INDOT contract B-42775-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on February 11, 2026, Noble, Fort Wayne. 6 bids received; low bid $1,387,855 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 82
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $1,387,855 | Low |
| 2 | R L McCoy Inc | $1,541,001 | +11% |
| 3 | Laporte Construction Company Inc | $1,658,208 | +19% |
| 4 | E & B Paving LLC | $1,688,500 | +22% |
| 5 | Rieth-Riley Construction Co., Inc. | $1,818,922 | +31% |
| 6 | Icc Group Inc | $1,946,000 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. R L McCoy Inc | 3. Laporte Construction Company Inc | 4. E & B Paving LLC | 5. Rieth-Riley Construction Co., Inc. | 6. Icc Group Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,500 | $16,000 | $18,272 | $40,000 | $30,000 | $30,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $69,393 | $77,000 | $75,000 | $84,688 | $90,000 | $95,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $10,000 | $30,800 | $15,000 | $33,764 | $36,000 | $38,900 |
| 0011 | Present structure, remove, structure no. 57-00069 (202-51330) | LS | 1 | $73,000 | $180,000 | $222,927 | $211,000 | $277,000 | $214,062 |
| 0012 | Sign, remove (202-74035) | EACH | 4 | $99.00 | $99.00 | $99.00 | $99.00 | $99.00 | $99.00 |
| 0013 | Excavation, common (203-02000) | CYS | 1,565 | $38.50 | $60.00 | $61.34 | $85.00 | $0.01 | $39.70 |
| 0014 | Borrow (203-02070) | CYS | 1,485 | $43.00 | $42.00 | $45.40 | $0.01 | $0.01 | $85.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 10,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $1,400.00 | $4,000.00 | $14,600 | $15,000 | $13,000 | $11,150 |
| 0017 | Excavation, X (206-51215) | CYS | 10 | $420.00 | $300.00 | $1,000.00 | $500.00 | $435.00 | $130.00 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 315 | $64.00 | $42.00 | $46.58 | $35.00 | $60.00 | $44.00 |
| 0019 | Subgrade treatment, type II (207-08264) | SYS | 210 | $21.00 | $38.00 | $29.40 | $25.00 | $50.00 | $25.00 |
| 0020 | Subgrade treatment, type IC (207-09935) | SYS | 1,519 | $38.00 | $48.00 | $49.77 | $35.00 | $40.00 | $55.00 |
| 0021 | B borrow (211-02050) | CYS | 570 | $69.00 | $59.00 | $67.31 | $25.00 | $120.00 | $90.00 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 97 | $176.00 | $150.00 | $116.32 | $165.00 | $155.00 | $135.00 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 142 | $11.00 | $8.00 | $10.29 | $5.00 | $10.00 | $4.00 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 145 | $124.00 | $120.00 | $137.26 | $150.00 | $125.00 | $125.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 36 | $198.00 | $183.00 | $193.99 | $165.00 | $250.00 | $125.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 147 | $57.00 | $60.00 | $77.04 | $50.00 | $133.00 | $60.00 |
| 0027 | Widening with HMA, type C (304-07494) | TON | 6 | $500.00 | $250.00 | $250.00 | $580.00 | $225.00 | $420.00 |
| 0028 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 107 | $15.00 | $40.00 | $35.45 | $25.00 | $50.00 | $31.00 |
| 0029 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 115 | $185.00 | $118.00 | $118.00 | $200.00 | $170.00 | $118.00 |
| 0031 | Joint adhesive (401-11526) | LFT | 973 | $1.00 | $0.70 | $0.70 | $0.32 | $1.00 | $0.70 |
| 0032 | Asphalt for tack coat (406-05520) | TON | 1 | $1,400.00 | $786.00 | $786.00 | $600.00 | $850.00 | $786.00 |
| 0033 | Guardrail transition, type TGB (601-01522) | EACH | 1 | $3,077.00 | $3,077.00 | $3,077.00 | $3,077.00 | $3,077.00 | $3,077.00 |
| 0034 | Guardrail terminal system, W-beam, curved, type 3 (601-01846) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0035 | Guardrail, remove (601-02241) | LFT | 240 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 0036 | Impact attenuator, R1-W1, TL-2 (601-06234) | EACH | 1 | $24,052 | $24,052 | $24,052 | $35,000 | $24,052 | $24,052 |
| 0037 | Guardrail transition, MGS without curb (601-12292) | EACH | 2 | $3,045.00 | $3,045.00 | $3,045.00 | $3,045.00 | $3,045.00 | $3,045.00 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 | $2,900.00 |
| 0039 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 31.25 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 0040 | Barrier delineator (602-06729) | EACH | 8 | $20.00 | $24.00 | $25.00 | $23.47 | $24.88 | $24.88 |
| 0041 | Fence, relocate (603-03398) | LFT | 60 | $48.00 | $48.00 | $48.00 | $48.00 | $60.00 | $48.00 |
| 0042 | Curb, integral concrete, type B (605-06095) | LFT | 5 | $130.00 | $230.00 | $127.05 | $150.00 | $87.00 | $39.12 |
| 0043 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 142 | $147.00 | $235.00 | $150.00 | $235.00 | $180.00 | $200.00 |
| 0044 | HMA for approaches, type B (610-07487) | TON | 21 | $210.00 | $120.00 | $120.00 | $465.00 | $225.00 | $120.00 |
| 0045 | Mailbox assembly, single (611-06497) | EACH | 2 | $289.00 | $289.00 | $289.00 | $289.00 | $289.00 | $289.00 |
| 0046 | Right-of-way marker (615-06490) | EACH | 14 | $169.00 | $169.00 | $169.00 | $169.00 | $169.00 | $169.00 |
| 0047 | Monument, type B (615-06505) | EACH | 4 | $955.00 | $955.00 | $955.00 | $955.00 | $955.00 | $955.00 |
| 0048 | Monument, type C (615-06510) | EACH | 1 | $882.00 | $882.00 | $882.00 | $882.00 | $882.00 | $882.00 |
| 0049 | Riprap, revetment (616-06405) | TON | 608 | $51.00 | $70.00 | $96.00 | $105.00 | $90.00 | $125.00 |
| 0050 | Geotextile for riprap, type 1A (616-12246) | SYS | 687 | $4.00 | $6.00 | $6.48 | $5.00 | $3.00 | $3.00 |
| 0052 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 | $650.00 |
| 0053 | Mulched seeding, type R (621-06559) | SYS | 1,580 | $3.02 | $3.02 | $3.02 | $3.02 | $3.02 | $3.02 |
| 0054 | Water (621-06567) | KGAL | 1 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0055 | Sodding, nursery (621-06575) | SYS | 82 | $36.10 | $36.10 | $36.10 | $36.10 | $36.10 | $36.10 |
| 0056 | Field office, type A (628-09401) | MOS | 11 | $2,300.00 | $3,300.00 | $2,000.00 | $3,000.00 | $3,250.00 | $2,364.00 |
| 0057 | Computer system equipment (628-11976) | EACH | 1 | $495.00 | $850.00 | $700.00 | $700.00 | $530.00 | $495.00 |
| 0058 | Test pile, indicator, production (701-09558) | LFT | 110 | $127.00 | $80.00 | $100.00 | $85.00 | $43.00 | $225.00 |
| 0059 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $5,500.00 | $1,500.00 | $2,025.69 | $2,500.00 | $2,500.00 | $1,650.00 |
| 0060 | Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663) | LFT | 445 | $104.00 | $80.00 | $100.00 | $75.00 | $40.00 | $120.00 |
| 0061 | Concrete, C, substructure (702-92857) | CYS | 46.70 | $1,500.00 | $850.00 | $1,500.00 | $1,250.00 | $1,500.00 | $1,350.00 |
| 0062 | Reinforcing bars, epoxy coated (703-06029) | LBS | 59,705 | $1.90 | $1.45 | $1.36 | $1.50 | $1.60 | $1.50 |
| 0063 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 34 | $40.00 | $49.00 | $44.20 | $15.00 | $60.00 | $31.95 |
| 0064 | Concrete, C, superstructure (704-51002) | CYS | 124.40 | $1,050.00 | $1,150.00 | $1,408.94 | $1,500.00 | $1,800.00 | $1,400.00 |
| 0065 | Railing, concrete type FC (706-11600) | CYS | 19 | $861.00 | $890.00 | $1,759.04 | $1,000.00 | $890.00 | $890.00 |
| 0066 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,600.00 | $2,500.00 | $2,291.58 | $4,000.00 | $2,500.00 | $2,500.00 |
| 0067 | Structural member, concrete, bulb-T beam, 42 in. X 49 in. (707-08158) | LFT | 388 | $630.00 | $707.00 | $600.00 | $675.00 | $950.00 | $1,150.00 |
| 0068 | Surface seal (709-51821) | LS | 1 | $900.00 | $500.00 | $500.00 | $0.01 | $3,500.00 | $3,300.00 |
| 0069 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 176 | $16.50 | $27.00 | $26.58 | $15.00 | $16.00 | $16.00 |
| 0070 | Longitudinal grooving (722-12732) | SYS | 438 | $2.28 | $11.00 | $21.17 | $10.00 | $14.00 | $8.20 |
| 0071 | Road closure sign assembly (801-04308) | EACH | 5 | $375.00 | $257.00 | $257.00 | $375.00 | $257.00 | $257.00 |
| 0072 | Detour route marker assembly (801-06625) | EACH | 32 | $175.00 | $153.00 | $153.00 | $175.00 | $153.00 | $153.00 |
| 0073 | Construction sign, type A (801-06640) | EACH | 12 | $250.00 | $207.00 | $207.00 | $250.00 | $207.00 | $207.00 |
| 0074 | Maintaining traffic (801-06775) | LS | 1 | $2,964.30 | $10,000 | $28,579 | $25,000 | $40,130 | $5,720.00 |
| 0075 | Barricade, type III-A (801-07118) | LFT | 48 | $18.00 | $15.41 | $15.41 | $18.00 | $15.41 | $15.41 |
| 0076 | Barricade, type III-B (801-07119) | LFT | 36 | $18.00 | $15.41 | $15.41 | $18.00 | $15.41 | $15.41 |
| 0077 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 20 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 | $70.00 |
| 0078 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 22.50 | $30.00 | $30.00 | $40.00 | $30.00 | $30.00 | $30.00 |
| 0079 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 1,200 | $1.25 | $0.81 | $0.81 | $1.25 | $0.81 | $0.81 |
| 0080 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 1,200 | $1.25 | $0.81 | $0.81 | $1.25 | $0.81 | $0.81 |
| 0081 | Grooving for pavement markings (808-12032) | LFT | 1,846 | $2.00 | $0.88 | $0.88 | $2.00 | $0.88 | $0.88 |
| 0082 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 212 | $135.00 | $88.00 | $88.00 | $142.00 | $145.00 | $88.00 |
| 0083 | Curb, concrete, type B (605-06121) | LFT | 20 | $103.00 | $120.00 | $127.24 | $165.00 | $97.00 | $39.12 |
| 0084 | Geotextile for riprap, type 2A (616-12248) | SYS | 801 | $4.80 | $6.00 | $6.30 | $5.00 | $4.98 | $4.86 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.