INDOT contract R-41153-A bid tabulation
ADDED TRAVEL LANES. Let by Indiana DOT on October 8, 2025, Kosciusko, Fort Wayne. 6 bids received; low bid $4,086,093 by HRP Construction Inc.
- Owner
- Indiana DOT
- Letting
- 08 OCT 2025
- Pay items
- 153
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | HRP Construction Inc | $4,086,093 | Low |
| 2 | C & E Excavating Inc | $4,149,800 | +2.0% |
| 3 | Gradex Inc | $4,305,260 | +5.0% |
| 4 | Phend & Brown Inc | $4,428,357 | +8.0% |
| 5 | Brooks Construction Company Inc | $5,119,037 | +25% |
| 6 | Bunn Excavating Inc | $5,384,188 | +32% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. HRP Construction Inc | 2. C & E Excavating Inc | 3. Gradex Inc | 4. Phend & Brown Inc | 5. Brooks Construction Company Inc | 6. Bunn Excavating Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $70,000 | $82,011 | $688,652 | $90,000 | $66,700 | $76,124 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 20 | $750.00 | $1,100.00 | $1,598.48 | $700.00 | $2,000.00 | $880.96 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 20 | $350.00 | $850.00 | $959.09 | $350.00 | $1,600.00 | $555.28 |
| 0004 | Railroad flagging budget (107-12976) | DOL | 9,925 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Mobilization and demobilization (110-01001) | LS | 1 | $204,300 | $180,000 | $215,263 | $250,000 | $255,000 | $113,192 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $108,000 | $138,616 | $43,053 | $130,000 | $50,000 | $67,674 |
| 0015 | Paved side ditch, remove (202-02272) | LFT | 234 | $3.00 | $8.00 | $11.17 | $17.87 | $14.00 | $6.04 |
| 0016 | Curb, concrete, remove (202-02278) | LFT | 85 | $3.00 | $9.00 | $6.92 | $11.14 | $22.00 | $3.87 |
| 0017 | Curb and gutter, remove (202-02279) | LFT | 1,080 | $3.00 | $9.00 | $6.91 | $11.14 | $21.00 | $2.06 |
| 0018 | Sidewalk concrete, remove (202-52710) | SYS | 308 | $5.00 | $11.00 | $15.95 | $16.14 | $25.00 | $6.15 |
| 0019 | Inlet, remove (202-91385) | EACH | 3 | $175.00 | $450.00 | $606.72 | $297.53 | $500.00 | $333.72 |
| 0020 | Fence, chain link, remove (202-91840) | LFT | 125 | $10.00 | $6.50 | $5.49 | $6.00 | $6.00 | $6.89 |
| 0021 | Manhole, remove (202-93047) | EACH | 3 | $250.00 | $755.00 | $606.72 | $2,262.86 | $950.00 | $333.72 |
| 0022 | Pipe, remove (202-96133) | LFT | 1,291 | $11.00 | $16.00 | $11.41 | $27.64 | $25.00 | $11.98 |
| 0023 | Excavation, common (203-02000) | CYS | 11,015 | $31.00 | $18.00 | $27.53 | $26.14 | $54.00 | $60.55 |
| 0024 | Linear grading (203-08607) | LFT | 553 | $9.00 | $13.00 | $7.33 | $23.94 | $22.00 | $60.20 |
| 0025 | Stormwater management budget (205-12108) | DOL | 78,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0026 | Stormwater management implementation (205-12616) | LS | 1 | $35,000 | $31,000 | $77,153 | $25,000 | $1,000.00 | $83,033 |
| 0027 | SWQCP preparation (205-12618) | LS | 1 | $7,500.00 | $2,950.00 | $2,300.00 | $2,800.00 | $2,800.00 | $3,214.49 |
| 0028 | Subgrade treatment, type II (207-08264) | SYS | 1,066 | $20.00 | $23.00 | $31.20 | $33.40 | $27.00 | $25.04 |
| 0029 | Subgrade treatment, type IC (207-09935) | SYS | 20,083 | $25.00 | $30.00 | $23.23 | $28.74 | $36.50 | $44.62 |
| 0030 | Structure backfill, type 1 (211-09264) | CYS | 1,310 | $5.00 | $35.00 | $20.80 | $94.87 | $130.00 | $87.78 |
| 0031 | Geogrid, type IB (214-11796) | SYS | 295 | $4.00 | $8.50 | $2.49 | $6.00 | $3.50 | $3.22 |
| 0032 | Compacted aggregate, no. 53 (301-12234) | CYS | 346 | $100.00 | $118.00 | $43.56 | $110.11 | $203.00 | $82.27 |
| 0033 | Dense graded subbase (302-07455) | CYS | 122 | $105.00 | $330.00 | $150.40 | $110.11 | $175.00 | $101.86 |
| 0034 | Compacted aggregate, no. 53 (303-01180) | TON | 296 | $93.00 | $88.00 | $44.40 | $93.74 | $77.00 | $53.94 |
| 0035 | Compacted aggregate, no. 73 (303-07449) | TON | 15 | $83.00 | $95.00 | $128.11 | $130.10 | $125.00 | $56.12 |
| 0036 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 637 | $30.00 | $45.00 | $51.82 | $45.00 | $95.00 | $66.96 |
| 0037 | Widening with HMA, type B (304-07493) | TON | 103 | $325.00 | $364.00 | $195.00 | $195.00 | $260.00 | $223.87 |
| 0038 | HMA patching, full depth, type B (304-12623) | TON | 112 | $425.00 | $340.00 | $200.00 | $200.00 | $272.00 | $229.61 |
| 0039 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 1,990 | $7.00 | $2.00 | $2.35 | $4.86 | $6.75 | $5.45 |
| 0040 | Milling, transition (306-08043) | SYS | 126 | $50.00 | $2.00 | $1.75 | $13.46 | $48.00 | $80.84 |
| 0041 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 1,272 | $102.00 | $108.00 | $102.00 | $102.00 | $106.00 | $117.10 |
| 0042 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 1,803 | $82.00 | $87.00 | $82.00 | $82.00 | $83.00 | $94.14 |
| 0043 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 4,191 | $72.00 | $77.00 | $72.00 | $72.00 | $77.00 | $82.66 |
| 0044 | Joint adhesive (401-11526) | LFT | 11,689 | $0.50 | $0.55 | $0.50 | $0.50 | $0.29 | $0.57 |
| 0045 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 11,689 | $3.00 | $3.30 | $2.65 | $2.72 | $2.65 | $3.16 |
| 0046 | Asphalt for tack coat (406-05520) | TON | 18 | $850.00 | $875.00 | $850.00 | $850.00 | $900.00 | $975.83 |
| 0047 | Cracks in asphalt pavement, fill (408-12028) | TON | 1 | $1,400.00 | $1,450.00 | $1,400.00 | $1,400.00 | $2,800.00 | $1,607.24 |
| 0048 | Guardrail terminal system, W-beam, curved, type 2 (601-01701) | EACH | 1 | $2,950.00 | $3,175.00 | $2,950.00 | $3,000.00 | $3,000.00 | $3,444.10 |
| 0049 | Guardrail, remove (601-02241) | LFT | 1,512 | $4.50 | $3.00 | $4.50 | $3.00 | $3.00 | $3.44 |
| 0050 | Guardrail terminal system, W-beam, curved, type 9 (601-05586) | EACH | 1 | $3,200.00 | $3,350.00 | $3,200.00 | $3,300.00 | $3,300.00 | $3,788.51 |
| 0051 | Hand dig guardrail post holes (601-09238) | EACH | 51 | $100.00 | $105.00 | $100.00 | $104.00 | $104.00 | $119.40 |
| 0052 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 44 | $25.00 | $29.00 | $25.00 | $27.00 | $27.00 | $31.00 |
| 0053 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,050.00 | $1,000.00 | $1,050.00 | $948.00 | $948.00 | $1,088.33 |
| 0054 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $3,150.00 | $2,950.00 | $3,150.00 | $2,900.00 | $2,900.00 | $3,329.29 |
| 0055 | Guardrail, W-beam, 6 FT 3 in. spacing (601-99105) | LFT | 88 | $25.00 | $29.00 | $25.00 | $28.00 | $28.00 | $32.14 |
| 0056 | Sidewalk, concrete , 4 inch (604-06070) | SYS | 1,423 | $70.00 | $76.00 | $70.00 | $70.00 | $99.00 | $80.36 |
| 0057 | Curb ramp, concrete (604-08086) | SYS | 157 | $230.00 | $160.00 | $230.00 | $230.00 | $244.00 | $264.05 |
| 0058 | Detectable warning surfaces (604-12083) | SYS | 29 | $220.00 | $150.00 | $220.00 | $220.00 | $185.00 | $252.57 |
| 0059 | Curb, concrete (605-06120) | LFT | 358 | $55.00 | $53.00 | $55.00 | $55.00 | $119.00 | $63.14 |
| 0060 | Curb and gutter, concrete (605-06140) | LFT | 450 | $28.00 | $48.50 | $28.00 | $28.00 | $40.00 | $32.14 |
| 0061 | Curb and gutter, concrete , combined (605-06140) | LFT | 3,503 | $28.00 | $44.00 | $28.00 | $28.00 | $30.50 | $32.14 |
| 0062 | Curb and gutter, concrete , combined, modified (605-06140) | LFT | 218 | $28.00 | $44.00 | $28.00 | $28.00 | $30.50 | $32.14 |
| 0063 | Center curb, concrete, type D (605-06255) | SYS | 80 | $250.00 | $240.00 | $250.00 | $250.00 | $239.00 | $287.01 |
| 0064 | HMA for approaches, type B (610-07487) | TON | 1,063 | $113.00 | $138.00 | $113.00 | $113.00 | $135.00 | $129.73 |
| 0065 | PCCP for approaches, 6 in. (610-08446) | SYS | 181 | $115.00 | $124.00 | $115.00 | $115.00 | $155.00 | $132.02 |
| 0066 | PCCP for approaches, 9 in. (610-09108) | SYS | 529 | $120.00 | $138.00 | $120.00 | $120.00 | $173.00 | $137.76 |
| 0067 | Mailbox assembly, single (611-06497) | EACH | 7 | $400.00 | $320.00 | $400.00 | $305.00 | $305.00 | $350.15 |
| 0068 | Mailbox assembly, double (611-06498) | EACH | 3 | $550.00 | $500.00 | $550.00 | $475.00 | $475.00 | $545.31 |
| 0069 | Monument, type B (615-06505) | EACH | 9 | $1,025.00 | $1,050.00 | $1,025.00 | $1,008.00 | $1,008.00 | $1,157.22 |
| 0070 | Riprap, revetment (616-06405) | TON | 147 | $125.00 | $100.00 | $73.95 | $200.00 | $115.00 | $107.80 |
| 0071 | Geotextile for riprap, type 1B (616-12247) | SYS | 277 | $7.00 | $7.00 | $3.55 | $10.00 | $5.25 | $4.23 |
| 0072 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $550.00 | $550.00 | $550.00 | $550.00 | $550.00 | $574.02 |
| 0073 | Erosion control blanket (621-02770) | SYS | 9,225 | $1.48 | $1.50 | $1.48 | $1.48 | $1.48 | $2.58 |
| 0074 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $1,270.00 | $1,300.00 | $1,270.00 | $1,270.00 | $1,270.00 | $1,664.65 |
