3D Company Inc: INDOT bid record
3D Company Inc submitted 61 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 10 of them (16%). When it was not low, its total sat a median +21% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $14,446,442
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 8 | 2 | 25% |
| 2023 | 11 | 3 | 27% |
| 2024 | 16 | 2 | 13% |
| 2025 | 15 | 2 | 13% |
| 2026 | 11 | 1 | 9% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Greenfield | 42 | 7 | 17% |
| Fort Wayne | 19 | 3 | 16% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 59 | 59 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 54 | 54 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 47 | 47 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 39 | 39 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 21 | 21 (100%) | $1.00 | $1.00 |
| Structure backfill, type 2 | 211-09265 | CYS | 37 | 14 (38%) | $67.30 | $82.00 |
| Payment adjustment PG asphalt binder | 109-09489 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Borrow | 203-02070 | CYS | 25 | 11 (44%) | $22.78 | $38.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Morphey Construction Inc. | 46 | 21 of 46 |
| E & B Paving LLC | 25 | 21 of 25 |
| Milestone Contractors LP | 17 | 10 of 17 |
| Yarberry Companies Inc | 16 | 4 of 16 |
| Brooks Construction Company Inc | 14 | 12 of 14 |
| Calumet Civil Contractors Inc | 11 | 7 of 11 |
| Rieth-Riley Construction Co., Inc. | 10 | 5 of 10 |
| 5 Star Company Inc | 10 | 8 of 10 |
| Olco Inc | 9 | 7 of 9 |
| Gradex Inc | 8 | 5 of 8 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | B-44588-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 2 of 5 | $154,405 | +15% |
| 02 SEP 2026 | B-44595-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 3 of 5 | $416,455 | +6.0% |
| 05 AUG 2026 | B-45351-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 8 of 8 | $747,229 | +36% |
| 08 JUL 2026 | B-45347-A | Greenfield | SCOUR PROTECTION | 4 of 6 | $466,192 | +36% |
| 11 MAR 2026 | R-44024-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 2 of 6 | $5,654,000 | +3.0% |
| 11 FEB 2026 | R-43476-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 2 of 7 | $1,997,000 | +1.0% |
| 11 FEB 2026 | R-43847-A | Fort Wayne | SMALL STRUCTURE PIPE LINING | 4 of 6 | $1,936,238 | +14% |
| 11 FEB 2026 | B-43957-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 1 of 3 | $2,039,925 | Low, 10% under the second |
| 14 JAN 2026 | R-42755-A | Greenfield | NEW ROAD CONSTRUCTION | 5 of 10 | $3,712,023 | +10% |
| 14 JAN 2026 | R-43956-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 5 of 6 | $242,098 | +36% |
| 14 JAN 2026 | B-43516-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 4 of 12 | $704,159 | +6.0% |
| 10 DEC 2025 | R-42770-A | Fort Wayne | SIGHT DISTANCE IMPROVEMENT | 4 of 7 | $989,870 | +3.0% |
| 13 NOV 2025 | R-42797-A | Greenfield | BIKE AND PEDESTRIAN FACILITIES | 7 of 8 | $2,437,000 | +34% |
| 13 NOV 2025 | R-43811-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 2 of 7 | $425,240 | +8.0% |
| 08 OCT 2025 | R-46140-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR | 4 of 6 | $402,682 | +19% |
| 08 OCT 2025 | B-43885-A | Greenfield | SMALL STRUCTURE PIPE LINING AND DRAINS CONSTRUCTION | 2 of 5 | $454,413 | +27% |
| 08 OCT 2025 | B-43960-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 2 of 9 | $390,870 | +17% |
| 10 SEP 2025 | R-43936-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 5 of 7 | $1,087,000 | +23% |
| 10 SEP 2025 | B-42265-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 8 of 11 | $393,836 | +50% |
| 06 AUG 2025 | R-43792-A | Fort Wayne | SMALL STRUCTURES, DRAINS CONSTRUCTION AND PIPE LINING | 4 of 4 | $2,994,126 | +18% |
| 06 AUG 2025 | B-43959-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 4 of 4 | $732,957 | +23% |
| 09 JUL 2025 | R-42268-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 5 of 9 | $370,960 | +19% |
| 09 JUL 2025 | B-42343-A | Greenfield | SMALL STRUCTURE PIPE LINING | 1 of 4 | $356,361 | Low, 14% under the second |
| 07 MAY 2025 | R-43803-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 1 of 3 | $536,320 | Low, 12% under the second |
| 09 APR 2025 | B-44074-A | Greenfield | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 3 of 5 | $385,448 | +36% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.