INDOT contract B-43353-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on October 7, 2026, Starke, LaPorte. 6 bids received; low bid $921,136 by Pioneer Associates Inc.
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 61
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pioneer Associates Inc | $921,136 | Low |
| 2 | Laporte Construction Company Inc | $938,962 | +2.0% |
| 3 | Milestone Contractors LP | $1,120,630 | +22% |
| 4 | Rieth-Riley Construction Co., Inc. | $1,171,177 | +27% |
| 5 | Dunnet Bay Construction Company | $1,266,860 | +38% |
| 6 | Gariup Construction Co Inc | $1,667,500 | +81% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pioneer Associates Inc | 2. Laporte Construction Company Inc | 3. Milestone Contractors LP | 4. Rieth-Riley Construction Co., Inc. | 5. Dunnet Bay Construction Company | 6. Gariup Construction Co Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,000.00 | $12,543 | $9,000.00 | $22,000 | $120,000 | $7,000.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $58,500 | $45,000 | $56,100 | $58,500 | $87,657 | $146,412 |
| 0010 | Clearing and grubbing (201-01015) | LS | 1 | $9,000.00 | $9,000.00 | $7,000.00 | $11,700 | $6,000.00 | $80,000 |
| 0011 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $27,500 | $65,000 | $188,208 | $52,000 | $75,000 | $60,000 |
| 0012 | Stormwater management budget (205-12108) | DOL | 4,590 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Stormwater management implementation (205-12616) | LS | 1 | $1,315.00 | $10,405 | $6,100.00 | $19,000 | $3,500.00 | $23,000 |
| 0014 | Milling, scarification (306-08042) | SYS | 241 | $4.00 | $5.35 | $8.50 | $20.00 | $3.89 | $10.00 |
| 0015 | Milling, transition (306-08043) | SYS | 729 | $4.00 | $5.35 | $4.50 | $13.00 | $7.00 | $10.00 |
| 0016 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 81 | $233.50 | $233.50 | $381.00 | $233.50 | $233.50 | $260.00 |
| 0017 | Joint adhesive (401-11526) | LFT | 720 | $2.00 | $2.00 | $0.10 | $2.00 | $2.00 | $2.30 |
| 0018 | Asphalt for tack coat (406-05521) | SYS | 970 | $1.35 | $1.35 | $2.70 | $1.35 | $1.35 | $1.50 |
| 0019 | PCCP patching, full depth (506-06333) | SYS | 10 | $650.00 | $363.72 | $550.00 | $800.00 | $1,350.00 | $1,100.00 |
| 0020 | Joints in PCCP, saw and seal (507-08272) | LFT | 110 | $10.00 | $16.21 | $10.00 | $20.00 | $31.82 | $20.00 |
| 0021 | Barrier delineator (602-06729) | EACH | 18 | $35.00 | $18.00 | $17.92 | $17.92 | $17.92 | $20.00 |
| 0022 | Riprap, class 1 (616-05688) | TON | 856 | $170.00 | $95.00 | $140.00 | $180.00 | $150.00 | $400.00 |
| 0023 | Geotextile for riprap, type 1A (616-12246) | SYS | 696 | $3.00 | $9.23 | $2.00 | $3.00 | $4.25 | $5.00 |
| 0024 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $325.00 | $325.00 | $500.00 | $500.00 | $325.00 | $600.00 |
| 0025 | Mulched seeding, type R (621-06559) | SYS | 1,757 | $3.00 | $2.26 | $26.00 | $1.29 | $2.26 | $1.50 |
| 0026 | Seed mixture, floodplain (621-12612) | LBS | 10 | $290.00 | $290.00 | $355.00 | $355.00 | $290.00 | $400.00 |
| 0027 | Field office, type C (628-09403) | MOS | 12 | $3,300.00 | $2,500.00 | $3,000.00 | $3,250.00 | $1,700.00 | $3,500.00 |
| 0028 | Grates, basins, and fittings, cast iron (702-12076) | EACH | 3 | $2,400.00 | $2,668.23 | $2,550.00 | $3,500.00 | $2,500.00 | $2,700.00 |
| 0029 | Reinforcing bars, epoxy coated (703-06029) | LBS | 520 | $5.00 | $2.16 | $5.00 | $6.00 | $15.00 | $6.00 |
| 0030 | Inertial profiler, bridge encounter (704-000080) | LS | 1 | $5,000.00 | $7,990.00 | $3,000.00 | $7,990.00 | $7,990.00 | $9,000.00 |
| 0031 | Corrective grinding, bridge encounter (704-000082) | LS | 1 | $12,500 | $28,000 | $10,900 | $45,000 | $28,700 | $32,000 |
| 0032 | Concrete, C, superstructure (704-51002) | CYS | 4.80 | $3,500.00 | $4,692.04 | $10,100 | $3,500.00 | $2,800.00 | $2,150.00 |
| 0033 | Railing, concrete type FC , modified (706-11600) | CYS | 1.80 | $3,500.00 | $4,255.94 | $3,475.00 | $3,800.00 | $3,800.00 | $5,000.00 |
| 0034 | Surface seal (709-51821) | LS | 1 | $8,000.00 | $7,307.00 | $6,500.00 | $8,280.00 | $4,300.00 | $9,500.00 |
| 0035 | Patching concrete structures (710-09158) | SFT | 106 | $200.00 | $100.00 | $180.00 | $220.00 | $198.00 | $210.00 |
| 0036 | Pipe, roadway drain casting extension (715-10238) | EACH | 13 | $750.00 | $438.48 | $745.00 | $1,500.00 | $450.00 | $1,000.00 |
| 0037 | Hydrodemolition (722-01066) | SYS | 1,383 | $70.00 | $106.00 | $88.00 | $90.00 | $80.00 | $60.00 |
| 0038 | Bridge deck overlay budget (722-12380) | DOL | 31,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0039 | Bridge deck, remove concrete surface (722-12464) | SYS | 1,383 | $7.00 | $25.00 | $5.00 | $5.00 | $11.00 | $11.00 |
| 0040 | Longitudinal grooving (722-12732) | SYS | 1,383 | $6.00 | $9.97 | $9.00 | $10.00 | $8.50 | $6.00 |
| 0041 | Bridge deck patching, full depth (722-51401) | SFT | 286 | $70.00 | $65.00 | $100.00 | $40.00 | $125.00 | $70.00 |
| 0042 | Bridge deck overlay, latex modified (722-51842) | SYS | 1,383 | $150.00 | $113.01 | $92.00 | $118.00 | $60.00 | $135.00 |
| 0043 | Overlay dam (722-51874) | SFT | 292 | $40.00 | $94.11 | $59.00 | $90.00 | $80.00 | $110.00 |
| 0044 | Bridge expansion joint seal, type PCF, replace (724-12779) | LFT | 72 | $120.00 | $64.46 | $77.00 | $75.00 | $100.00 | $140.00 |
| 0045 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 30 | $10.00 | $10.00 | $100.00 | $100.00 | $60.00 | $55.00 |
| 0046 | Epoxy injection, crack preparation (727-90308) | LFT | 346 | $65.00 | $65.00 | $110.00 | $110.00 | $113.00 | $130.00 |
| 0047 | Epoxy injection, furnishing equipment (727-93560) | LS | 1 | $750.00 | $750.00 | $2,200.00 | $2,200.00 | $965.00 | $1,680.00 |
| 0048 | Road closure sign assembly (801-04308) | EACH | 4 | $210.00 | $210.00 | $210.00 | $210.00 | $210.00 | $235.00 |
| 0049 | Detour route marker assembly (801-06625) | EACH | 51 | $121.00 | $121.00 | $121.00 | $121.00 | $121.00 | $135.00 |
| 0050 | Construction sign, type A (801-06640) | EACH | 14 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 | $180.00 |
| 0051 | Maintaining traffic (801-06775) | LS | 1 | $10,500 | $6,259.00 | $5,500.00 | $15,000 | $25,000 | $20,000 |
| 0052 | Barricade, type III-A (801-07118) | LFT | 64 | $14.00 | $13.72 | $13.72 | $13.72 | $13.72 | $16.00 |
| 0053 | Barricade, type III-B (801-07119) | LFT | 52 | $14.00 | $13.72 | $13.72 | $13.72 | $13.72 | $16.00 |
| 0054 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,184 | $1.00 | $0.72 | $0.72 | $0.72 | $0.72 | $1.00 |
| 0055 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 592 | $1.00 | $0.72 | $0.72 | $0.72 | $0.72 | $1.00 |
| 0056 | Grooving for pavement markings (808-12032) | LFT | 1,924 | $1.00 | $0.51 | $0.51 | $0.51 | $0.51 | $1.00 |
| 0057 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 148 | $1.00 | $0.72 | $0.72 | $0.72 | $0.72 | $1.00 |
| 0058 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 10 | $30.00 | $15.25 | $15.25 | $15.25 | $1.00 | $17.00 |
| 0059 | Snowplowable raised pavement marker (808-75998) | EACH | 6 | $115.00 | $112.00 | $112.00 | $112.00 | $112.00 | $125.00 |
| 0060 | Cofferdam (206-51235) | LS | 1 | $35,000 | $55,000 | $55,000 | $145,000 | $250,000 | $300,000 |
| 0061 | Guardrail, reset (601-06035) | LFT | 230 | $58.00 | $15.00 | $58.00 | $58.00 | $58.00 | $65.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.