INDOT contract B-41435-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Carroll, LaPorte. 8 bids received; low bid $1,344,100 by Duncan Robertson Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 74
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Duncan Robertson Inc | $1,344,100 | Low |
| 2 | Beaty Construction Inc | $1,362,005 | +1.0% |
| 3 | E & B Paving LLC | $1,379,000 | +3.0% |
| 4 | Milestone Contractors LP | $1,393,700 | +4.0% |
| 5 | His Constructors Inc | $1,395,656 | +4.0% |
| 6 | Laporte Construction Company Inc | $1,434,721 | +7.0% |
| 7 | Superior Construction Co Inc | $1,501,687 | +12% |
| 8 | Rieth-Riley Construction Co., Inc. | $1,732,993 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Duncan Robertson Inc | 2. Beaty Construction Inc | 3. E & B Paving LLC | 4. Milestone Contractors LP | 5. His Constructors Inc | 6. Laporte Construction Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $12,000 | $20,000 | $15,000 | $12,500 | $11,000 | $15,122 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $65,000 | $68,099 | $68,950 | $69,900 | $83,000 | $72,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $6,000.00 | $6,809.00 | $6,895.00 | $7,000.00 | $6,887.42 | $6,810.99 |
| 0011 | Pavement removal (202-02240) | SYS | 196 | $50.00 | $50.00 | $15.00 | $35.00 | $30.00 | $41.97 |
| 0012 | Gutter turnout, reinforced concrete, remove (202-02276) | EACH | 2 | $200.00 | $415.00 | $1.00 | $750.00 | $1,100.00 | $1,045.95 |
| 0013 | Railing, remove (202-51133) | LFT | 82 | $9.00 | $15.00 | $1.00 | $23.00 | $50.00 | $91.55 |
| 0014 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $145,000 | $150,000 | $273,000 | $160,000 | $75,000 | $200,000 |
| 0015 | Excavation, common (203-02000) | CYS | 135 | $35.00 | $55.05 | $120.00 | $56.00 | $67.00 | $97.32 |
| 0016 | Borrow (203-02070) | CYS | 135 | $35.00 | $65.00 | $1.00 | $110.00 | $47.00 | $91.88 |
| 0017 | Linear grading (203-08607) | LFT | 445 | $7.00 | $3.09 | $3.00 | $8.50 | $7.00 | $14.51 |
| 0018 | Stormwater management budget (205-12108) | DOL | 13,117 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $18,500 | $10,000 | $2,500.00 | $1,800.00 | $10,000 | $11,610 |
| 0020 | Cofferdam (206-51235) | LS | 1 | $10,000 | $25,000 | $29,858 | $20,300 | $50,000 | $84,901 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 112 | $70.00 | $41.00 | $100.00 | $50.00 | $60.00 | $65.60 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 62 | $125.00 | $158.67 | $100.00 | $200.00 | $150.00 | $149.83 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 294 | $6.00 | $4.59 | $10.00 | $8.00 | $5.00 | $9.68 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 48 | $150.00 | $108.12 | $100.00 | $150.00 | $67.00 | $90.11 |
| 0025 | Compacted aggregate, no. 73 (303-07449) | TON | 17 | $75.00 | $155.84 | $200.00 | $73.00 | $73.00 | $80.44 |
| 0026 | HMA patching, full depth, type B (304-12623) | TON | 48 | $314.00 | $286.00 | $270.00 | $249.00 | $350.00 | $330.00 |
| 0027 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 289 | $18.00 | $18.00 | $25.00 | $20.00 | $16.00 | $8.48 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 33 | $314.00 | $286.00 | $480.00 | $347.00 | $330.00 | $310.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 124 | $5.50 | $5.00 | $1.50 | $1.00 | $0.05 | $0.05 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 448 | $0.27 | $0.25 | $2.35 | $0.50 | $1.30 | $1.32 |
| 0031 | Guardrail terminal system, W-beam curved, type 3 (601-01846) | EACH | 1 | $3,300.00 | $2,600.00 | $3,000.00 | $3,000.00 | $3,200.00 | $2,900.00 |
| 0032 | Guardrail, remove (601-02241) | LFT | 746 | $4.40 | $5.50 | $4.00 | $4.00 | $4.25 | $3.00 |
| 0033 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 432 | $20.00 | $22.00 | $18.00 | $18.00 | $19.00 | $25.00 |
| 0034 | Guardrail height transition, MGS (601-12289) | EACH | 2 | $990.00 | $925.00 | $900.00 | $900.00 | $960.00 | $950.00 |
| 0035 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,245.00 | $2,975.00 | $2,950.00 | $2,950.00 | $3,140.00 | $3,194.00 |
| 0036 | Guardrail end treatment, type OS (601-94689) | EACH | 2 | $3,080.00 | $3,250.00 | $2,800.00 | $2,800.00 | $3,000.00 | $2,900.00 |
| 0037 | Barrier delineator (602-06729) | EACH | 12 | $25.00 | $15.00 | $10.00 | $30.00 | $160.00 | $15.00 |
| 0038 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 124 | $12.00 | $13.78 | $9.25 | $2.00 | $2.10 | $2.00 |
| 0039 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 182 | $225.00 | $185.00 | $180.00 | $180.00 | $300.00 | $203.06 |
| 0040 | Monument, type B (615-06505) | EACH | 2 | $1,155.00 | $1,360.00 | $1,050.00 | $1,050.00 | $1,100.00 | $898.00 |
| 0041 | Riprap, class 1 (616-05688) | TON | 1,003 | $75.00 | $95.06 | $75.00 | $150.00 | $100.00 | $100.00 |
| 0042 | Riprap, revetment (616-06405) | TON | 118 | $65.00 | $69.50 | $70.00 | $140.00 | $75.00 | $57.60 |
| 0043 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,241 | $4.50 | $1.50 | $5.00 | $1.70 | $3.00 | $4.82 |
| 0044 | Sodding (621-06574) | SYS | 120 | $31.00 | $28.20 | $28.20 | $28.20 | $30.00 | $30.00 |
| 0045 | Field office, type C (628-09403) | MOS | 10 | $2,250.00 | $1,800.00 | $3,000.00 | $4,500.00 | $1,600.00 | $3,500.00 |
| 0046 | Dynamic pile load test (701-06011) | EACH | 2 | $2,000.00 | $2,600.00 | $5,000.00 | $3,750.00 | $9,500.00 | $2,500.00 |
| 0047 | Test pile, dynamic, production (701-09557) | LFT | 142 | $85.00 | $50.00 | $120.00 | $70.00 | $300.00 | $160.72 |
| 0048 | Test pile, dynamic, restrike (701-09559) | EACH | 2 | $2,000.00 | $1,450.00 | $5,000.00 | $4,000.00 | $1,750.00 | $2,500.00 |
| 0049 | Pile, steel pipe, 0.375 in., diameter 14 in. (701-09665) | LFT | 488 | $85.00 | $110.35 | $115.00 | $130.00 | $240.00 | $100.00 |
| 0050 | Concrete, C, substructure (702-92857) | CYS | 66.20 | $800.00 | $960.00 | $1,000.00 | $1,150.00 | $1,250.00 | $881.42 |
| 0051 | Reinforcing bars, epoxy coated (703-06029) | LBS | 56,644 | $1.50 | $1.57 | $1.50 | $1.60 | $1.42 | $1.31 |
| 0052 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 42 | $65.00 | $75.00 | $25.00 | $40.00 | $37.00 | $43.34 |
| 0053 | Concrete, C, superstructure (704-51002) | CYS | 138.20 | $1,400.00 | $1,110.00 | $750.00 | $1,250.00 | $1,400.00 | $1,334.59 |
| 0054 | Railing, concrete type FC (706-11600) | CYS | 16.60 | $1,400.00 | $980.00 | $750.00 | $1,000.00 | $1,300.00 | $1,587.42 |
| 0055 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $2,500.00 | $1,100.00 | $2,500.00 | $4,500.00 | $2,700.00 | $3,338.21 |
| 0056 | Structural member, concrete, I-beam, 54 in. X 20 in. (707-05985) | LFT | 344 | $900.00 | $905.00 | $800.00 | $650.00 | $660.00 | $639.59 |
| 0057 | Surface seal (709-51821) | LS | 1 | $3,500.00 | $1,500.00 | $0.01 | $1.00 | $6,200.00 | $1,000.00 |
| 0058 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 102 | $17.00 | $11.97 | $15.00 | $31.00 | $15.00 | $26.64 |
| 0059 | Geotextile for underdrains, type 1A (718-12305) | SYS | 118 | $3.50 | $4.41 | $5.00 | $2.60 | $5.00 | $12.37 |
| 0060 | Longitudinal grooving (722-12732) | SYS | 531 | $10.00 | $12.00 | $10.00 | $6.00 | $7.00 | $19.06 |
| 0061 | Road closure sign assembly (801-04308) | EACH | 6 | $357.00 | $325.00 | $325.00 | $325.00 | $346.00 | $325.00 |
| 0062 | Detour route marker assembly (801-06625) | EACH | 30 | $148.00 | $135.00 | $135.00 | $135.00 | $144.00 | $135.00 |
| 0063 | Construction sign, type A (801-06640) | EACH | 12 | $192.00 | $175.00 | $175.00 | $175.00 | $187.00 | $175.00 |
| 0064 | Construction sign, type B (801-06645) | EACH | 8 | $110.00 | $100.00 | $100.00 | $100.00 | $107.00 | $100.00 |
| 0065 | Maintaining traffic (801-06775) | LS | 1 | $30,000 | $50,000 | $20,000 | $17,688 | $5,000.00 | $8,317.32 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 48 | $17.50 | $16.00 | $16.00 | $16.00 | $17.00 | $16.00 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 96 | $17.50 | $16.00 | $16.00 | $16.00 | $17.00 | $16.00 |
| 0068 | Reference post (802-04893) | EACH | 2 | $462.00 | $200.00 | $250.00 | $250.00 | $450.00 | $420.00 |
| 0069 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 20 | $30.00 | $26.00 | $28.00 | $28.00 | $30.00 | $42.00 |
| 0070 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 9 | $24.00 | $40.00 | $22.00 | $22.00 | $25.00 | $53.00 |
| 0071 | Sign, ground mounted, reset (802-91122) | EACH | 5 | $358.00 | $325.00 | $325.00 | $325.00 | $350.00 | $104.00 |
| 0072 | Delineator post, flexible, reset (804-97955) | EACH | 11 | $110.00 | $44.00 | $165.00 | $65.00 | $107.00 | $100.00 |
| 0073 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 503 | $1.10 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 |
| 0074 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 503 | $1.10 | $1.00 | $1.00 | $1.00 | $1.10 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.