INDOT contract B-44788-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on December 10, 2025, Vigo, Crawfordsville. 4 bids received; low bid $5,329,338 by Milestone Contractors South LLC.
- Owner
- Indiana DOT
- Letting
- 10 DEC 2025
- Pay items
- 89
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors South LLC | $5,329,338 | Low |
| 2 | Beaty Construction Inc | $6,289,210 | +18% |
| 3 | William Charles Construction Company | $6,870,000 | +29% |
| 4 | Rieth-Riley Construction Co., Inc. | $7,635,625 | +43% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors South LLC | 2. Beaty Construction Inc | 3. William Charles Construction Company | 4. Rieth-Riley Construction Co., Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $16,000 | $50,000 | $100,000 | $17,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $264,142 | $300,000 | $345,000 | $665,440 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $61,045 | $60,000 | $100,000 | $289,164 |
| 0012 | Pavement removal (202-02240) | SYS | 836 | $16.80 | $35.00 | $20.00 | $34.00 |
| 0013 | Cable barrier, remove (202-12024) | LFT | 1,592 | $2.50 | $2.50 | $2.50 | $8.20 |
| 0014 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $153,500 | $220,000 | $100,000 | $136,560 |
| 0015 | Present structure, remove, structure no. 2 (202-51330) | LS | 1 | $153,500 | $220,000 | $100,000 | $136,560 |
| 0016 | Inlet, remove (202-91385) | EACH | 8 | $800.00 | $1,000.00 | $750.00 | $610.00 |
| 0017 | Manhole, remove (202-93047) | EACH | 2 | $800.00 | $1,200.00 | $1,500.00 | $965.00 |
| 0018 | Guardrail end treatment, remove (202-93741) | EACH | 5 | $450.00 | $450.00 | $450.00 | $450.00 |
| 0019 | Pipe, remove (202-96133) | LFT | 1,841 | $16.00 | $13.00 | $8.00 | $29.65 |
| 0020 | Excavation, common (203-02000) | CYS | 10,514 | $30.00 | $40.00 | $55.00 | $39.25 |
| 0021 | Borrow (203-02070) | CYS | 25,565 | $38.50 | $35.00 | $64.00 | $63.26 |
| 0022 | Stormwater management budget (205-12108) | DOL | 83,716 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0023 | Stormwater management implementation (205-12616) | LS | 1 | $8,000.00 | $14,000 | $35,000 | $35,929 |
| 0024 | SWQCP preparation (205-12618) | LS | 1 | $4,500.00 | $2,100.00 | $5,000.00 | $3,200.00 |
| 0025 | Subgrade treatment, type IC (207-09935) | SYS | 9,946 | $27.00 | $30.00 | $30.00 | $38.20 |
| 0026 | Structure backfill, type 2 (211-09265) | CYS | 1,719 | $69.00 | $120.00 | $85.00 | $68.50 |
| 0027 | Geogrid, type IB (214-11796) | SYS | 6,673 | $2.25 | $2.50 | $2.25 | $3.36 |
| 0028 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,273 | $3.60 | $4.00 | $3.50 | $3.37 |
| 0029 | Compacted aggregate, no. 8 (301-12233) | CYS | 93 | $95.00 | $225.00 | $85.00 | $145.75 |
| 0030 | Compacted aggregate, no. 53 (301-12234) | CYS | 438 | $80.00 | $100.00 | $68.00 | $106.10 |
| 0031 | Compacted aggregate, no. 53 (303-01180) | TON | 4,109 | $30.00 | $38.00 | $40.00 | $39.50 |
| 0032 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 867 | $16.00 | $16.00 | $14.00 | $11.38 |
| 0033 | QC/QA-HMA, 4, 58E, surface, 9.5 MM (401-000009) | TON | 319 | $148.50 | $148.50 | $148.50 | $167.20 |
| 0034 | QC/QA-HMA, 4, 58E, intermediate, 19.0 MM (401-000045) | TON | 417 | $117.00 | $117.00 | $117.00 | $136.60 |
| 0035 | QC/QA-HMA, 4, 58S, base, 25.0 MM (401-000048) | TON | 1,893 | $93.65 | $93.65 | $93.65 | $125.00 |
| 0036 | QC/QA-HMA, 4, 58E, intermediate, OG, 19.0 MM (401-000067) | TON | 480 | $105.00 | $105.00 | $105.00 | $131.50 |
| 0037 | Joint adhesive (401-11526) | LFT | 2,055 | $1.15 | $1.15 | $1.15 | $0.87 |
| 0038 | Inertial profiler, HMA (401-12169) | LS | 1 | $8,500.00 | $8,500.00 | $8,500.00 | $0.01 |
| 0039 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 2,055 | $16.00 | $16.00 | $16.00 | $13.60 |
| 0040 | HMA for temporary pavement, type D (402-10087) | TON | 3,671 | $85.00 | $85.00 | $85.00 | $124.65 |
| 0041 | Asphalt for tack coat (406-05520) | TON | 12 | $600.00 | $600.00 | $600.00 | $0.01 |
| 0042 | Guardrail, remove (601-02241) | LFT | 1,826 | $3.50 | $3.50 | $3.50 | $3.50 |
| 0043 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 1,050 | $25.00 | $25.00 | $25.00 | $25.00 |
| 0044 | Guardrail height transition, MGS (601-12289) | EACH | 4 | $850.00 | $850.00 | $850.00 | $850.00 |
| 0045 | Guardrail transition, MGS without curb (601-12292) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0046 | Guardrail end treatment, type MS (601-94690) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0047 | Milled HMA corrugations, conventional (606-12399) | LFT | 1,770 | $3.65 | $8.09 | $3.65 | $4.80 |
| 0048 | Geotextile for riprap, type 2A (616-12248) | SYS | 554 | $3.87 | $4.00 | $4.50 | $5.92 |
| 0049 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $800.00 | $800.00 | $500.00 | $1,000.00 |
| 0050 | Fertilizer for permanent seeding (621-06545) | TON | 3 | $1,659.00 | $1,659.00 | $1,100.00 | $800.00 |
| 0051 | Seed mixture, type U (621-06554) | LBS | 1,567 | $3.59 | $3.59 | $6.41 | $10.25 |
| 0052 | Mulching material (621-06565) | TON | 27 | $597.00 | $597.00 | $560.00 | $650.00 |
| 0053 | Cable barrier system, type TL-4 (627-09327) | LFT | 5,285 | $20.50 | $20.50 | $20.50 | $20.50 |
| 0054 | Computer system equipment (628-11976) | EACH | 1 | $1,400.00 | $2,500.00 | $1,200.00 | $1,000.00 |
| 0055 | Field office, type D (628-12683) | MOS | 12 | $4,000.00 | $4,500.00 | $3,800.00 | $4,355.00 |
| 0056 | Temporary shoring (702-04325) | LS | 1 | $145,000 | $280,000 | $118,000 | $400,000 |
| 0057 | Waterproofing membrane, type 2 (714-000086) | SFT | 13,992 | $1.70 | $4.00 | $3.00 | $3.61 |
| 0058 | Structure, reinforced concrete, box sections, 14 FT X 12 FT (714-11136) | LFT | 318 | $2,329.50 | $2,300.00 | $2,700.00 | $2,645.00 |
| 0059 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 1,370 | $7.46 | $23.00 | $18.00 | $18.70 |
| 0060 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 320 | $12.00 | $40.00 | $28.00 | $32.50 |
| 0061 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 416 | $28.00 | $70.00 | $34.50 | $51.30 |
| 0062 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 559 | $31.00 | $100.00 | $39.00 | $56.90 |
| 0063 | Video inspection for pipe (715-09064) | LFT | 67 | $50.00 | $4.00 | $48.55 | $30.00 |
| 0064 | Outlet protector, type 1 (718-06528) | EACH | 4 | $1,900.00 | $800.00 | $2,000.00 | $1,362.00 |
| 0065 | Video inspection for underdrain (718-06532) | LFT | 1,370 | $2.60 | $3.00 | $2.40 | $2.00 |
| 0066 | Geotextile for underdrains, type 2B (718-12308) | SYS | 1,880 | $3.00 | $3.00 | $3.00 | $4.86 |
| 0067 | Aggregate for underdrains (718-52610) | CYS | 124 | $70.00 | $54.00 | $85.00 | $105.70 |
| 0068 | Inlet, type A2 (720-45005) | EACH | 4 | $3,500.00 | $2,500.00 | $2,750.00 | $3,480.00 |
| 0069 | Inlet, type P12A (720-45070) | EACH | 5 | $4,600.00 | $3,000.00 | $3,700.00 | $7,660.00 |
| 0070 | Manhole, type C4 (720-45410) | EACH | 3 | $4,000.00 | $5,000.00 | $3,400.00 | $5,155.00 |
| 0071 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 908 | $1.96 | $2.18 | $1.60 | $3.15 |
| 0072 | Temporary pavement marking, removable, 8 in. (801-06469) | LFT | 9,750 | $2.61 | $3.29 | $2.05 | $4.50 |
| 0073 | Construction sign, type A (801-06640) | EACH | 50 | $246.00 | $223.00 | $195.00 | $195.00 |
| 0074 | Temporary raised pavement marker, grade 1 (801-06649) | EACH | 990 | $26.00 | $19.20 | $20.00 | $9.95 |
| 0075 | Maintaining traffic (801-06775) | LS | 1 | $186,105 | $450,000 | $500,014 | $208,375 |
| 0076 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $9,000.00 | $9,000.00 | $9,000.00 | $12,042 |
| 0077 | Temporary traffic barrier, type 2 (801-08401) | LFT | 3,890 | $62.00 | $60.00 | $45.00 | $56.60 |
| 0078 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 814 | $62.00 | $90.00 | $90.00 | $64.00 |
| 0079 | Portable changeable message sign (801-11642) | EACH | 4 | $2,625.00 | $5,241.00 | $4,813.00 | $7,500.00 |
| 0080 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 8 | $340.00 | $1,471.00 | $1,313.00 | $2,500.00 |
| 0083 | Line, remove (808-06716) | LFT | 5,989 | $0.66 | $0.54 | $2.50 | $0.75 |
| 0084 | Grooving for pavement markings (808-12032) | LFT | 7,979 | $1.06 | $0.68 | $0.60 | $0.49 |
| 0085 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 3,546 | $5.31 | $6.59 | $5.25 | $6.95 |
| 0086 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 887 | $6.61 | $7.14 | $6.25 | $7.45 |
| 0087 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 3,546 | $5.31 | $6.59 | $5.25 | $6.95 |
| 0088 | Safety terminal, type TL-3 (627-09330) | EACH | 6 | $6,550.00 | $6,550.00 | $6,550.00 | $6,550.00 |
| 0089 | Flashing arrow sign (801-06710) | DAY | 28 | $15.00 | $16.00 | $15.00 | $30.00 |
| 0090 | Junction box , 6 in. X 6 in. X 4 in. (807-05073) | EACH | 1 | $500.00 | $5,000.00 | $8,500.00 | $450.00 |
| 0091 | Conduit, steel, galvanized, 0.75 in. (805-86898) | LFT | 450 | $12.00 | $20.00 | $30.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of December 10, 2025. Compiled by Mirage Metrics.