Milestone Contractors South LLC: INDOT bid record

Milestone Contractors South LLC submitted 31 bids on Indiana DOT contracts in the data, from 09 FEB 2022 to 08 JUL 2026, and was the low bidder on 12 of them (39%). When it was not low, its total sat a median +12% above the low bid.

Owner
Indiana DOT
Low bid volume
$102,880,954
Latest bid
08 JUL 2026
Data through
05 NOV 2026
31Bids
12Low bids
39Win rate, percent
+12%Median gap to the low bid when not low, 19 bids

By year

YearBidsLow bidsWin rate
20228338%
20236117%
20244250%
202544100%
20269222%
Milestone Contractors South LLC, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Crawfordsville291241%
Vincennes200%
Milestone Contractors South LLC, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL2626 (100%)$1.00$1.00
Contract liens109-08360DOL2626 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL2626 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL2525 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL2222 (100%)$1.00$1.00
Stormwater management budget205-12108DOL1818 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL1818 (100%)$1.00$1.00
Project estimate adjustment109-08463DOL1616 (100%)$1.00$1.00
Quality adjustments, pavement traffic markings109-09377DOL1616 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL1515 (100%)$1.00$1.00
Construction sign, type A801-06640EACH1610 (63%)$200.00$200.00
Payment adjustment PG asphalt binder109-09489DOL1010 (100%)$1.00$1.00
Milestone Contractors South LLC, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Milestone Contractors South LLC, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
08 JUL 2026R-45965-ACrawfordsvillePAVEMENT PATCHING2 of 2$2,980,280+14%
07 MAY 2026R-46453-ACrawfordsvilleSMALL STRUCTURES AND DRAINS CONSTRUCTION3 of 3$2,892,231+49%
08 APR 2026R-42521-ACrawfordsvilleROAD REHABILITATION AND BRIDGE REHABILITATION2 of 4$6,096,612+10%
08 APR 2026R-44401-ACrawfordsvilleHMA OVERLAY, BRIDGE REMOVAL AND REPLACEMENT1 of 2$23,263,700Low, 5.0% under the second
08 APR 2026R-45478-ACrawfordsvilleACCESS CONTROL2 of 4$435,768+2.0%
11 MAR 2026R-43685-ACrawfordsvilleHMA OVERLAY, BRIDGE MAINTENANCE AND REPAIR2 of 3$19,842,770+6.0%
11 MAR 2026R-43686-ACrawfordsvilleHMA OVERLAY, BRIDGE REHABILITATION AND SMALL STRUCTURES1 of 3$26,716,063Low, 5.0% under the second
11 FEB 2026R-43693-ACrawfordsvilleHMA OVERLAY, PREVENTIVE MAINTENANCE3 of 3$13,377,777+10%
11 FEB 2026R-45553-AVincennesINSTITUTION AND PARK ROAD MAINTENANCE3 of 3$635,700+25%
10 DEC 2025B-44788-ACrawfordsvilleBRIDGE REPLACEMENT1 of 4$5,329,338Low, 18% under the second
08 OCT 2025R-43694-ACrawfordsvilleHMA OVERLAY AND SMALL STRUCTURE REPLACEMENT1 of 5$3,636,703Low, 1.0% under the second
09 APR 2025R-41613-ACrawfordsvillePAVEMENT REPLACEMENT AND TRAFFIC SIGNALS MODERNIZATION1 of 1$7,118,100Low
12 MAR 2025R-42999-ACrawfordsvilleASPHALT RESURFACE1 of 2$8,728,498Low, 27% under the second
13 MAR 2024R-44709-ACrawfordsvilleASPHALT RESURFACE1 of 1$7,915,500Low
15 FEB 2024R-44889-ACrawfordsvillePAVEMENT PATCHING2 of 2$1,393,458+31%
18 JAN 2024R-44762-BCrawfordsvilleSURFACE TREATMENT, MICROSURFACE1 of 1$1,840,890Low
18 JAN 2024R-44905-BCrawfordsvillePAVEMENT PATCHING3 of 3$7,010,500+91%
15 NOV 2023R-42956-ACrawfordsvilleASPHALT RESURFACE1 of 2$4,538,942Low, 14% under the second
15 NOV 2023R-44825-ACrawfordsvilleSURFACE TREATMENT, MICROSURFACE2 of 2$1,560,250+10%
19 APR 2023R-44711-ACrawfordsvillePAVEMENT PATCHING2 of 3$1,793,000+1.0%
15 MAR 2023R-41612-ACrawfordsvilleASPHALT RESURFACE2 of 3$4,353,670+5.0%
19 JAN 2023R-41611-ACrawfordsvilleASPHALT RESURFACE2 of 2$8,675,309+21%
19 JAN 2023R-44225-ACrawfordsvilleINSTITUTION AND PARK ROAD MAINTENANCE2 of 2$897,458+29%
07 DEC 2022R-42930-ACrawfordsvilleASPHALT RESURFACE1 of 1$9,778,458Low
16 NOV 2022R-42934-ACrawfordsvilleASPHALT RESURFACE1 of 3$2,756,000Low, 19% under the second
Milestone Contractors South LLC: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.