INDOT contract R-43694-A bid tabulation
HMA OVERLAY AND SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on October 8, 2025, Hendricks, Putnam, Crawfordsville. 5 bids received; low bid $3,636,703 by Milestone Contractors South LLC.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 84
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors South LLC | $3,636,703 | Low |
| 2 | E & B Paving LLC | $3,687,317 | +1.0% |
| 3 | Midwest Paving LLC | $3,719,670 | +2.0% |
| 4 | Rieth-Riley Construction Co., Inc. | $4,080,000 | +12% |
| 5 | Calumet Civil Contractors Inc | $4,145,000 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors South LLC | 2. E & B Paving LLC | 3. Midwest Paving LLC | 4. Rieth-Riley Construction Co., Inc. | 5. Calumet Civil Contractors Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $14,600 | $13,000 | $14,600 | $14,600 | $25,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 2 | $1,350.00 | $750.00 | $750.00 | $1,000.00 | $300.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 2 | $1,350.00 | $600.00 | $600.00 | $750.00 | $300.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $32,250 | $171,065 | $145,792 | $106,547 | $145,324 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $9,800.00 | $25,000 | $6,150.00 | $30,000 | $25,000 |
| 0014 | Detector housing, remove (202-90277) | EACH | 2 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0015 | Excavation, common (203-02000) | CYS | 1 | $505.00 | $145.00 | $1,800.00 | $1,000.00 | $100.00 |
| 0016 | Linear grading (203-08607) | LFT | 9,118 | $4.75 | $1.15 | $5.00 | $7.00 | $6.50 |
| 0017 | Linear grading , guardrail (203-08607) | LFT | 875 | $8.00 | $13.00 | $5.00 | $15.00 | $10.50 |
| 0018 | Pump around (205-11626) | EACH | 3 | $500.00 | $1,900.00 | $1,500.00 | $3,000.00 | $6,000.00 |
| 0019 | Stormwater management budget (205-12108) | DOL | 23,254 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $9,500.00 | $9,500.00 | $22,500 | $6,000.00 | $21,300 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 1,946 | $22.50 | $13.50 | $50.00 | $20.00 | $21.50 |
| 0022 | Structure backfill, type 1 (211-09264) | CYS | 348 | $74.00 | $145.00 | $55.00 | $65.00 | $54.00 |
| 0023 | Flowable backfill, non- removable (213-09269) | CYS | 44 | $300.00 | $145.00 | $165.00 | $220.00 | $205.00 |
| 0024 | Geogrid, type IB (214-11796) | SYS | 1,363 | $2.00 | $3.25 | $1.00 | $1.10 | $3.75 |
| 0025 | Compacted aggregate, no. 8 (301-12233) | CYS | 1 | $750.00 | $190.00 | $1,170.00 | $1,000.00 | $400.00 |
| 0026 | Compacted aggregate, no. 53 (301-12234) | CYS | 83 | $175.00 | $90.00 | $55.00 | $160.00 | $120.00 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 375 | $75.00 | $69.00 | $55.00 | $80.00 | $50.00 |
| 0028 | HMA patching, full depth, type B (304-12623) | TON | 489 | $250.00 | $215.00 | $420.00 | $300.00 | $155.00 |
| 0029 | HMA patching, partial depth, type B (304-12624) | TON | 66 | $350.00 | $195.00 | $420.00 | $300.00 | $155.00 |
| 0030 | Milling, asphalt, 2 in. (306-08036) | SYS | 174,746 | $0.75 | $1.35 | $1.50 | $2.45 | $2.00 |
| 0031 | Milling, approach (306-08432) | SYS | 8,214 | $2.00 | $3.65 | $7.00 | $5.00 | $4.30 |
| 0032 | Milling, asphalt, 4 1/2 in. (306-10113) | SYS | 266 | $22.00 | $16.00 | $8.50 | $5.00 | $11.00 |
| 0033 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 19,550 | $96.00 | $95.00 | $81.00 | $94.00 | $104.00 |
| 0034 | Joint adhesive (401-11526) | LFT | 177 | $2.50 | $1.00 | $1.00 | $2.40 | $0.45 |
| 0035 | Inertial profiler, HMA (401-12169) | LS | 1 | $9,200.00 | $3,000.00 | $20,000 | $4,000.00 | $4,600.00 |
| 0036 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 59,650 | $3.80 | $2.50 | $4.00 | $3.35 | $4.60 |
| 0037 | Asphalt for tack coat (406-05520) | TON | 63 | $725.00 | $1.00 | $1.00 | $0.01 | $0.01 |
| 0038 | HMA for approaches, type B (610-07487) | TON | 1,020 | $200.00 | $217.00 | $200.00 | $185.00 | $150.00 |
| 0039 | Right-of-way marker (615-06490) | EACH | 14 | $210.00 | $350.00 | $350.00 | $350.00 | $210.00 |
| 0040 | Monument, type B (615-06505) | EACH | 2 | $1,900.00 | $1,300.00 | $1,300.00 | $1,300.00 | $1,900.00 |
| 0041 | Monument, section corner (615-06527) | EACH | 6 | $1,340.00 | $800.00 | $800.00 | $800.00 | $98.00 |
| 0042 | Riprap, revetment (616-06405) | TON | 68 | $175.00 | $120.00 | $170.00 | $230.00 | $69.00 |
| 0043 | Geotextile for riprap, type 1A (616-12246) | SYS | 163 | $4.00 | $17.00 | $2.85 | $5.00 | $7.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 17 | $100.00 | $100.00 | $100.00 | $750.00 | $100.00 |
| 0045 | Mulched seeding, type R (621-06559) | SYS | 2,586 | $2.75 | $2.75 | $2.75 | $3.97 | $2.75 |
| 0046 | Field office, type C (628-09403) | MOS | 12 | $2,500.00 | $3,000.00 | $3,500.00 | $3,000.00 | $4,000.00 |
| 0047 | Computer system equipment (628-11976) | EACH | 2 | $1,100.00 | $600.00 | $1,080.00 | $1,000.00 | $1,725.00 |
| 0048 | Headwall reconstruct (714-96273) | LS | 1 | $9,500.00 | $10,000 | $35,000 | $20,000 | $2,500.00 |
| 0049 | Pipe end section, diameter 42 in. (715-04522) | EACH | 2 | $3,200.00 | $2,700.00 | $2,500.00 | $2,000.00 | $3,000.00 |
| 0050 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 321 | $104.00 | $114.00 | $97.00 | $100.00 | $120.00 |
| 0051 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 95 | $116.00 | $133.00 | $115.00 | $140.00 | $175.00 |
| 0052 | Pipe, type 1, circular, diameter 21 in. (715-05122) | LFT | 381 | $130.00 | $147.00 | $113.00 | $160.00 | $155.00 |
| 0053 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 48 | $136.00 | $157.00 | $135.00 | $170.00 | $175.00 |
| 0054 | Pipe, type 1, circular, diameter 30 in. (715-05125) | LFT | 45 | $183.00 | $200.00 | $168.00 | $200.00 | $215.00 |
| 0055 | Pipe, type 1, circular, diameter 42 in. (715-05127) | LFT | 59 | $260.00 | $238.00 | $285.00 | $230.00 | $325.00 |
| 0056 | HMA for structure installation, type B (715-08305) | TON | 454 | $115.00 | $135.00 | $165.00 | $300.00 | $175.00 |
| 0057 | Pipe end section, diameter 15 in. (715-46005) | EACH | 8 | $1,400.00 | $1,400.00 | $1,270.00 | $800.00 | $1,200.00 |
| 0058 | Pipe end section, diameter 18 in. (715-46010) | EACH | 4 | $1,500.00 | $1,500.00 | $1,350.00 | $900.00 | $1,300.00 |
| 0059 | Pipe end section, diameter 21 in. (715-46015) | EACH | 11 | $1,500.00 | $1,600.00 | $1,450.00 | $1,000.00 | $1,500.00 |
| 0060 | Pipe end section, diameter 24 in. (715-46020) | EACH | 2 | $1,800.00 | $1,700.00 | $1,550.00 | $1,200.00 | $1,600.00 |
| 0061 | Pipe end section, diameter 30 in. (715-46030) | EACH | 2 | $2,200.00 | $2,000.00 | $1,800.00 | $1,400.00 | $2,500.00 |
| 0062 | Road closure sign assembly (801-04308) | EACH | 6 | $400.00 | $179.00 | $400.00 | $400.00 | $400.00 |
| 0063 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 15,000 | $0.10 | $1.75 | $2.25 | $2.25 | $1.73 |
| 0064 | Detour route marker assembly (801-06625) | EACH | 50 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 0065 | Construction sign, type A (801-06640) | EACH | 73 | $350.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 0066 | Construction sign, type B (801-06645) | EACH | 11 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 0067 | Maintaining traffic (801-06775) | LS | 1 | $64,800 | $33,000 | $13,660 | $70,000 | $100,000 |
| 0068 | Barricade, type III-A (801-07118) | LFT | 36 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0069 | Temporary curb ramp (801-11990) | EACH | 2 | $2,950.00 | $200.00 | $5,000.00 | $3,000.00 | $2,000.00 |
| 0070 | Temporary accessible pedestrian path (801-12641) | SYS | 23 | $83.00 | $20.00 | $50.00 | $200.00 | $45.70 |
| 0071 | Temporary pedestrian channelizer (801-12862) | LFT | 85 | $53.00 | $5.00 | $22.00 | $60.00 | $20.60 |
| 0072 | Delineator post, flexible, type I (804-11920) | EACH | 34 | $100.00 | $75.00 | $75.00 | $75.00 | $98.00 |
| 0073 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 647 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 0074 | Signal detector housing (805-78785) | EACH | 2 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0075 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 205 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0076 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 80 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0077 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0078 | Grooving for pavement markings (808-12032) | LFT | 147,877 | $0.35 | $0.30 | $0.30 | $0.30 | $0.30 |
| 0079 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 98,418 | $1.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0080 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 40,439 | $1.10 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0081 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 104 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0082 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 985 | $10.00 | $10.00 | $7.00 | $10.00 | $10.00 |
| 0083 | Snowplowable raised pavement marker (808-75998) | EACH | 985 | $40.00 | $40.00 | $40.00 | $40.00 | $36.80 |
| 0084 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 9,020 | $1.10 | $1.00 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.