Midwest Paving LLC: INDOT bid record

Midwest Paving LLC submitted 21 bids on Indiana DOT contracts in the data, from 13 DEC 2023 to 05 NOV 2026, and was the low bidder on 9 of them (43%). When it was not low, its total sat a median +17% above the low bid.

Owner
Indiana DOT
Low bid volume
$12,733,995
Latest bid
05 NOV 2026
Data through
05 NOV 2026
21Bids
9Low bids
43Win rate, percent
+17%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
202322100%
202411100%
20258563%
202610110%
Midwest Paving LLC, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Greenfield18844%
Crawfordsville3133%
Midwest Paving LLC, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL2121 (100%)$1.00$1.00
Contract liens109-08360DOL2121 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL2121 (100%)$1.00$1.00
Stormwater management budget205-12108DOL2121 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL2121 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL2020 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL1919 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL1515 (100%)$1.00$1.00
Construction sign, type A801-06640EACH2112 (57%)$182.00$200.00
Road closure sign assembly801-04308EACH169 (56%)$230.50$280.00
Grooving for pavement markings808-12032LFT129 (75%)$0.88$0.80
Detour route marker assembly801-06625EACH148 (57%)$135.50$140.00
Midwest Paving LLC, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Midwest Paving LLC, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026R-42227-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT, BIKE AND PED FACILITY5 of 7$3,982,820+10%
05 NOV 2026B-44588-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION4 of 5$178,870+33%
07 OCT 2026R-44607-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION3 of 4$562,199+20%
05 AUG 2026B-45351-AGreenfieldSMALL STRUCTURE REPLACEMENT5 of 8$692,870+26%
08 JUL 2026B-45347-AGreenfieldSCOUR PROTECTION6 of 6$491,570+43%
08 APR 2026R-43094-AGreenfieldHMA OVERLAY, PREVENTIVE MAINTENANCE, ADA SIDEWALK RAMP CONST4 of 4$2,428,070+16%
08 APR 2026R-44039-ACrawfordsvilleADA SIDEWALK RAMP CONSTRUCTION2 of 5$670,567+17%
11 MAR 2026R-44024-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT3 of 6$5,665,670+3.0%
11 FEB 2026R-43476-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT3 of 7$2,074,470+5.0%
14 JAN 2026R-43908-AGreenfieldHMA OVERLAY, PREVENTIVE MAINTENANCE1 of 2$792,970Low, 6.0% under the second
08 OCT 2025R-43694-ACrawfordsvilleHMA OVERLAY AND SMALL STRUCTURE REPLACEMENT3 of 5$3,719,670+2.0%
08 OCT 2025B-43958-AGreenfieldSMALL STRUCTURE REPLACEMENT1 of 9$359,570Low, 2.0% under the second
10 SEP 2025B-42265-AGreenfieldSMALL STRUCTURE REPLACEMENT2 of 11$268,970+3.0%
09 JUL 2025R-42268-AGreenfieldSMALL STRUCTURE REPLACEMENT9 of 9$441,670+42%
09 JUL 2025R-44250-ACrawfordsvilleNEW ROAD CONSTRUCTION1 of 9$3,999,970Low, 3.0% under the second
12 MAR 2025R-43507-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT1 of 8$1,687,170Low, 7.0% under the second
12 FEB 2025R-41054-AGreenfieldINTERSECTION IMPROVEMENT, ROUNDABOUT1 of 8$1,983,670Low, 2.0% under the second
12 FEB 2025R-42230-AGreenfieldASPHALT RESURFACE AND ADA SIDEWALK RAMP CONSTRUCTION1 of 3$890,470Low, 18% under the second
18 JAN 2024R-44644-AGreenfieldINTERSECTION IMPROVEMENT1 of 4$261,162Low, 2.0% under the second
13 DEC 2023R-44189-AGreenfieldBIKE AND PEDESTRIAN FACILITIES1 of 8$1,318,488Low, 14% under the second
13 DEC 2023R-44197-AGreenfieldINTERSECTION IMPROVEMENT1 of 5$1,440,527Low, 9.0% under the second
Midwest Paving LLC: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy