INDOT contract R-44607-A bid tabulation
SMALL STRUCTURES AND DRAINS CONSTRUCTION. Let by Indiana DOT on October 7, 2026, Tipton, Greenfield. 4 bids received; low bid $468,538 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 07 OCT 2026
- Pay items
- 50
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $468,538 | Low |
| 2 | Yarberry Companies Inc | $494,237 | +5.0% |
| 3 | Midwest Paving LLC | $562,199 | +20% |
| 4 | Morphey Construction Inc. | $685,000 | +46% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. Yarberry Companies Inc | 3. Midwest Paving LLC | 4. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,800.00 | $20.00 | $25,000 | $20,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $678.67 | $1,000.00 | $3,000.00 | $3,000.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $31,120 | $24,000 | $63,088 | $34,250 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $11,872 | $20,000 | $16,800 | $15,000 |
| 0012 | Headwall, remove (202-02271) | EACH | 16 | $1,146.15 | $500.00 | $555.00 | $1,000.00 |
| 0013 | Pipe, remove (202-96133) | LFT | 241 | $106.10 | $60.00 | $33.00 | $100.00 |
| 0014 | Excavation, common (203-02000) | CYS | 65 | $371.64 | $250.00 | $355.00 | $100.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $3,197.93 | $5,000.00 | $7,500.00 | $5,000.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 355 | $66.23 | $65.00 | $80.00 | $100.00 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 126 | $95.64 | $120.00 | $68.00 | $100.00 |
| 0019 | Geogrid, type IB (214-11796) | SYS | 35 | $27.56 | $20.00 | $14.00 | $20.00 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 430 | $5.25 | $15.00 | $3.00 | $10.00 |
| 0021 | Compacted aggregate, no. 8 (301-12233) | CYS | 52 | $135.83 | $130.00 | $90.00 | $170.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 117 | $88.10 | $55.00 | $190.00 | $270.00 |
| 0023 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,548 | $12.06 | $15.00 | $16.00 | $16.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 156 | $188.97 | $200.00 | $244.00 | $244.00 |
| 0025 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 45 | $317.30 | $150.00 | $324.00 | $580.00 |
| 0026 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 149 | $166.73 | $125.00 | $161.00 | $250.00 |
| 0027 | Joint adhesive (401-11526) | LFT | 700 | $0.97 | $5.00 | $0.50 | $0.50 |
| 0028 | Asphalt for tack coat (406-05520) | TON | 1 | $0.01 | $1,500.00 | $1.00 | $1.00 |
| 0029 | Riprap, class 1 (616-05688) | TON | 32 | $171.04 | $400.00 | $248.00 | $100.00 |
| 0030 | Riprap, revetment (616-06405) | TON | 23 | $823.27 | $300.00 | $384.00 | $200.00 |
| 0031 | Geotextile for riprap, type 1A (616-12246) | SYS | 62 | $8.95 | $20.00 | $9.00 | $40.00 |
| 0032 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $425.00 | $700.00 | $425.00 | $500.00 |
| 0033 | Mulched seeding, type R (621-06559) | SYS | 3,177 | $2.48 | $3.00 | $2.48 | $10.00 |
| 0034 | Field office, type C (628-09403) | MOS | 6 | $3,845.80 | $5,500.00 | $2,500.00 | $2,250.00 |
| 0035 | Pipe connection collar and pad (715-04482) | EACH | 18 | $1,139.16 | $1,300.00 | $1,100.00 | $1,000.00 |
| 0036 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 78 | $78.64 | $40.00 | $10.00 | $20.00 |
| 0037 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 183 | $154.18 | $150.00 | $150.00 | $300.00 |
| 0038 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 8 | $353.19 | $300.00 | $238.00 | $325.00 |
| 0039 | Pipe, type 4, circular, diameter 18 in. (715-05209) | LFT | 50 | $147.00 | $50.00 | $122.00 | $285.00 |
| 0040 | Pipe, type 1, deformed, min. area 11.6 SFT (715-05244) | LFT | 39 | $509.33 | $500.00 | $335.00 | $600.00 |
| 0041 | Pipe end section, diameter 15 in. (715-46005) | EACH | 18 | $1,344.08 | $2,400.00 | $2,032.00 | $2,300.00 |
| 0042 | Road closure sign assembly (801-04308) | EACH | 4 | $300.00 | $150.00 | $234.00 | $234.00 |
| 0043 | Detour route marker assembly (801-06625) | EACH | 44 | $130.00 | $85.00 | $136.00 | $136.00 |
| 0044 | Construction sign, type A (801-06640) | EACH | 20 | $200.00 | $200.00 | $196.00 | $196.00 |
| 0045 | Maintaining traffic (801-06775) | LS | 1 | $10,384 | $45,000 | $67,925 | $101,260 |
| 0046 | Barricade, type III-A (801-07118) | LFT | 48 | $18.00 | $9.00 | $15.12 | $20.00 |
| 0047 | Barricade, type III-B (801-07119) | LFT | 128 | $18.00 | $9.00 | $15.12 | $20.00 |
| 0048 | Grooving for pavement markings (808-12032) | LFT | 2,400 | $0.60 | $3.00 | $0.54 | $1.00 |
| 0049 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 1,200 | $1.00 | $3.00 | $0.91 | $1.00 |
| 0050 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 1,200 | $1.00 | $3.00 | $0.91 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.