INDOT contract B-42823-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on July 9, 2025, White, LaPorte. 6 bids received; low bid $1,521,850 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 88
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,521,850 | Low |
| 2 | Laporte Construction Company Inc | $1,735,282 | +14% |
| 3 | Duncan Robertson Inc | $1,754,278 | +15% |
| 4 | Pontem Contractors Inc | $1,859,542 | +22% |
| 5 | Beaty Construction Inc | $1,909,662 | +25% |
| 6 | Rieth-Riley Construction Co., Inc. | $2,095,360 | +38% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Laporte Construction Company Inc | 3. Duncan Robertson Inc | 4. Pontem Contractors Inc | 5. Beaty Construction Inc | 6. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $21,300 | $21,530 | $20,000 | $30,000 | $31,000 | $45,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $76,100 | $46,177 | $75,000 | $91,500 | $95,483 | $106,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $25,000 | $23,457 | $17,500 | $18,000 | $19,086 | $21,000 |
| 0011 | Pavement removal (202-02240) | SYS | 210 | $41.00 | $39.92 | $50.00 | $19.27 | $24.54 | $45.00 |
| 0012 | Curb and gutter, remove (202-02279) | LFT | 150 | $15.00 | $14.79 | $7.00 | $24.63 | $12.38 | $23.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $55,000 | $157,630 | $190,000 | $267,118 | $120,000 | $150,000 |
| 0014 | Excavation, common (203-02000) | CYS | 770 | $50.00 | $50.63 | $80.00 | $125.03 | $55.00 | $63.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 24,300 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $4,700.00 | $19,251 | $30,000 | $6,911.58 | $20,000 | $45,000 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 26 | $245.00 | $60.24 | $150.00 | $114.72 | $128.66 | $85.00 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $14,000 | $230,196 | $15,000 | $55,000 | $48,123 | $90,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 1,375 | $60.00 | $64.53 | $65.00 | $43.69 | $48.00 | $60.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 26 | $245.00 | $257.78 | $145.00 | $112.91 | $172.51 | $184.00 |
| 0021 | Flowable backfill, non- removable (213-09269) | CYS | 20 | $292.00 | $531.44 | $400.00 | $225.08 | $190.78 | $500.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 275 | $9.00 | $9.24 | $6.00 | $8.35 | $4.88 | $12.00 |
| 0023 | Compacted aggregate, no. 53 (301-12234) | CYS | 133 | $147.00 | $114.89 | $90.00 | $82.46 | $85.23 | $87.00 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 69 | $210.00 | $95.73 | $150.00 | $194.85 | $135.96 | $197.00 |
| 0025 | Compacted aggregate, no. 73 (303-07449) | TON | 497 | $44.00 | $83.58 | $65.00 | $47.16 | $47.23 | $55.00 |
| 0026 | Widening with HMA, type B (304-07493) | TON | 391 | $151.00 | $127.00 | $140.00 | $165.43 | $127.00 | $157.00 |
| 0027 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,641 | $5.50 | $3.95 | $3.50 | $4.49 | $6.75 | $5.00 |
| 0028 | Milling, transition (306-08043) | SYS | 715 | $6.50 | $6.34 | $3.50 | $4.93 | $5.04 | $8.00 |
| 0029 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 395 | $130.00 | $127.00 | $140.00 | $133.35 | $127.00 | $127.00 |
| 0030 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 184 | $134.20 | $127.00 | $140.00 | $133.35 | $127.00 | $127.00 |
| 0031 | Joint adhesive, surface (401-10258) | LFT | 3,555 | $0.01 | $1.50 | $1.65 | $1.58 | $1.50 | $1.50 |
| 0032 | Joint adhesive, intermediate (401-10259) | LFT | 774 | $0.01 | $1.50 | $1.65 | $1.58 | $1.50 | $1.50 |
