INDOT contract B-42265-A bid tabulation

SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on September 10, 2025, Henry, Greenfield. 11 bids received; low bid $262,000 by Calumet Civil Contractors Inc.

Owner
Indiana DOT
Letting
10 SEP 2025
Pay items
53
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Calumet Civil Contractors Inc$262,000Low
2Midwest Paving LLC$268,970+3.0%
3Indiana Earthworks, LLC$273,850+5.0%
45 Star Company Inc$317,340+21%
5Hoosier Pride Excavating Inc$337,091+29%
6E & B Paving LLC$338,103+29%
7Bunn Excavating Inc$366,437+40%
83D Company Inc$393,836+50%
9Morphey Construction Inc.$396,396+51%
10Milestone Contractors LP$410,500+57%
11Yarberry Companies Inc$498,689+90%
INDOT contract B-42265-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Calumet Civil Contractors Inc2. Midwest Paving LLC3. Indiana Earthworks, LLC4. 5 Star Company Inc5. Hoosier Pride Excavating Inc6. E & B Paving LLC
0001Construction engineering (105-06845)LS1$6,000.00$8,000.00$5,500.00$20,000$6,480.00$5,883.96
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Mobilization and demobilization (110-01001)LS1$9,213.02$15,000$28,000$29,500$15,000$21,000
0010Clearing right-of-way (201-52370)LS1$4,000.00$6,000.00$3,032.25$7,500.00$2,000.00$18,403
0011Pipe abandon and grout fill (202-02637)LFT44$25.00$95.00$225.00$231.00$80.00$200.00
0012Concrete, remove (202-99080)CYS1$2,000.00$1,500.00$1,800.00$200.00$1,500.00$790.00
0013Excavation, common (203-02000)CYS131$65.00$150.00$62.00$39.00$85.00$102.00
0014Pump around (205-11626)EACH1$5,000.00$7,600.00$3,300.00$4,500.00$10,000$6,190.00
0015Stormwater management budget (205-12108)DOL1,215$1.00$1.00$1.00$1.00$1.00$1.00
0016Stormwater management implementation (205-12616)LS1$9,198.20$7,500.00$4,500.00$7,500.00$8,500.00$5,000.00
0017Subgrade treatment, type IC (207-09935)SYS200$33.00$35.00$38.00$56.00$98.00$71.00
0018Structure backfill, type 2 (211-09265)CYS358$60.00$55.00$59.75$59.00$72.30$8.00
0019Geogrid, type IB (214-11796)SYS125$5.00$5.00$4.50$6.80$5.00$7.00
0020Geotextile for pavement, type 2B (214-12239)SYS206$14.00$5.00$8.50$6.00$12.00$7.00
0021Compacted aggregate, no. 5 (301-12232)CYS83$85.00$130.00$92.00$56.00$168.00$120.00
0022Compacted aggregate, no. 53 (303-01180)TON16$70.00$120.00$167.00$42.00$83.00$125.00
0023Milling, transition (306-08043)SYS306$20.00$15.00$22.00$12.00$81.58$16.00
0024QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005)TON41$155.00$200.00$230.00$165.00$342.44$377.00
0025QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041)TON27$200.00$260.00$299.00$210.00$427.20$207.00
0026QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON84$150.00$125.00$144.00$160.00$214.20$196.00
0027Joint adhesive (401-11526)LFT428$2.00$1.50$1.75$2.50$3.24$5.00
0028Asphalt for tack coat (406-05520)TON1$0.01$1.00$1.00$850.00$918.00$0.01
0029Right-of-way marker (615-06490)EACH8$280.00$325.00$390.00$350.00$459.00$325.00
0030Monument, type B (615-06505)EACH2$1,550.00$1,200.00$1,400.00$1,500.00$2,214.00$1,200.00
0031Riprap, revetment (616-06405)TON29$80.87$160.00$100.00$100.00$127.00$99.00
0032Geotextile for riprap, type 1A (616-12246)SYS62$15.58$8.00$13.50$6.00$5.00$10.00
0033Geotextile for riprap, type 2B (616-12249)SYS295$6.83$3.00$9.25$6.00$5.00$6.00
0034Inspection hole (616-93772)EACH2$211.87$1,500.00$1,200.00$450.00$2,900.00$1,300.00
0035Mobilization and demobilization for seeding (621-01004)EACH1$625.00$625.00$1,200.00$450.00$500.00$625.00
0036Mulched seeding, type R (621-06559)SYS267$14.09$6.60$19.00$15.00$6.00$6.60
0037Field office, type C (628-09403)MOS12$3,287.50$2,370.83$2,600.00$2,000.00$2,420.00$3,000.00
0038Computer system equipment (628-11976)EACH1$1,500.00$540.00$1,200.00$500.00$2,000.00$540.00
0039Pipe, PVC, 3 in. (715-04809)LFT10$51.46$2.00$60.00$15.00$13.00$90.00
0040Pipe, type 1, deformed, min. area 15.6 SFT (715-05247)LFT88$571.54$435.15$548.00$890.00$610.00$990.00
0041Concrete anchor, min. area 16.7 SFT (715-07303)EACH2$3,414.06$10,000$3,500.00$6,200.00$1,028.00$8,900.00
0042Road closure sign assembly (801-04308)EACH10$125.00$125.00$150.00$135.00$278.64$250.00
0043Detour route marker assembly (801-06625)EACH36$75.00$75.00$100.00$80.00$279.00$145.00
0044Construction sign, type A (801-06640)EACH4$200.00$200.00$240.00$210.00$236.52$175.00
0045Construction sign, type B (801-06645)EACH2$75.00$75.00$95.00$80.00$106.92$55.00
0046Maintaining traffic (801-06775)LS1$20,000$11,690$7,200.00$17,500$7,387.20$7,800.00
0047Barricade, type III-A (801-07118)LFT48$12.00$12.00$15.00$13.00$2.25$15.00
0048Barricade, type III-B (801-07119)LFT48$12.00$12.00$15.00$13.00$2.25$15.00
0049Grooving for pavement markings (808-12032)LFT408$4.00$4.00$5.00$4.50$14.69$4.50
0050Line, thermoplastic, solid, white, 6 in. (808-75043)LFT272$5.00$5.00$6.00$5.50$7.02$4.50
0051Snowplowable raised pavement marker, remove (808-75996)EACH3$39.24$144.74$50.00$15.00$300.00$373.19
0052Snowplowable raised pavement marker (808-75998)EACH3$250.00$250.00$312.00$260.00$400.00$465.00
0053Line, thermoplastic, broken, yellow, 6 in. (808-96078)LFT136$5.00$5.00$6.25$5.50$22.60$4.50
INDOT contract B-42265-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 10, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy