William Charles Construction Company: INDOT bid record

William Charles Construction Company submitted 69 bids on Indiana DOT contracts in the data, from 18 JAN 2024 to 05 NOV 2026, and was the low bidder on 9 of them (13%). When it was not low, its total sat a median +15% above the low bid.

Owner
Indiana DOT
Low bid volume
$371,206,818
Latest bid
05 NOV 2026
Data through
05 NOV 2026
69Bids
9Low bids
13Win rate, percent
+15%Median gap to the low bid when not low, 60 bids

By year

YearBidsLow bidsWin rate
20241915%
202532722%
20261816%
William Charles Construction Company, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Crawfordsville33515%
Greenfield29310%
Seymour6117%
Fort Wayne100%
William Charles Construction Company, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL6767 (100%)$1.00$1.00
Contract liens109-08360DOL6767 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL6666 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL6464 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL6262 (100%)$1.00$1.00
Stormwater management budget205-12108DOL6161 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL5656 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL5555 (100%)$1.00$1.00
Construction sign, type A801-06640EACH6537 (57%)$195.00$200.00
Mobilization and demobilization for seeding621-01004EACH5229 (56%)$550.00$525.00
Project estimate adjustment109-08463DOL2525 (100%)$1.00$1.00
Barricade, type III-B801-07119LFT4423 (52%)$16.00$16.00
William Charles Construction Company, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

William Charles Construction Company, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026R-42227-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY2 of 7$3,777,000+4.0%
07 OCT 2026R-44721-ASeymourINTERSECTION MODERNIZATIONS AND MULTI-USE PATH4 of 4$5,665,000+29%
08 JUL 2026R-44376-ACrawfordsvilleSMALL STRUCTURE PIPE LINING AND REPLACEMENT2 of 6$1,536,850+8.0%
08 APR 2026R-43683-ACrawfordsvilleSMALL STRUCTURE REPLACEMENT4 of 10$837,681+13%
08 APR 2026R-45478-ACrawfordsvilleACCESS CONTROL4 of 4$583,875+36%
11 MAR 2026R-43686-ACrawfordsvilleHMA OVERLAY, BRIDGE REHABILITATION AND SMALL STRUCTURES3 of 3$33,991,380+27%
11 MAR 2026R-43940-AGreenfieldPAVEMENT REPLACEMENT, SMALL STRUCTURE AND DRAINS1 of 4$5,644,918Low, 0.0% under the second
11 MAR 2026R-44024-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT5 of 6$5,999,251+9.0%
11 MAR 2026R-44130-AGreenfieldAUXILIARY LANE CONSTRUCTION8 of 11$1,019,802+34%
11 MAR 2026B-43949-AGreenfieldBRIDGE REPLACEMENT3 of 6$1,779,834+12%
11 FEB 2026R-41916-ACrawfordsvilleROAD RECONSTRUCTION AND BRIDGE REPLACEMENT2 of 3$17,670,000+31%
11 FEB 2026R-43599-ACrawfordsvilleINTERSECTION IMPROVEMENT, ROUNDABOUT5 of 7$2,060,995+10%
11 FEB 2026R-43831-ACrawfordsvilleSMALL STRUCTURE MAINTENANCE AND REPAIR5 of 6$224,960+63%
11 FEB 2026B-44941-ACrawfordsvilleSCOUR PROTECTION2 of 6$510,568+8.0%
14 JAN 2026R-42755-AGreenfieldNEW ROAD CONSTRUCTION10 of 10$4,233,404+26%
14 JAN 2026R-45209-AGreenfieldROAD RECONSTRUCTION4 of 4$5,820,000+10%
14 JAN 2026B-42792-AGreenfieldBRIDGE DECK REPLACEMENT4 of 7$2,500,662+19%
14 JAN 2026B-43516-AGreenfieldSMALL STRUCTURE REPLACEMENT9 of 12$864,000+30%
10 DEC 2025R-43621-AGreenfieldADDED TRAVEL LANES3 of 8$7,133,885+8.0%
10 DEC 2025B-42319-AGreenfieldREPLACE SUPERSTRUCTURE3 of 9$3,540,000+15%
10 DEC 2025B-43883-AGreenfieldSCOUR PROTECTION2 of 5$815,000+6.0%
10 DEC 2025B-44276-AGreenfieldBRIDGE REPLACEMENT8 of 10$1,900,000+27%
10 DEC 2025B-44788-ACrawfordsvilleBRIDGE REPLACEMENT3 of 4$6,870,000+29%
10 DEC 2025T-44353-ACrawfordsvilleAUXILIARY LANES, ACCEL AND DECEL OR TURN LANES3 of 5$2,630,472+6.0%
19 NOV 2025R-42570-ASeymourADDED TRAVEL LANES, BRIDGE REPLACEMENT AND OVERLAY1 of 3$318,999,445Low, 22% under the second
William Charles Construction Company: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy