INDOT contract B-42265-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Henry, Greenfield. 11 bids received; low bid $262,000 by Calumet Civil Contractors Inc.
- Owner
- Indiana DOT
- Letting
- 10 SEP 2025
- Pay items
- 53
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Calumet Civil Contractors Inc | $262,000 | Low |
| 2 | Midwest Paving LLC | $268,970 | +3.0% |
| 3 | Indiana Earthworks, LLC | $273,850 | +5.0% |
| 4 | 5 Star Company Inc | $317,340 | +21% |
| 5 | Hoosier Pride Excavating Inc | $337,091 | +29% |
| 6 | E & B Paving LLC | $338,103 | +29% |
| 7 | Bunn Excavating Inc | $366,437 | +40% |
| 8 | 3D Company Inc | $393,836 | +50% |
| 9 | Morphey Construction Inc. | $396,396 | +51% |
| 10 | Milestone Contractors LP | $410,500 | +57% |
| 11 | Yarberry Companies Inc | $498,689 | +90% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Calumet Civil Contractors Inc | 2. Midwest Paving LLC | 3. Indiana Earthworks, LLC | 4. 5 Star Company Inc | 5. Hoosier Pride Excavating Inc | 6. E & B Paving LLC |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $6,000.00 | $8,000.00 | $5,500.00 | $20,000 | $6,480.00 | $5,883.96 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $9,213.02 | $15,000 | $28,000 | $29,500 | $15,000 | $21,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $4,000.00 | $6,000.00 | $3,032.25 | $7,500.00 | $2,000.00 | $18,403 |
| 0011 | Pipe abandon and grout fill (202-02637) | LFT | 44 | $25.00 | $95.00 | $225.00 | $231.00 | $80.00 | $200.00 |
| 0012 | Concrete, remove (202-99080) | CYS | 1 | $2,000.00 | $1,500.00 | $1,800.00 | $200.00 | $1,500.00 | $790.00 |
| 0013 | Excavation, common (203-02000) | CYS | 131 | $65.00 | $150.00 | $62.00 | $39.00 | $85.00 | $102.00 |
| 0014 | Pump around (205-11626) | EACH | 1 | $5,000.00 | $7,600.00 | $3,300.00 | $4,500.00 | $10,000 | $6,190.00 |
| 0015 | Stormwater management budget (205-12108) | DOL | 1,215 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $9,198.20 | $7,500.00 | $4,500.00 | $7,500.00 | $8,500.00 | $5,000.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 200 | $33.00 | $35.00 | $38.00 | $56.00 | $98.00 | $71.00 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 358 | $60.00 | $55.00 | $59.75 | $59.00 | $72.30 | $8.00 |
| 0019 | Geogrid, type IB (214-11796) | SYS | 125 | $5.00 | $5.00 | $4.50 | $6.80 | $5.00 | $7.00 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 206 | $14.00 | $5.00 | $8.50 | $6.00 | $12.00 | $7.00 |
| 0021 | Compacted aggregate, no. 5 (301-12232) | CYS | 83 | $85.00 | $130.00 | $92.00 | $56.00 | $168.00 | $120.00 |
| 0022 | Compacted aggregate, no. 53 (303-01180) | TON | 16 | $70.00 | $120.00 | $167.00 | $42.00 | $83.00 | $125.00 |
| 0023 | Milling, transition (306-08043) | SYS | 306 | $20.00 | $15.00 | $22.00 | $12.00 | $81.58 | $16.00 |
| 0024 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 41 | $155.00 | $200.00 | $230.00 | $165.00 | $342.44 | $377.00 |
| 0025 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 27 | $200.00 | $260.00 | $299.00 | $210.00 | $427.20 | $207.00 |
| 0026 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 84 | $150.00 | $125.00 | $144.00 | $160.00 | $214.20 | $196.00 |
| 0027 | Joint adhesive (401-11526) | LFT | 428 | $2.00 | $1.50 | $1.75 | $2.50 | $3.24 | $5.00 |
| 0028 | Asphalt for tack coat (406-05520) | TON | 1 | $0.01 | $1.00 | $1.00 | $850.00 | $918.00 | $0.01 |
| 0029 | Right-of-way marker (615-06490) | EACH | 8 | $280.00 | $325.00 | $390.00 | $350.00 | $459.00 | $325.00 |
| 0030 | Monument, type B (615-06505) | EACH | 2 | $1,550.00 | $1,200.00 | $1,400.00 | $1,500.00 | $2,214.00 | $1,200.00 |
| 0031 | Riprap, revetment (616-06405) | TON | 29 | $80.87 | $160.00 | $100.00 | $100.00 | $127.00 | $99.00 |
| 0032 | Geotextile for riprap, type 1A (616-12246) | SYS | 62 | $15.58 | $8.00 | $13.50 | $6.00 | $5.00 | $10.00 |
| 0033 | Geotextile for riprap, type 2B (616-12249) | SYS | 295 | $6.83 | $3.00 | $9.25 | $6.00 | $5.00 | $6.00 |
| 0034 | Inspection hole (616-93772) | EACH | 2 | $211.87 | $1,500.00 | $1,200.00 | $450.00 | $2,900.00 | $1,300.00 |
| 0035 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $625.00 | $625.00 | $1,200.00 | $450.00 | $500.00 | $625.00 |
| 0036 | Mulched seeding, type R (621-06559) | SYS | 267 | $14.09 | $6.60 | $19.00 | $15.00 | $6.00 | $6.60 |
| 0037 | Field office, type C (628-09403) | MOS | 12 | $3,287.50 | $2,370.83 | $2,600.00 | $2,000.00 | $2,420.00 | $3,000.00 |
| 0038 | Computer system equipment (628-11976) | EACH | 1 | $1,500.00 | $540.00 | $1,200.00 | $500.00 | $2,000.00 | $540.00 |
| 0039 | Pipe, PVC, 3 in. (715-04809) | LFT | 10 | $51.46 | $2.00 | $60.00 | $15.00 | $13.00 | $90.00 |
| 0040 | Pipe, type 1, deformed, min. area 15.6 SFT (715-05247) | LFT | 88 | $571.54 | $435.15 | $548.00 | $890.00 | $610.00 | $990.00 |
| 0041 | Concrete anchor, min. area 16.7 SFT (715-07303) | EACH | 2 | $3,414.06 | $10,000 | $3,500.00 | $6,200.00 | $1,028.00 | $8,900.00 |
| 0042 | Road closure sign assembly (801-04308) | EACH | 10 | $125.00 | $125.00 | $150.00 | $135.00 | $278.64 | $250.00 |
| 0043 | Detour route marker assembly (801-06625) | EACH | 36 | $75.00 | $75.00 | $100.00 | $80.00 | $279.00 | $145.00 |
| 0044 | Construction sign, type A (801-06640) | EACH | 4 | $200.00 | $200.00 | $240.00 | $210.00 | $236.52 | $175.00 |
| 0045 | Construction sign, type B (801-06645) | EACH | 2 | $75.00 | $75.00 | $95.00 | $80.00 | $106.92 | $55.00 |
| 0046 | Maintaining traffic (801-06775) | LS | 1 | $20,000 | $11,690 | $7,200.00 | $17,500 | $7,387.20 | $7,800.00 |
| 0047 | Barricade, type III-A (801-07118) | LFT | 48 | $12.00 | $12.00 | $15.00 | $13.00 | $2.25 | $15.00 |
| 0048 | Barricade, type III-B (801-07119) | LFT | 48 | $12.00 | $12.00 | $15.00 | $13.00 | $2.25 | $15.00 |
| 0049 | Grooving for pavement markings (808-12032) | LFT | 408 | $4.00 | $4.00 | $5.00 | $4.50 | $14.69 | $4.50 |
| 0050 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 272 | $5.00 | $5.00 | $6.00 | $5.50 | $7.02 | $4.50 |
| 0051 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 3 | $39.24 | $144.74 | $50.00 | $15.00 | $300.00 | $373.19 |
| 0052 | Snowplowable raised pavement marker (808-75998) | EACH | 3 | $250.00 | $250.00 | $312.00 | $260.00 | $400.00 | $465.00 |
| 0053 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 136 | $5.00 | $5.00 | $6.25 | $5.50 | $22.60 | $4.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.