INDOT contract B-44198-A bid tabulation
BRIDGE DECK OVERLAY. Let by Indiana DOT on March 11, 2026, Lake, LaPorte. 3 bids received; low bid $4,236,141 by Superior Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 109
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Superior Construction Co Inc | $4,236,141 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $4,424,103 | +4.0% |
| 3 | Dunnet Bay Construction Company | $4,479,418 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Superior Construction Co Inc | 2. Rieth-Riley Construction Co., Inc. | 3. Dunnet Bay Construction Company |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $30,000 | $98,000 | $220,000 |
| 0002 | Railroad flagging budget (107-12976) | DOL | 181,500 | $1.00 | $1.00 | $1.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $210,000 | $220,000 | $223,400 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $25,000 | $24,000 | $45,000 |
| 0012 | Pavement removal (202-02240) | SYS | 3,334 | $25.00 | $30.00 | $35.00 |
| 0013 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $200,000 | $110,000 | $250,000 |
| 0014 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $200,000 | $125,000 | $250,000 |
| 0015 | Excavation, common (203-02000) | CYS | 1,650 | $22.00 | $56.00 | $50.00 |
| 0016 | Excavation, unclassified (203-02020) | CYS | 55 | $45.00 | $36.00 | $50.00 |
| 0017 | Borrow (203-02070) | CYS | 263 | $5.00 | $24.00 | $45.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 28,604 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $10,000 | $10,250 | $10,000 |
| 0020 | Excavation, foundation, unclassified (206-51230) | CYS | 80 | $40.00 | $92.00 | $45.00 |
| 0021 | Subgrade treatment, type IC (207-09935) | SYS | 3,332 | $32.00 | $40.00 | $45.00 |
| 0022 | Aggregate for end bent backfill (211-06467) | CYS | 80 | $85.00 | $90.00 | $250.00 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,332 | $3.70 | $3.70 | $3.00 |
| 0024 | Subbase for PCCP (302-06464) | CYS | 833 | $65.00 | $60.30 | $110.00 |
| 0025 | Compacted aggregate, no. 53 (303-01180) | TON | 772 | $45.00 | $30.00 | $50.00 |
| 0026 | Compacted aggregate, no. 73 (303-07449) | TON | 456 | $46.00 | $95.40 | $50.00 |
| 0027 | PCCP, 12 in. (502-06329) | SYS | 1,750 | $115.00 | $160.00 | $140.00 |
| 0028 | Retrofitted tie bars (503-03489) | EACH | 176 | $50.00 | $53.50 | $60.00 |
| 0029 | D-1 contraction joint (503-05240) | LFT | 1,052 | $30.00 | $20.60 | $16.00 |
| 0030 | Jointed reinforced concrete pavement, 12 in. (503-12476) | SYS | 780 | $175.00 | $205.00 | $180.00 |
| 0031 | Terminal joint, type PCCP (503-12478) | LFT | 176 | $305.00 | $310.00 | $240.00 |
| 0032 | Expansion joint with load transfer (503-12479) | LFT | 176 | $38.00 | $50.00 | $20.00 |
| 0033 | Barrier delineator (602-06729) | EACH | 106 | $23.00 | $23.00 | $23.00 |
| 0034 | Concrete median barrier, modified (602-91266) | LFT | 14 | $325.00 | $425.00 | $550.00 |
| 0035 | Fence, chain link, reset (603-06065) | LFT | 20 | $90.00 | $470.00 | $90.00 |
| 0036 | Fence gate, chain link, 48 in. X 24 FT (603-97283) | EACH | 1 | $2,500.00 | $7,000.00 | $2,500.00 |
| 0037 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 804 | $172.00 | $180.00 | $140.00 |
| 0038 | Clean steel bridge, partial, QP-1, bridge no. 1 (619-11049) | LS | 1 | $17,000 | $17,000 | $17,000 |
| 0039 | Clean steel bridge, partial, QP-1, bridge no. 2 (619-11049) | LS | 1 | $17,000 | $17,000 | $17,000 |
| 0040 | Disposal of cleaning waste, non-hazardous, bridge no. 1 (619-12460) | LS | 1 | $500.00 | $500.00 | $500.00 |
| 0041 | Disposal of cleaning waste, non-hazardous, bridge no. 2 (619-12460) | LS | 1 | $500.00 | $500.00 | $500.00 |
| 0042 | Coat steel bridge, partial, bridge no. 1 (619-51860) | LS | 1 | $5,500.00 | $5,500.00 | $5,500.00 |
| 0043 | Coat steel bridge, partial, bridge no. 2 (619-51860) | LS | 1 | $5,500.00 | $5,500.00 | $5,500.00 |
| 0044 | Clean drains (619-98427) | EACH | 8 | $600.00 | $400.00 | $329.44 |
| 0045 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $825.00 | $500.00 |
| 0046 | Mulched seeding, type U (621-06560) | SYS | 2,383 | $1.34 | $1.34 | $1.34 |
| 0047 | Field office, type C (628-09403) | MOS | 6 | $2,100.00 | $3,150.00 | $2,550.00 |
| 0048 | Computer system equipment (628-11976) | EACH | 4 | $500.00 | $500.00 | $100.00 |
| 0049 | Temporary shoring , bridge no. 1 (702-04325) | LS | 1 | $50,000 | $42,000 | $10,000 |
| 0050 | Temporary shoring , bridge no. 2 (702-04325) | LS | 1 | $50,000 | $42,000 | $10,000 |
| 0051 | Reinforcing bars, epoxy coated (703-06029) | LBS | 70,203 | $2.00 | $2.10 | $1.75 |
| 0052 | Embedded galvanic anode (703-08247) | EACH | 2,667 | $1.00 | $25.00 | $30.00 |
| 0053 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 578 | $45.00 | $55.00 | $40.00 |
| 0054 | Concrete, C, superstructure (704-51002) | CYS | 172.70 | $1,500.00 | $1,250.00 | $1,450.00 |
| 0055 | Railing, concrete type FC (706-09960) | LFT | 199 | $250.00 | $220.00 | $272.77 |
| 0056 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $15,200 | $15,200 | $15,200 |
| 0057 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $10,600 | $10,600 | $10,600 |
| 0058 | Patching concrete structures (710-09158) | SFT | 1,540 | $17.00 | $27.70 | $17.00 |
| 0059 | Drilled hole (711-51864) | EACH | 98 | $35.00 | $262.00 | $112.00 |
| 0060 | Jacking and supporting steel beams , bridge no. 1 (711-95291) | LS | 1 | $100,000 | $5,500.00 | $51,257 |
| 0061 | Jacking and supporting steel beams , bridge no. 2 (711-95291) | LS | 1 | $100,000 | $5,500.00 | $49,057 |
| 0062 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 1,040 | $10.00 | $27.00 | $30.00 |
| 0063 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 29 | $80.00 | $230.00 | $120.00 |
| 0064 | Pipe, type 3, circular, diameter 18 in. (715-05171) | LFT | 26 | $95.00 | $260.00 | $145.00 |
| 0065 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 347 | $10.00 | $18.00 | $15.00 |
| 0066 | Pipe, bridge deck drain system , bridge no. 1 (715-09938) | LS | 1 | $7,000.00 | $48,000 | $15,000 |
| 0067 | Pipe, bridge deck drain system , bridge no. 2 (715-09938) | LS | 1 | $13,000 | $42,000 | $15,000 |
| 0068 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $900.00 | $1,315.00 | $1,000.00 |
| 0069 | Pipe end section, diameter 18 in. (715-46010) | EACH | 2 | $1,000.00 | $1,400.00 | $1,000.00 |
| 0070 | Geotextile for underdrains, type 3 (718-12309) | SYS | 1,067 | $3.00 | $4.70 | $3.50 |
| 0071 | Aggregate for underdrains (718-52610) | CYS | 112 | $50.00 | $108.00 | $250.00 |
| 0072 | Casting, catch basin, adjust to grade (720-12796) | EACH | 1 | $1,500.00 | $380.00 | $1,136.50 |
| 0073 | Hydrodemolition (722-01066) | SYS | 4,886 | $65.00 | $85.00 | $70.00 |
| 0074 | Bridge deck overlay budget (722-12380) | DOL | 107,687 | $1.00 | $1.00 | $1.00 |
| 0075 | Bridge deck, remove concrete surface (722-12464) | SYS | 4,886 | $12.00 | $8.50 | $10.00 |
| 0076 | Longitudinal grooving (722-12732) | SYS | 5,867 | $3.75 | $7.00 | $6.00 |
| 0077 | Bridge deck patching, full depth (722-51401) | SFT | 1,620 | $1.00 | $10.00 | $1.00 |
| 0078 | Bridge deck overlay, latex modified (722-51842) | SYS | 5,081 | $60.00 | $72.00 | $55.00 |
| 0079 | Overlay dam (722-51874) | SFT | 252 | $35.00 | $37.00 | $1.00 |
| 0080 | Bearing assembly, reset (726-11773) | EACH | 1 | $2,500.00 | $10,600 | $2,000.00 |
| 0081 | Bearing assembly, elastomeric (726-92406) | EACH | 32 | $3,500.00 | $3,650.00 | $2,532.55 |
| 0082 | Construction sign, type C (801-03290) | EACH | 5 | $240.00 | $240.00 | $240.00 |
| 0083 | Road closure sign assembly (801-04308) | EACH | 1 | $253.00 | $253.00 | $253.00 |
| 0084 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 16,160 | $1.73 | $1.73 | $1.73 |
| 0085 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 120 | $10.87 | $10.87 | $10.87 |
| 0086 | Detour route marker assembly (801-06625) | EACH | 35 | $152.00 | $152.00 | $152.00 |
| 0087 | Construction sign, type A (801-06640) | EACH | 56 | $208.00 | $208.00 | $208.00 |
| 0088 | Construction sign, type B (801-06645) | EACH | 9 | $104.00 | $104.00 | $104.00 |
| 0089 | Flashing arrow sign (801-06710) | DAY | 12 | $16.00 | $16.00 | $16.00 |
| 0090 | Maintaining traffic (801-06775) | LS | 1 | $226,736 | $34,500 | $50,000 |
| 0091 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 6 | $5,768.00 | $6,500.00 | $5,768.00 |
| 0092 | Barricade, type III-A (801-07118) | LFT | 48 | $15.43 | $15.43 | $15.43 |
| 0093 | Barricade, type III-B (801-07119) | LFT | 16 | $15.43 | $15.43 | $15.43 |
| 0094 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,830 | $15.00 | $33.00 | $25.00 |
| 0095 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 2,140 | $38.00 | $38.00 | $25.00 |
| 0096 | Portable changeable message sign (801-11642) | EACH | 6 | $2,792.00 | $2,792.00 | $2,792.00 |
| 0097 | Temporary pavement marking, removable, 10 in. (801-12956) | LFT | 1,390 | $8.10 | $8.10 | $8.10 |
| 0098 | Line, remove (808-06716) | LFT | 6,500 | $0.61 | $0.61 | $0.61 |
| 0099 | Line, multi-component, solid, white, 24 in. (808-10043) | LFT | 215 | $12.98 | $12.98 | $12.98 |
| 0100 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 3,980 | $0.71 | $0.71 | $0.71 |
| 0101 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 3,110 | $0.71 | $0.71 | $0.71 |
| 0102 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 910 | $0.93 | $0.93 | $0.93 |
| 0103 | Grooving for pavement markings (808-12032) | LFT | 8,300 | $0.81 | $0.81 | $0.81 |
| 0104 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 1,805 | $1.67 | $1.67 | $1.67 |
| 0105 | Line, multi-component, dotted, white, 10 in. (808-12851) | LFT | 170 | $2.07 | $2.07 | $2.07 |
| 0106 | Line, multi-component, broken, black, 6 in. (808-12949) | LFT | 910 | $4.06 | $4.06 | $4.06 |
| 0107 | Line, multi-component, dotted, black, 10 in. (808-12952) | LFT | 170 | $5.05 | $5.05 | $5.05 |
| 0108 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 27 | $21.75 | $21.75 | $50.00 |
| 0109 | Snowplowable raised pavement marker (808-75998) | EACH | 85 | $42.08 | $42.08 | $42.08 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.