INDOT contract R-46140-A bid tabulation
SMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR. Let by Indiana DOT on October 8, 2025, Huntington, Miami, Fort Wayne. 6 bids received; low bid $339,358 by Pioneer Associates Inc.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 51
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pioneer Associates Inc | $339,358 | Low |
| 2 | Morphey Construction Inc. | $355,000 | +5.0% |
| 3 | E & B Paving LLC | $397,873 | +17% |
| 4 | 3D Company Inc | $402,682 | +19% |
| 5 | Brooks Construction Company Inc | $426,641 | +26% |
| 6 | Bunn Excavating Inc | $448,955 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pioneer Associates Inc | 2. Morphey Construction Inc. | 3. E & B Paving LLC | 4. 3D Company Inc | 5. Brooks Construction Company Inc | 6. Bunn Excavating Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $7,500.00 | $10,000 | $7,700.00 | $10,005 | $9,500.00 | $11,933 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $42,350 | $17,750 | $19,505 | $29,262 | $21,200 | $46,388 |
| 0011 | Tree, 30 in., remove (201-02260) | EACH | 1 | $1,200.00 | $3,000.00 | $6,500.00 | $3,340.00 | $3,400.00 | $1,736.35 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $6,000.00 | $5,000.00 | $8,100.00 | $14,350 | $40,000 | $26,665 |
| 0013 | Excavation, common (203-02000) | CYS | 146 | $110.00 | $60.00 | $101.00 | $87.32 | $105.00 | $215.11 |
| 0014 | Pump around (205-11626) | EACH | 3 | $5,500.00 | $5,000.00 | $14,700 | $8,810.00 | $11,500 | $8,482.11 |
| 0015 | Stormwater management budget (205-12108) | DOL | 3,940 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0016 | Stormwater management implementation (205-12616) | LS | 1 | $4,000.00 | $5,000.00 | $10,500 | $8,390.00 | $5,120.00 | $5,527.36 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 134 | $60.00 | $60.00 | $25.00 | $48.10 | $38.00 | $52.91 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 27 | $95.00 | $150.00 | $108.00 | $61.15 | $112.00 | $82.60 |
| 0019 | Structure backfill, type 5 (211-09268) | CYS | 120 | $240.00 | $200.00 | $223.00 | $208.20 | $240.00 | $240.18 |
| 0020 | Geotextile for pavement, type 2B (214-12239) | SYS | 134 | $8.00 | $4.00 | $5.00 | $11.25 | $15.00 | $12.48 |
| 0021 | Compacted aggregate, no. 8 (301-12233) | CYS | 15 | $145.00 | $160.00 | $108.00 | $131.65 | $145.00 | $249.99 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 15 | $135.00 | $140.00 | $120.00 | $117.00 | $220.00 | $123.98 |
| 0023 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 227 | $21.78 | $25.00 | $33.00 | $22.65 | $32.00 | $22.38 |
| 0024 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 29 | $270.00 | $375.00 | $375.00 | $297.00 | $270.00 | $434.09 |
| 0025 | Joint adhesive (401-11526) | LFT | 200 | $1.00 | $0.50 | $0.50 | $1.10 | $1.00 | $0.58 |
| 0026 | Asphalt for tack coat (406-05520) | TON | 0.20 | $2,088.00 | $500.00 | $500.00 | $2,300.00 | $2,088.00 | $578.80 |
| 0027 | Right-of-way marker (615-06490) | EACH | 8 | $275.00 | $275.00 | $275.00 | $325.00 | $275.00 | $318.33 |
| 0028 | Monument, type B (615-06505) | EACH | 2 | $1,250.00 | $1,250.00 | $1,250.00 | $1,470.00 | $1,250.00 | $1,446.96 |
| 0029 | Riprap, revetment (616-06405) | TON | 83 | $75.00 | $160.00 | $109.00 | $101.45 | $65.00 | $132.45 |
| 0030 | Geotextile for riprap, type 2A (616-12248) | SYS | 350 | $3.00 | $5.00 | $5.00 | $4.80 | $6.25 | $3.11 |
| 0031 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $100.00 | $500.00 | $380.00 | $500.00 | $578.78 |
| 0032 | Erosion control blanket (621-02770) | SYS | 134 | $4.50 | $12.00 | $4.50 | $5.05 | $4.50 | $5.21 |
| 0033 | Mulched seeding, type R (621-06559) | SYS | 519 | $4.00 | $22.00 | $4.00 | $7.85 | $4.00 | $4.63 |
| 0034 | Concrete, A, substructure (702-51005) | CYS | 4 | $6,600.00 | $10,000 | $8,200.00 | $11,285 | $9,000.00 | $20,801 |
| 0035 | Field drilled hole in concrete (702-51863) | EACH | 127 | $15.00 | $100.00 | $55.00 | $55.00 | $50.00 | $23.15 |
| 0036 | Reinforcing bars, epoxy coated (703-06029) | LBS | 351 | $6.00 | $20.00 | $1.00 | $19.30 | $12.00 | $5.79 |
| 0037 | Surface seal (709-51821) | LS | 1 | $700.00 | $5,000.00 | $7,200.00 | $3,800.00 | $2,000.00 | $0.01 |
| 0038 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,093 | $3.50 | $5.00 | $6.00 | $4.95 | $5.25 | $6.36 |
| 0039 | Pipe, type 1, circular, diameter 72 in. (715-05136) | LFT | 58 | $970.00 | $940.00 | $1,400.00 | $864.50 | $1,000.00 | $546.16 |
| 0040 | Concrete anchor, diameter 72 in. (715-06357) | EACH | 2 | $8,000.00 | $5,000.00 | $10,500 | $9,255.00 | $6,750.00 | $8,735.14 |
| 0041 | HMA for structure installation, type B (715-08305) | TON | 53 | $225.00 | $298.00 | $215.00 | $250.95 | $225.00 | $248.88 |
| 0042 | Pipe, drain tile terminal (719-05443) | LFT | 30 | $80.00 | $20.00 | $130.00 | $79.25 | $105.00 | $51.76 |
| 0043 | Pipe, drain tile terminal (719-09447) | LFT | 10 | $90.00 | $40.00 | $185.00 | $165.00 | $105.00 | $81.10 |
| 0044 | Road closure sign assembly (801-04308) | EACH | 4 | $300.00 | $300.00 | $246.00 | $330.00 | $300.00 | $347.27 |
| 0045 | Detour route marker assembly (801-06625) | EACH | 37 | $115.00 | $115.00 | $147.00 | $126.50 | $115.00 | $231.51 |
| 0046 | Construction sign, type A (801-06640) | EACH | 60 | $150.00 | $150.00 | $201.00 | $165.00 | $150.00 | $260.45 |
| 0047 | Maintaining traffic (801-06775) | LS | 1 | $28,850 | $27,709 | $13,600 | $47,900 | $58,838 | $21,184 |
| 0048 | Barricade, type III-A (801-07118) | LFT | 48 | $14.00 | $15.00 | $15.41 | $15.40 | $14.00 | $17.36 |
| 0049 | Barricade, type III-B (801-07119) | LFT | 48 | $14.00 | $15.00 | $15.41 | $15.40 | $14.00 | $17.36 |
| 0050 | Line, paint, broken, yellow, 6 in. (808-12764) | LFT | 38 | $1.50 | $1.50 | $3.39 | $1.65 | $1.50 | $5.79 |
| 0051 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 300 | $1.50 | $1.50 | $1.62 | $1.65 | $1.50 | $5.79 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.