INDOT contract B-44098-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on January 14, 2026, Laporte, LaPorte. 6 bids received; low bid $1,123,292 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 69
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $1,123,292 | Low |
| 2 | Milestone Contractors LP | $1,159,280 | +3.0% |
| 3 | Dunnet Bay Construction Company | $1,320,694 | +18% |
| 4 | Laporte Construction Company Inc | $1,388,568 | +24% |
| 5 | Ellas Construction Company Inc | $1,699,500 | +51% |
| 6 | Gariup Construction Co Inc | $2,247,500 | +100% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Milestone Contractors LP | 3. Dunnet Bay Construction Company | 4. Laporte Construction Company Inc | 5. Ellas Construction Company Inc | 6. Gariup Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $17,150 | $15,000 | $80,000 | $12,641 | $25,000 | $15,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $104,040 | $58,000 | $65,000 | $65,000 | $75,000 | $255,878 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $4,000.00 | $6,550.00 | $22,981 | $6,640.20 | $44,250 | $50,000 |
| 0011 | Pavement removal (202-02240) | SYS | 172 | $50.00 | $42.00 | $1.00 | $50.41 | $65.00 | $70.00 |
| 0012 | Present structure, remove portions, structure no. 46-00104 (202-51328) | LS | 1 | $76,500 | $100,000 | $200,000 | $300,000 | $455,000 | $50,000 |
| 0013 | Pipe, remove (202-96133) | LFT | 50 | $35.00 | $25.00 | $8.00 | $23.20 | $37.50 | $20.00 |
| 0014 | Excavation, common (203-02000) | CYS | 95 | $200.00 | $130.00 | $300.00 | $89.17 | $79.50 | $60.00 |
| 0015 | Excavation, waterway (203-51223) | CYS | 90 | $1.00 | $56.00 | $1.00 | $230.52 | $86.50 | $100.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 16,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $2,000.00 | $5,000.00 | $40,000 | $12,230 | $5,000.00 | $15,000 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $16,073 | $15,000 | $1.00 | $80,000 | $1,000.00 | $700,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 1,040 | $33.54 | $50.00 | $20.00 | $62.39 | $61.00 | $30.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 16 | $210.00 | $230.00 | $370.00 | $173.09 | $143.00 | $100.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,212 | $3.68 | $5.00 | $2.00 | $4.20 | $4.75 | $10.00 |
| 0022 | Subbase for PCCP (302-06464) | CYS | 43 | $220.00 | $200.00 | $135.00 | $193.86 | $119.00 | $100.00 |
| 0023 | Compacted aggregate, no. 53 (303-01180) | TON | 214 | $47.00 | $46.00 | $80.00 | $77.09 | $56.00 | $60.00 |
| 0024 | Milling, transition (306-08043) | SYS | 245 | $9.00 | $26.00 | $25.00 | $14.64 | $20.50 | $25.00 |
| 0025 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 88 | $205.00 | $160.00 | $160.00 | $160.00 | $160.00 | $250.00 |
| 0026 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 113 | $171.00 | $140.00 | $140.00 | $140.00 | $140.00 | $175.00 |
| 0027 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 277 | $114.00 | $115.00 | $115.00 | $115.00 | $115.00 | $120.00 |
| 0028 | Joint adhesive (401-11526) | LFT | 628 | $12.00 | $0.20 | $0.20 | $0.20 | $0.20 | $5.00 |
| 0029 | Asphalt for tack coat (406-05521) | SYS | 982 | $3.00 | $0.20 | $0.20 | $0.20 | $0.20 | $2.00 |
| 0030 | Guardrail terminal system, W-beam, curved, type 4 (601-01740) | EACH | 1 | $3,108.00 | $3,108.00 | $3,108.00 | $3,108.00 | $3,108.00 | $3,500.00 |
| 0031 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $3,108.00 | $3,108.00 | $3,108.00 | $3,108.00 | $3,108.00 | $3,500.00 |
| 0032 | Guardrail, remove (601-02241) | LFT | 256 | $2.00 | $2.00 | $2.00 | $2.00 | $9.00 | $3.00 |
| 0033 | Guardrail terminal system, W-beam, curved, type 7 (601-05071) | EACH | 2 | $3,236.00 | $3,236.00 | $3,236.00 | $3,236.00 | $3,236.00 | $4,000.00 |
| 0034 | Guardrail transition, type TGS-1 (601-06374) | EACH | 4 | $975.00 | $975.00 | $975.00 | $975.00 | $975.00 | $1,100.00 |
| 0035 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 69 | $24.00 | $24.00 | $24.00 | $24.00 | $24.00 | $27.00 |
| 0036 | Fence gate, relocate (603-02969) | LS | 1 | $2,101.00 | $2,101.00 | $2,101.00 | $2,101.00 | $2,101.00 | $2,400.00 |
| 0037 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 172 | $160.00 | $200.00 | $135.00 | $125.00 | $180.00 | $210.00 |
| 0038 | Right-of-way marker (615-06490) | EACH | 8 | $170.00 | $170.00 | $170.00 | $170.00 | $170.00 | $200.00 |
| 0039 | Riprap, revetment (616-06405) | TON | 387 | $150.00 | $145.00 | $120.00 | $93.82 | $96.50 | $200.00 |
| 0040 | Geotextile for riprap, type 1A (616-12246) | SYS | 583 | $4.00 | $5.00 | $7.00 | $4.04 | $4.00 | $20.00 |
| 0041 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 | $340.00 |
| 0042 | Mulched seeding, type R (621-06559) | SYS | 645 | $3.65 | $3.65 | $3.65 | $3.65 | $3.65 | $5.00 |
| 0043 | Computer system equipment (628-11976) | EACH | 2 | $100.00 | $450.00 | $200.00 | $800.00 | $850.00 | $2,500.00 |
| 0044 | Field office, type D (628-12683) | MOS | 9 | $2,500.00 | $3,500.00 | $2,700.00 | $3,500.00 | $6,500.00 | $8,000.00 |
| 0045 | Reinforcing bars, epoxy coated (703-06029) | LBS | 45,575 | $2.00 | $1.70 | $2.00 | $1.29 | $1.40 | $2.00 |
| 0046 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 28 | $60.00 | $1.00 | $60.00 | $45.62 | $35.50 | $50.00 |
| 0047 | Concrete, C, superstructure (704-51002) | CYS | 129.10 | $1,500.00 | $1,618.00 | $1,400.00 | $1,400.00 | $1,300.00 | $1,300.00 |
| 0048 | Railing, steel type TS-1 (706-06344) | LFT | 255 | $110.00 | $89.00 | $89.00 | $89.00 | $89.00 | $100.00 |
| 0049 | Structural member, concrete, box beam, 17 in. X 36 in. (707-11443) | LFT | 517 | $322.00 | $400.00 | $405.00 | $400.00 | $757.00 | $450.00 |
| 0050 | Patching concrete structures (710-09158) | SFT | 10 | $346.00 | $346.00 | $346.00 | $350.00 | $346.00 | $400.00 |
| 0051 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 70 | $60.00 | $55.00 | $60.00 | $72.31 | $64.00 | $330.00 |
| 0052 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 102 | $15.00 | $28.00 | $25.00 | $29.59 | $17.00 | $100.00 |
| 0053 | Pipe extension, circular, diameter 36 in. , CMP (715-05757) | LFT | 15 | $150.00 | $250.00 | $185.00 | $171.02 | $269.00 | $400.00 |
| 0054 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $1,200.00 | $700.00 | $950.00 | $768.66 | $425.00 | $600.00 |
| 0055 | Pipe end section, diameter 36 in. (715-46040) | EACH | 1 | $2,400.00 | $1,700.00 | $2,300.00 | $1,323.67 | $2,100.00 | $1,500.00 |
| 0056 | Geotextile for underdrains, type 2B (718-12308) | SYS | 56 | $20.00 | $15.00 | $15.00 | $17.78 | $14.00 | $25.00 |
| 0057 | Longitudinal grooving (722-12732) | SYS | 575 | $7.50 | $6.09 | $8.00 | $14.65 | $12.50 | $11.00 |
| 0058 | Bearing assembly, elastomeric (726-92406) | EACH | 48 | $1,100.00 | $1,000.00 | $1,300.00 | $1,179.10 | $772.00 | $2,000.00 |
| 0059 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 10 | $58.00 | $58.00 | $58.00 | $10.00 | $58.00 | $12.00 |
| 0060 | Epoxy injection, crack preparation (727-90308) | LFT | 60 | $129.00 | $129.00 | $129.00 | $99.00 | $129.00 | $120.00 |
| 0061 | Epoxy injection, furnishing equipment (727-93560) | LS | 1 | $965.00 | $965.00 | $965.00 | $900.00 | $965.00 | $8,000.00 |
| 0062 | Road closure sign assembly (801-04308) | EACH | 5 | $247.00 | $247.00 | $247.00 | $247.00 | $247.00 | $400.00 |
| 0063 | Detour route marker assembly (801-06625) | EACH | 18 | $144.00 | $144.00 | $144.00 | $144.00 | $144.00 | $200.00 |
| 0064 | Construction sign, type A (801-06640) | EACH | 12 | $198.00 | $198.00 | $198.00 | $198.00 | $198.00 | $220.00 |
| 0065 | Maintaining traffic (801-06775) | LS | 1 | $5,000.00 | $15,000 | $15,000 | $6,349.33 | $10,000 | $40,000 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 48 | $14.94 | $14.94 | $14.94 | $15.00 | $14.94 | $25.00 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 72 | $14.94 | $14.94 | $14.94 | $15.00 | $14.94 | $25.00 |
| 0068 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,100 | $0.32 | $0.32 | $0.32 | $0.32 | $0.32 | $1.20 |
| 0069 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,100 | $0.32 | $0.32 | $0.32 | $0.32 | $0.32 | $1.20 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.