Calumet Civil Contractors Inc: INDOT bid record
Calumet Civil Contractors Inc submitted 104 bids on Indiana DOT contracts in the data, from 09 MAR 2022 to 05 NOV 2026, and was the low bidder on 36 of them (35%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $64,320,867
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 13 | 4 | 31% |
| 2023 | 14 | 6 | 43% |
| 2024 | 26 | 12 | 46% |
| 2025 | 27 | 11 | 41% |
| 2026 | 24 | 3 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Greenfield | 66 | 21 | 32% |
| Crawfordsville | 28 | 10 | 36% |
| Seymour | 7 | 4 | 57% |
| Fort Wayne | 2 | 1 | 50% |
| Crawfordsville, Greenfield | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 103 | 103 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 103 | 103 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 103 | 103 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 92 | 92 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 90 | 90 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 89 | 89 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 88 | 88 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 78 | 78 (100%) | $1.00 | $1.00 |
| Construction sign, type B | 801-06645 | EACH | 61 | 42 (69%) | $81.00 | $105.00 |
| Barricade, type III-A | 801-07118 | LFT | 58 | 39 (67%) | $16.00 | $16.00 |
| Construction sign, type A | 801-06640 | EACH | 75 | 38 (51%) | $208.00 | $200.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 61 | 35 (57%) | $500.00 | $525.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rieth-Riley Construction Co., Inc. | 66 | 26 of 66 |
| E & B Paving LLC | 64 | 31 of 64 |
| Milestone Contractors LP | 52 | 19 of 52 |
| Morphey Construction Inc. | 50 | 10 of 50 |
| Olco Inc | 17 | 10 of 17 |
| William Charles Construction Company | 16 | 6 of 16 |
| Midwest Paving LLC | 13 | 11 of 13 |
| His Constructors Inc | 13 | 4 of 13 |
| 3D Company Inc | 11 | 4 of 11 |
| Yarberry Companies Inc | 10 | 1 of 10 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-39073-A | Greenfield | BIKE AND PEDESTRIAN FACILITIES | 5 of 7 | $2,428,000 | +19% |
| 05 NOV 2026 | R-42227-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY | 7 of 7 | $4,600,000 | +27% |
| 07 OCT 2026 | R-44279-A | Seymour | INTERSECTION IMPROVMENT WITH TRAFFIC SIGNAL MODERNIZATION | 2 of 4 | $1,328,000 | +20% |
| 07 OCT 2026 | R-46652-A | Greenfield | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 3 | $256,000 | +12% |
| 05 AUG 2026 | R-43626-A | Fort Wayne | ADA SIDEWALK RAMP CONSTRUCTION | 2 of 6 | $2,672,000 | +15% |
| 08 JUL 2026 | R-44802-A | Greenfield | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 3 | $262,000 | +2.0% |
| 08 APR 2026 | R-42521-A | Crawfordsville | ROAD REHABILITATION AND BRIDGE REHABILITATION | 3 of 4 | $6,234,000 | +12% |
| 08 APR 2026 | R-43094-A | Greenfield | HMA OVERLAY, PREVENTIVE MAINTENANCE, ADA SIDEWALK RAMP CONST | 3 of 4 | $2,413,000 | +16% |
| 08 APR 2026 | R-43683-A | Crawfordsville | SMALL STRUCTURE REPLACEMENT | 5 of 10 | $865,000 | +17% |
| 08 APR 2026 | R-44039-A | Crawfordsville | ADA SIDEWALK RAMP CONSTRUCTION | 3 of 5 | $792,000 | +38% |
| 08 APR 2026 | R-45478-A | Crawfordsville | ACCESS CONTROL | 1 of 4 | $428,000 | Low, 2.0% under the second |
| 11 MAR 2026 | R-43940-A | Greenfield | PAVEMENT REPLACEMENT, SMALL STRUCTURE AND DRAINS | 3 of 4 | $6,630,000 | +17% |
| 11 MAR 2026 | R-44024-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 6 of 6 | $6,823,000 | +24% |
| 11 MAR 2026 | R-44130-A | Greenfield | AUXILIARY LANE CONSTRUCTION | 6 of 11 | $879,000 | +15% |
| 11 MAR 2026 | R-45629-A | Greenfield | ADA SIDEWALK RAMP CONSTRUCTION | 3 of 5 | $331,000 | +62% |
| 11 FEB 2026 | R-43476-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 6 of 7 | $2,289,000 | +16% |
| 11 FEB 2026 | R-43599-A | Crawfordsville | INTERSECTION IMPROVEMENT, ROUNDABOUT | 2 of 7 | $1,982,000 | +6.0% |
| 11 FEB 2026 | R-44897-A | Seymour | SMALL STRUCTURES AND ADA SIDEWALK RAMP CONSTRUCTION | 4 of 4 | $3,180,000 | +20% |
| 11 FEB 2026 | R-45636-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 3 of 5 | $288,000 | +26% |
| 14 JAN 2026 | R-42755-A | Greenfield | NEW ROAD CONSTRUCTION | 1 of 10 | $3,368,000 | Low, 0.0% under the second |
| 14 JAN 2026 | R-43697-A | Crawfordsville | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 4 | $790,000 | +1.0% |
| 14 JAN 2026 | R-43956-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 6 | $178,000 | Low, 11% under the second |
| 14 JAN 2026 | R-45468-A | Greenfield | INSTITUTION AND PARK ROAD MAINTENANCE | 4 of 4 | $773,000 | +39% |
| 14 JAN 2026 | B-43516-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 6 of 12 | $768,000 | +15% |
| 10 DEC 2025 | R-43621-A | Greenfield | ADDED TRAVEL LANES | 6 of 8 | $7,467,000 | +13% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.