500.00 | $250.00 | $250.00 | $1,500.00 | $1,500.00 | $1,700.00 |
| 0049 | Clean and coat steel piling, bridge no. 1 (619-12507) | LS | 1 | $43,500 | $42,000 | $50,000 | $43,500 | $43,500 | $49,000 |
| 0050 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $575.00 | $500.00 | $575.00 | $500.00 | $575.00 | $650.00 |
| 0051 | Mulched seeding, type U (621-06560) | SYS | 1,545 | $2.76 | $1.30 | $2.76 | $1.30 | $2.76 | $3.10 |
| 0052 | Sodding (621-06574) | SYS | 11 | $162.50 | $40.00 | $162.50 | $40.00 | $162.50 | $250.00 |
| 0053 | Seed mixture, floodplain (621-12612) | LBS | 8 | $265.00 | $300.00 | $265.00 | $300.00 | $265.00 | $300.00 |
| 0054 | Computer system equipment (628-11976) | EACH | 3 | $100.00 | $577.80 | $310.00 | $300.00 | $500.00 | $1,500.00 |
| 0055 | Field office, type D (628-12683) | MOS | 12 | $3,200.00 | $3,000.00 | $2,850.00 | $3,250.00 | $1,700.00 | $8,800.00 |
| 0056 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 4 | $2,500.00 | $1,920.77 | $1,500.00 | $2,000.00 | $1,450.00 | $2,940.00 |
| 0057 | Reinforcing bars, epoxy coated (703-06029) | LBS | 136,330 | $1.50 | $1.46 | $1.60 | $1.80 | $1.50 | $1.90 |
| 0058 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 464 | $60.00 | $25.00 | $1.00 | $36.00 | $0.01 | $44.00 |
| 0059 | Concrete, C, superstructure (704-51002) | CYS | 410 | $900.00 | $1,244.52 | $1,200.00 | $1,100.00 | $1,550.00 | $1,750.00 |
| 0060 | Concrete bridge railing transition, type TPS-1 (706-06353) | EACH | 4 | $4,000.00 | $3,918.25 | $6,000.00 | $3,900.00 | $4,300.00 | $10,000 |
| 0061 | Railing, steel type PS-1 (706-11418) | LFT | 171.70 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $90.00 |
| 0062 | Railing, concrete type PS-1 (706-11604) | CYS | 13.20 | $2,288.00 | $1,779.78 | $1,250.00 | $2,600.00 | $1,850.00 | $2,560.00 |
| 0063 | Surface seal , structure no. 1 (709-51821) | LS | 1 | $1.00 | $1,500.00 | $1.00 | $1,800.00 | $1,800.00 | $2,000.00 |
| 0064 | Stud shear connectors (711-96800) | EACH | 16 | $100.00 | $28.85 | $130.00 | $45.00 | $135.00 | $700.00 |
| 0065 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 226 | $28.00 | $36.64 | $35.00 | $45.00 | $37.00 | $100.00 |
| 0066 | Pipe, roadway drain casting extension (715-10238) | EACH | 4 | $130.00 | $644.61 | $750.00 | $575.00 | $500.00 | $2,375.00 |
| 0067 | Outlet protector, type 3 (718-06531) | EACH | 4 | $1,300.00 | $1,685.95 | $800.00 | $1,600.00 | $2,250.00 | $1,830.00 |
| 0068 | Longitudinal grooving (722-12732) | SYS | 1,189 | $3.75 | $4.75 | $6.69 | $5.80 | $3.75 | $4.25 |
| 0069 | Road closure sign assembly (801-04308) | EACH | 8 | $244.00 | $244.00 | $244.00 | $244.00 | $244.00 | $330.00 |
| 0070 | Detour route marker assembly (801-06625) | EACH | 32 | $144.00 | $144.00 | $144.00 | $144.00 | $144.00 | $195.00 |
| 0071 | Construction sign, type A (801-06640) | EACH | 15 | $185.00 | $185.00 | $185.00 | $185.00 | $185.00 | $250.00 |
| 0072 | Maintaining traffic (801-06775) | LS | 1 | $10,000 | $74,603 | $25,000 | $37,000 | $15,000 | $40,000 |
| 0073 | Barricade, type III-A (801-07118) | LFT | 144 | $14.91 | $14.91 | $14.91 | $14.91 | $14.91 | $17.00 |
| 0074 | Barricade, type III-B (801-07119) | LFT | 156 | $14.91 | $14.91 | $14.91 | $14.91 | $14.91 | $17.00 |
| 0075 | Reference post (802-04893) | EACH | 2 | $319.49 | $319.49 | $319.49 | $319.49 | $319.49 | $360.00 |
| 0076 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 13 | $25.28 | $25.28 | $25.28 | $25.28 | $25.28 | $28.00 |
| 0077 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 52 | $23.28 | $23.28 | $23.28 | $23.28 | $23.28 | $26.00 |
| 0078 | Sign, sheet, relocate (802-07060) | EACH | 2 | $99.59 | $99.59 | $99.59 | $99.59 | $99.59 | $110.00 |
| 0079 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 13 | $30.50 | $30.50 | $30.50 | $30.50 | $30.50 | $34.00 |
| 0080 | Delineator post (804-06770) | EACH | 4 | $105.67 | $105.67 | $105.67 | $105.67 | $105.67 | $120.00 |
| 0081 | Handhole, signal, type 1 (805-01842) | EACH | 2 | $2,278.45 | $2,278.45 | $2,278.45 | $2,278.45 | $2,278.45 | $2,600.00 |
| 0082 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 454 | $12.09 | $12.09 | $12.09 | $12.09 | $12.09 | $13.00 |
| 0083 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 190 | $1.17 | $1.17 | $1.17 | $1.17 | $1.17 | $1.50 |
| 0084 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 900 | $2.36 | $2.36 | $2.36 | $2.36 | $2.36 | $2.60 |
| 0085 | Signal detector housing (805-78785) | EACH | 1 | $1,921.52 | $1,921.52 | $1,921.52 | $1,921.52 | $1,921.52 | $2,150.00 |
| 0086 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 2,310 | $0.88 | $0.88 | $0.88 | $0.88 | $0.88 | $1.70 |
| 0087 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 43 | $9.85 | $9.85 | $9.85 | $9.85 | $9.85 | $17.00 |
| 0088 | Pavement message marking, multi- component, only (808-10052) | EACH | 1 | $214.00 | $214.00 | $214.00 | $214.00 | $214.00 | $220.00 |
| 0089 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,290 | $0.88 | $0.88 | $0.88 | $0.88 | $0.88 | $1.70 |
| 0090 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 2 | $168.00 | $168.00 | $168.00 | $168.00 | $168.00 | $220.00 |
| 0091 | Transverse marking, multi-component, crosshatch line, yellow, 24 in. (808-10119) | LFT | 49 | $13.21 | $13.21 | $13.21 | $13.21 | $13.21 | $17.00 |
| 0092 | Grooving for pavement markings (808-12032) | LFT | 2,378 | $0.81 | $0.81 | $0.81 | $0.81 | $0.81 | $1.00 |
| 0093 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 8 | $100.00 | $19.22 | $20.00 | $19.22 | $19.22 | $250.00 |
| 0094 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 62 | $19.90 | $20.54 | $19.90 | $19.90 | $19.90 | $23.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.