| 0033 | Asphalt for tack coat (406-05521) | SYS | 5,910 | $0.01 | $0.10 | $0.11 | $0.11 | $0.10 | $0.10 |
| 0034 | Guardrail transition, type TGB (601-01522) | EACH | 4 | $2,500.00 | $3,304.00 | $3,272.00 | $2,625.00 | $2,500.00 | $2,500.00 |
| 0035 | Guardrail terminal system, W-beam curved, type 4 (601-01740) | EACH | 2 | $3,000.00 | $3,216.00 | $3,110.00 | $3,150.00 | $3,000.00 | $3,000.00 |
| 0036 | Guardrail, remove (601-02241) | LFT | 1,321 | $0.01 | $4.00 | $4.40 | $0.01 | $0.01 | $0.01 |
| 0037 | Guardrail terminal system, W-beam curved, type 8 (601-05585) | EACH | 1 | $3,000.00 | $3,818.00 | $3,025.00 | $3,150.00 | $3,000.00 | $3,000.00 |
| 0038 | Guardrail end treatment, type OS , (SKT 350), modified (45 LFT) (601-94689) | EACH | 1 | $2,900.00 | $3,271.00 | $3,190.00 | $3,045.00 | $2,900.00 | $2,900.00 |
| 0039 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 1,082 | $20.00 | $26.00 | $21.00 | $21.00 | $20.00 | $20.00 |
| 0040 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 275 | $240.00 | $203.68 | $250.00 | $265.01 | $518.66 | $208.00 |
| 0041 | HMA for approaches, type B (610-07487) | TON | 37 | $177.13 | $127.00 | $140.00 | $133.35 | $127.00 | $127.00 |
| 0042 | Mailbox assembly, reset, single (611-08232) | EACH | 3 | $265.00 | $507.00 | $275.00 | $278.25 | $265.00 | $265.00 |
| 0043 | Riprap, class 2 (616-05689) | TON | 1,005 | $165.00 | $108.89 | $100.00 | $124.57 | $128.23 | $155.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 73 | $154.00 | $64.73 | $80.00 | $68.36 | $85.00 | $247.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 901 | $1.30 | $4.23 | $4.50 | $6.42 | $1.99 | $3.00 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $400.00 | $400.00 | $440.00 | $420.00 | $400.00 | $400.00 |
| 0047 | Erosion control blanket (621-02770) | SYS | 1,222 | $2.98 | $3.00 | $3.30 | $3.13 | $2.98 | $2.98 |
| 0048 | Mulched seeding, type U (621-06560) | SYS | 1,222 | $1.70 | $1.60 | $1.75 | $1.68 | $1.60 | $1.60 |
| 0049 | Sodding (621-06574) | SYS | 46 | $49.00 | $48.75 | $53.00 | $69.92 | $48.75 | $48.75 |
| 0050 | Field office, type C (628-09403) | MOS | 9 | $4,850.00 | $4,649.44 | $2,500.00 | $3,520.67 | $4,700.00 | $4,000.00 |
| 0051 | Threaded tie bar assembly , galvanized (703-01540) | EACH | 34 | $75.00 | $50.08 | $85.00 | $86.10 | $86.84 | $72.00 |
| 0052 | Reinforcing bars , galvanized (703-06028) | LBS | 61,483 | $2.15 | $1.67 | $2.75 | $1.86 | $2.37 | $3.60 |
| 0053 | Concrete, C, superstructure (704-51002) | CYS | 204.10 | $1,135.00 | $1,053.90 | $1,300.00 | $1,378.80 | $1,800.00 | $1,805.00 |
| 0054 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $4,800.00 | $4,467.12 | $2,250.00 | $4,816.55 | $4,074.21 | $5,760.00 |
| 0055 | Railing, concrete type PF-1 (706-09962) | LFT | 194 | $110.00 | $146.25 | $125.00 | $158.37 | $108.98 | $175.00 |
| 0056 | Railing, steel type PF-1 (706-11404) | LFT | 211 | $83.00 | $120.00 | $85.00 | $87.15 | $83.00 | $83.00 |
| 0057 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $9,500.00 | $9,443.00 | $6,000.00 | $9,915.15 | $9,498.00 | $9,443.00 |
| 0058 | Patching concrete structures (710-09158) | SFT | 30 | $188.00 | $187.00 | $205.00 | $182.87 | $200.00 | $187.00 |
| 0059 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 121 | $6.00 | $19.28 | $15.00 | $14.42 | $7.73 | $28.00 |
| 0060 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $2,500.00 | $1,083.14 | $600.00 | $1,975.63 | $1,115.25 | $2,000.00 |
| 0061 | Geotextile for underdrains, type 2A (718-12307) | SYS | 92 | $5.50 | $12.33 | $4.50 | $12.18 | $4.92 | $13.00 |
| 0062 | Longitudinal grooving (722-12732) | SYS | 619 | $5.50 | $10.88 | $12.00 | $14.76 | $15.62 | $8.50 |
| 0063 | Epoxy injection, crack preparation (727-90308) | LFT | 60 | $106.00 | $106.00 | $116.00 | $125.78 | $106.00 | $106.00 |
| 0064 | Epoxy injection, epoxy material (727-90309) | GAL | 18 | $10.00 | $10.00 | $11.00 | $54.67 | $10.00 | $10.00 |
| 0065 | Epoxy injection, furnishing equipment , bridge no. 1 (727-93560) | LS | 1 | $965.00 | $965.00 | $2,820.00 | $2,186.84 | $965.00 | $965.00 |
| 0066 | Construction sign, type D (801-03291) | EACH | 2 | $150.00 | $252.00 | $277.00 | $157.50 | $150.00 | $150.00 |
| 0067 | Road closure sign assembly (801-04308) | EACH | 6 | $325.00 | $264.00 | $290.00 | $341.25 | $325.00 | $325.00 |
| 0068 | Detour route marker assembly (801-06625) | EACH | 17 | $135.00 | $175.00 | $192.00 | $141.75 | $135.00 | $135.00 |
| 0069 | Construction sign, type A (801-06640) | EACH | 12 | $180.00 | $236.00 | $260.00 | $189.00 | $180.00 | $180.00 |
| 0070 | Maintaining traffic (801-06775) | LS | 1 | $23,327 | $13,770 | $75,000 | $50,000 | $130,000 | $95,000 |
| 0071 | Barricade, type III-A (801-07118) | LFT | 72 | $16.00 | $16.82 | $18.50 | $16.80 | $16.00 | $16.00 |
| 0072 | Barricade, type III-B (801-07119) | LFT | 44 | $16.00 | $16.82 | $18.50 | $16.80 | $16.00 | $16.00 |
| 0073 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 48 | $32.52 | $32.52 | $36.00 | $34.15 | $32.52 | $19.00 |
| 0074 | Sign, sheet, and supports, remove (802-07059) | EACH | 4 | $91.05 | $91.05 | $100.00 | $95.60 | $91.05 | $60.00 |
| 0075 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 12 | $34.50 | $34.50 | $38.00 | $36.23 | $34.50 | $46.00 |
| 0076 | Sign, ground mounted, reset (802-91122) | EACH | 7 | $143.07 | $143.07 | $157.00 | $150.22 | $143.07 | $275.00 |
| 0077 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 75 | $23.84 | $23.84 | $26.00 | $25.03 | $23.84 | $23.84 |
| 0078 | Handhole, lighting (807-02191) | EACH | 3 | $2,280.57 | $2,280.57 | $2,510.00 | $2,394.60 | $2,280.57 | $2,280.57 |
| 0079 | Wire, XHHW, no. 4 copper, in plastic duct, 4 1/C (807-02352) | LFT | 983 | $22.29 | $22.29 | $24.50 | $23.40 | $22.29 | $22.29 |
| 0080 | Lighting foundation, concrete, with grounding, 24 in. X 24 in. X 96 in. (807-03758) | EACH | 6 | $2,018.08 | $2,018.08 | $2,220.00 | $2,118.98 | $2,018.08 | $2,018.08 |
| 0081 | Light structure, remove (807-03934) | EACH | 2 | $1,035.59 | $1,035.59 | $1,138.00 | $1,087.37 | $1,035.59 | $1,035.59 |
| 0082 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 391 | $50.00 | $50.00 | $55.00 | $52.50 | $50.00 | $50.00 |
| 0083 | Luminaire, low lumen roadway (807-12202) | EACH | 6 | $720.15 | $720.15 | $792.00 | $756.16 | $720.15 | $720.15 |
| 0084 | Light pole, 40 FT E.M.H., 5 FT mast arm, breakaway base (807-85740) | EACH | 6 | $3,611.17 | $3,611.17 | $3,972.00 | $3,791.73 | $3,611.17 | $3,611.17 |
| 0085 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 282 | $2.77 | $2.77 | $3.00 | $2.91 | $2.77 | $2.77 |
| 0086 | Line, multi-component, solid, white, 4 in. (808-10033) | LFT | 2,633 | $1.00 | $1.11 | $1.22 | $1.05 | $1.00 | $1.00 |
| 0087 | Line, multi-component, solid, yellow, 4 in. (808-10034) | LFT | 2,436 | $1.00 | $1.11 | $1.22 | $1.05 | $1.00 | $1.00 |
| 0088 | Grooving for pavement markings (808-12032) | LFT | 4,388 | $0.60 | $0.88 | $0.96 | $0.63 | $0.60 | $0.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.