Brooks Construction Company Inc: INDOT bid record

Brooks Construction Company Inc submitted 111 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 46 of them (41%). When it was not low, its total sat a median +10% above the low bid.

Owner
Indiana DOT
Low bid volume
$189,026,502
Latest bid
05 NOV 2026
Data through
05 NOV 2026
111Bids
46Low bids
41Win rate, percent
+10%Median gap to the low bid when not low, 65 bids

By year

YearBidsLow bidsWin rate
2022211571%
202323939%
2024231043%
202526727%
202618528%
Brooks Construction Company Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Wayne943941%
Greenfield13646%
Fort Wayne, Greenfield2150%
LaPorte200%
Brooks Construction Company Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL108108 (100%)$1.00$1.00
Contract liens109-08360DOL108108 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL108108 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL9898 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL9595 (100%)$1.00$1.00
Stormwater management budget205-12108DOL8181 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL8181 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL7171 (100%)$1.00$1.00
Mobilization and demobilization for seeding621-01004EACH7054 (77%)$500.00$525.00
Quality adjustments, pavement traffic markings109-09377DOL5454 (100%)$1.00$1.00
Project estimate adjustment109-08463DOL4949 (100%)$1.00$1.00
Construction sign, type A801-06640EACH7345 (62%)$211.00$200.00
Brooks Construction Company Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
E & B Paving LLC7541 of 75
Phend & Brown Inc4013 of 40
Milestone Contractors LP239 of 23
Morphey Construction Inc.2313 of 23
3D Company Inc142 of 14
Pioneer Associates Inc94 of 9
Bunn Excavating Inc83 of 8
Gradex Inc64 of 6
Fleming Excavating Inc63 of 6
Rieth-Riley Construction Co., Inc.51 of 5
Brooks Construction Company Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026B-44548-AFort WayneBRIDGE REPLACEMENT AND REHABILITATION2 of 5$1,581,090+1.0%
05 NOV 2026B-44588-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION1 of 5$134,368Low, 15% under the second
02 SEP 2026R-44529-AFort WayneSMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR2 of 5$903,448+10%
05 AUG 2026R-42382-AFort WayneHMA OVERLAY, STRUCTURAL1 of 3$12,839,926Low, 1.0% under the second
05 AUG 2026R-43626-AFort WayneADA SIDEWALK RAMP CONSTRUCTION3 of 6$2,862,894+23%
05 AUG 2026R-45761-AGreenfieldPAVEMENT PATCHING2 of 2$3,385,263+117%
05 AUG 2026B-45351-AGreenfieldSMALL STRUCTURE REPLACEMENT4 of 8$664,172+21%
08 JUL 2026R-43623-AFort WayneINTERSECTION IMPROVEMENT, ROUNDABOUT3 of 5$2,752,688+6.0%
08 JUL 2026R-44162-AGreenfieldHMA OVERLAY, MINOR STRUCTURAL3 of 3$7,195,957+34%
08 JUL 2026R-45569-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE2 of 2$1,402,204+9.0%
08 JUL 2026R-46493-AFort WayneSMALL STRUCTURES AND DRAINS CONSTRUCTION5 of 5$587,438+30%
08 JUL 2026R-46536-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE2 of 3$745,025+16%
11 MAR 2026R-45581-AFort WaynePAVEMENT PATCHING1 of 2$3,368,076Low, 53% under the second
11 MAR 2026R-45627-ALaPorteHMA OVERLAY, PREVENTIVE MAINTENANCE3 of 4$145,256+13%
11 FEB 2026R-41954-AFort WayneINTERSECTION IMPROVEMENT, ROUNDABOUT1 of 4$2,283,875Low, 4.0% under the second
11 FEB 2026R-43813-AFort WayneMEDIAN CONSTRUCTION AND ADA SIDEWALK RAMP CONSTRUCTION3 of 3$7,687,654+4.0%
11 FEB 2026R-44966-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE1 of 2$264,029Low, 2.0% under the second
11 FEB 2026R-45756-AFort WaynePAVEMENT PATCHING2 of 3$391,966+5.0%
10 DEC 2025R-42770-AFort WayneSIGHT DISTANCE IMPROVEMENT2 of 7$979,532+1.0%
10 DEC 2025R-43812-AFort WayneSMALL STRUCTURE PIPE LINING AND REPLACEMENT2 of 4$1,960,986+5.0%
13 NOV 2025R-43811-AFort WayneSMALL STRUCTURE REPLACEMENT4 of 7$473,453+21%
13 NOV 2025R-44771-AFort WayneADA SIDEWALK RAMP CONSTRUCTION3 of 4$443,359+20%
08 OCT 2025R-41153-AFort WayneADDED TRAVEL LANES5 of 6$5,119,037+25%
08 OCT 2025R-43804-AFort WayneHMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE PIPE LINING3 of 4$13,349,345+28%
08 OCT 2025R-43808-AFort WayneHMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE REPLACEMENT2 of 2$1,157,218+3.0%
Brooks Construction Company Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy