INDOT contract B-45899-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on January 14, 2026, Fulton, LaPorte. 4 bids received; low bid $2,250,000 by Morphey Construction Inc..

Owner
Indiana DOT
Letting
14 JAN 2026
Pay items
77
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Morphey Construction Inc.$2,250,000Low
2Milestone Contractors LP$2,734,325+22%
3Rieth-Riley Construction Co., Inc.$3,399,934+51%
4Laporte Construction Company Inc$4,895,998+118%
INDOT contract B-45899-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Morphey Construction Inc.2. Milestone Contractors LP3. Rieth-Riley Construction Co., Inc.4. Laporte Construction Company Inc
0001Construction engineering (105-06845)LS1$35,000$50,000$31,000$30,000
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$112,500$135,000$459,420$215,000
0011Tree, 6 in., remove (201-02245)EACH1$1,000.00$27,000$987.00$1,000.00
0012Clearing right-of-way (201-52370)LS1$20,000$25,000$67,000$94,000
0013Present structure, remove, structure no. 1 (202-51330)LS1$30,000$120,000$68,110$600,000
0014Sign, remove (202-74035)EACH6$50.00$150.00$100.00$17.00
0015Post, remove (202-94747)EACH5$50.00$150.00$191.00$101.00
0016Excavation, common (203-02000)CYS260$60.00$80.00$123.90$79.33
0017Borrow (203-02070)CYS84$70.00$0.25$37.90$63.30
0018Pump around (205-11626)EACH2$15,000$1.00$1,370.00$65,000
0019Stormwater management budget (205-12108)DOL32,073$1.00$1.00$1.00$1.00
0020Stormwater management implementation (205-12616)LS1$2,000.00$5,000.00$40,725$17,428
0021Excavation, wet (206-51220)CYS70$120.00$85.00$123.90$483.21
0023Subgrade treatment, type IC (207-09935)SYS1,230$50.00$40.00$51.80$60.99
0024Structure backfill, type 5 (211-09268)CYS1,083$220.00$190.00$277.10$212.99
0025Geogrid, type IB (214-11796)SYS1,230$5.00$2.50$3.60$5.89
0026Compacted aggregate, no. 5 (301-12232)CYS41$150.00$525.00$172.80$140.66
0027Compacted aggregate, no. 53 (301-12234)CYS41$140.00$500.00$172.80$89.32
0028Compacted aggregate, no. 73 (303-07449)TON200$88.00$45.00$76.90$63.36
0029Milling, asphalt, 1 1/2 in. (306-08034)SYS753$15.00$15.00$4.40$17.09
0030QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON100$180.00$278.00$215.00$215.00
0031QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON79$160.00$275.00$210.00$210.00
0032QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON243$120.00$210.00$180.00$180.00
0033Joint adhesive (401-11526)LFT1,619$1.00$0.50$0.50$0.50
0034Asphalt for tack coat (406-05521)SYS1,015$2.00$2.25$2.40$1.40
0035QC/QA-PCCP, 12 in. (501-06323)SYS285$150.00$140.00$253.60$250.00
0036D-1 contraction joint (503-05240)LFT410$25.00$30.00$23.50$21.29
0037Guardrail transition, type TGB (601-01522)EACH1$3,140.00$3,140.00$3,400.00$3,140.00
0038Guardrail terminal system, W-beam, curved, type 1 (601-01700)EACH1$3,090.00$3,090.00$3,000.00$3,090.00
0039Guardrail terminal system, W-beam, curved, type 4 (601-01740)EACH1$3,100.00$3,100.00$3,150.00$3,100.00
0040Guardrail, remove (601-02241)LFT669$3.00$3.00$6.50$3.00
0041Guardrail height transition, MGS (601-12289)EACH7$1,223.00$1,223.00$1,000.00$1,223.00
0042Guardrail transition, MGS with curb (601-12291)EACH7$3,209.00$3,209.00$3,625.00$3,209.00
0043Curb, concrete (605-06120)LFT305$70.00$35.00$68.50$129.21
0044Right-of-way marker (615-06490)EACH13$130.00$126.00$200.00$126.00
0045Monument, type B (615-06505)EACH4$975.00$975.00$950.00$975.00
0046Riprap, class 1 (616-05688)TON211$175.00$125.00$221.10$151.08
0047Riprap, revetment (616-06405)TON219$130.00$94.50$163.60$92.57
0048Geotextile for riprap, type 1A (616-12246)SYS431$5.00$1.50$4.80$9.37
0049Geotextile for riprap, type 2B (616-12249)SYS291$5.00$3.00$7.20$11.33
0050Mobilization and demobilization for seeding (621-01004)EACH2$425.00$425.00$425.00$425.00
0051Mulched seeding, type R (621-06559)SYS1,464$10.00$3.84$3.84$3.84
0052Seed mixture, floodplain (621-12612)LBS2$500.00$444.00$444.00$444.00
0053Field office, type C (628-09403)MOS12$2,000.00$2,800.00$3,300.00$3,000.00
0054Reinforcing bars, epoxy coated (703-06029)LBS7,810$2.00$2.00$2.40$1.62
0055Reinforced concrete moment slab, 12 in. (706-08496)SYS262$245.00$175.00$253.60$215.00
0056Railing, concrete type FC (706-09960)LFT122$600.00$175.00$187.00$205.26
0057Concrete bridge railing transition, type TFC (706-11620)EACH8$6,000.00$3,800.00$2,500.00$3,901.83
0058Surface seal , bridge no 1 (709-51821)LS1$5,000.00$1.00$1.00$500.00
0060Structure, reinforced concrete, three-sided (723-12840)LFT84$11,000$12,450$12,387$11,000
0061Road closure sign assembly (801-04308)EACH16$200.00$200.00$241.00$200.00
0062Detour route marker assembly (801-06625)EACH72$75.00$75.00$139.00$75.00
0063Construction sign, type A (801-06640)EACH18$135.00$135.00$179.00$135.00
0064Maintaining traffic (801-06775)LS1$30,000$25,000$3,000.00$28,249
0065Barricade, type III-A (801-07118)LFT96$13.00$13.00$14.41$13.00
0066Barricade, type III-B (801-07119)LFT136$13.00$13.00$14.41$13.00
0067Reference post (802-04893)EACH4$360.00$360.00$375.00$360.00
0068Sign post, square, type 1, unreinforced anchor base (802-05704)LFT162$24.00$24.00$19.00$24.00
0069Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT42$51.00$51.00$36.00$51.00
0070Line, paint, broken, yellow, 6 in. (808-12764)LFT60$2.50$2.50$1.43$2.50
0071Line, paint, solid, white, 6 in. (808-75007)LFT876$2.00$2.00$1.01$2.00
0072Line, paint, solid, yellow, 6 in. (808-75047)LFT438$2.00$2.00$1.01$2.00
0073Snowplowable raised pavement marker, remove (808-75996)EACH7$20.00$86.89$56.00$100.00
0074Snowplowable raised pavement marker (808-75998)EACH7$100.00$100.00$88.91$100.00
0075Cofferdam , bridge no. 1 (206-51235)LS1$15,000$180,000$286,000$635,000
0076Cofferdam , bridge no. 2 (206-51235)LS1$67,768$160,000$286,000$635,000
0077Present structure, remove, structure no. 2 (202-51330)LS1$22,237$110,000$68,110$600,000
0078Surface seal , bridge no. 2 (709-51821)LS1$5,000.00$1.00$1.00$500.00
0079Waterproofing membrane, type 2 (714-000086)SFT3,980$5.00$7.00$9.15$10.01
INDOT contract B-45899-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.