| 0075 | Seed mixture, type U (621-06554) | LBS | 382 | $5.98 | $6.00 | $5.98 | $13.00 | $5.98 | $14.35 |
| 0076 | Water (621-06567) | KGAL | 22 | $5.00 | $5.50 | $5.00 | $5.00 | $5.00 | $11.48 |
| 0077 | Topsoil (621-06570) | CYS | 1,225 | $75.00 | $85.00 | $68.59 | $75.00 | $77.00 | $91.84 |
| 0078 | Sodding (621-06574) | SYS | 425 | $4.95 | $5.00 | $8.80 | $13.00 | $4.95 | $9.76 |
| 0079 | Sodding, nursery (621-06575) | SYS | 4,948 | $4.95 | $5.00 | $8.80 | $13.00 | $4.95 | $9.76 |
| 0080 | Field office, type C (628-09403) | MOS | 18 | $3,500.00 | $2,250.00 | $2,177.78 | $3,250.00 | $3,250.00 | $4,752.00 |
| 0081 | Computer system equipment (628-11976) | EACH | 1 | $2,500.00 | $850.00 | $3,510.00 | $500.00 | $500.00 | $4,292.27 |
| 0082 | Computer system (628-11977) | EACH | 1 | $2,500.00 | $3,750.00 | $810.00 | $3,200.00 | $3,200.00 | $4,292.27 |
| 0083 | Sanitary sewer service adjustment (715-02181) | LFT | 137 | $35.00 | $80.00 | $79.31 | $120.08 | $175.00 | $156.35 |
| 0084 | Pipe , 12 inch, pressure grade (715-04612) | LFT | 189 | $70.00 | $104.00 | $45.26 | $98.02 | $115.00 | $73.59 |
| 0085 | Pipe , 15 inch, pressure grade (715-04612) | LFT | 158 | $127.00 | $115.00 | $50.36 | $115.44 | $120.00 | $77.95 |
| 0086 | Pipe, type 1, circular, diameter 36 in. (715-05019) | LFT | 79 | $140.00 | $214.00 | $112.61 | $198.44 | $229.00 | $215.66 |
| 0087 | Pipe, type 1, circular, diameter 42 in. (715-05127) | LFT | 127 | $170.00 | $257.00 | $141.83 | $230.06 | $252.00 | $247.82 |
| 0088 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 766 | $57.00 | $53.00 | $35.47 | $67.90 | $103.00 | $249.30 |
| 0089 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 1,009 | $65.00 | $47.00 | $35.42 | $57.76 | $110.00 | $242.72 |
| 0090 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 114 | $70.00 | $73.00 | $39.96 | $87.53 | $128.00 | $55.64 |
| 0091 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 193 | $80.00 | $111.00 | $65.88 | $144.33 | $135.00 | $158.63 |
| 0092 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 289 | $95.00 | $165.00 | $89.54 | $168.63 | $175.00 | $167.58 |
| 0093 | Pipe, type 4, circular, diameter 4 in. (715-05203) | LFT | 17 | $45.00 | $103.00 | $20.91 | $45.51 | $71.00 | $110.22 |
| 0094 | Concrete anchor, diameter 42 in. (715-05842) | EACH | 2 | $8,500.00 | $5,900.00 | $3,487.17 | $25,000 | $8,600.00 | $3,859.15 |
| 0095 | Stormwater treatment system (715-08048) | EACH | 1 | $67,000 | $57,500 | $29,005 | $50,000 | $40,000 | $32,472 |
| 0096 | HMA for structure installation, type B (715-08305) | TON | 109 | $120.00 | $345.00 | $120.00 | $120.00 | $267.00 | $137.76 |
| 0097 | Video inspection for pipe (715-09064) | LFT | 2,941 | $1.15 | $1.25 | $1.29 | $1.50 | $1.15 | $2.66 |
| 0098 | Pipe end section, diameter 12 in. (715-46000) | EACH | 2 | $350.00 | $1,350.00 | $1,584.28 | $727.83 | $965.00 | $799.51 |
| 0099 | Pipe end section, diameter 15 in. (715-46005) | EACH | 1 | $375.00 | $850.00 | $1,647.95 | $779.65 | $1,090.00 | $852.25 |
| 0100 | Pipe end section, diameter 30 in. (715-46030) | EACH | 1 | $1,400.00 | $3,650.00 | $2,539.58 | $1,953.95 | $2,300.00 | $1,712.25 |
| 0101 | Pipe end section, diameter 36 in. (715-46040) | EACH | 2 | $1,900.00 | $4,000.00 | $2,823.63 | $3,519.85 | $2,655.00 | $3,304.28 |
| 0102 | Manhole, type J15, modified (720-01092) | EACH | 3 | $10,000 | $5,850.00 | $4,100.59 | $8,184.76 | $9,200.00 | $7,114.44 |
| 0103 | Manhole, type J7, modified (720-08239) | EACH | 2 | $10,000 | $4,800.00 | $4,100.59 | $7,333.30 | $8,450.00 | $6,247.67 |
| 0104 | Casting, manhole, adjust to grade (720-12798) | EACH | 9 | $350.00 | $750.00 | $2,157.63 | $782.10 | $940.00 | $396.03 |
| 0105 | Inlet, type E7 (720-45030) | EACH | 2 | $6,600.00 | $3,500.00 | $2,146.66 | $2,767.23 | $6,300.00 | $3,904.54 |
| 0106 | Inlet, type F7 (720-45035) | EACH | 1 | $6,600.00 | $2,800.00 | $2,007.63 | $2,878.85 | $3,915.00 | $4,019.33 |
| 0107 | Manhole, type C4 (720-45410) | EACH | 11 | $9,500.00 | $3,800.00 | $3,061.70 | $5,317.67 | $6,300.00 | $4,928.59 |
| 0108 | Casting, water valve, adjust to grade (720-94840) | EACH | 3 | $350.00 | $650.00 | $771.31 | $586.34 | $485.00 | $338.63 |
| 0109 | Manhole, type J4 (720-95422) | EACH | 2 | $10,000 | $5,250.00 | $4,100.59 | $7,385.20 | $8,600.00 | $6,300.48 |
| 0110 | Inlet, type B15 (720-98174) | EACH | 9 | $7,900.00 | $4,450.00 | $2,100.32 | $3,917.69 | $7,385.00 | $5,299.40 |
| 0111 | Inlet, type C15 (720-98555) | EACH | 4 | $7,900.00 | $4,650.00 | $2,111.90 | $4,164.33 | $7,000.00 | $5,299.40 |
| 0112 | Catch basin, type B15 (720-99416) | EACH | 3 | $7,900.00 | $4,650.00 | $2,409.93 | $3,917.69 | $5,670.00 | $5,075.53 |
| 0113 | Catch basin, type C15 (720-99417) | EACH | 8 | $7,900.00 | $4,450.00 | $2,398.34 | $4,164.99 | $5,710.00 | $5,075.54 |
| 0114 | Automatic drainage gate, diameter 24 in. (721-43020) | EACH | 1 | $9,000.00 | $47,500 | $38,369 | $6,322.28 | $43,000 | $42,401 |
| 0115 | Construction sign, type D (801-03291) | EACH | 4 | $314.00 | $400.00 | $314.00 | $314.00 | $314.00 | $172.21 |
| 0116 | Road closure sign assembly (801-04308) | EACH | 9 | $354.00 | $525.00 | $354.00 | $354.00 | $354.00 | $487.91 |
| 0117 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 1,200 | $1.68 | $2.50 | $1.68 | $1.68 | $1.68 | $2.58 |
| 0118 | Detour route marker assembly (801-06625) | EACH | 62 | $171.00 | $300.00 | $171.00 | $171.00 | $171.00 | $172.20 |
| 0119 | Construction sign, type A (801-06640) | EACH | 35 | $259.00 | $410.00 | $259.00 | $259.00 | $259.00 | $258.31 |
| 0120 | Construction sign, type B (801-06645) | EACH | 18 | $136.00 | $315.00 | $136.00 | $136.00 | $136.00 | $172.21 |
| 0121 | Flashing arrow sign (801-06710) | DAY | 180 | $16.00 | $31.00 | $16.00 | $16.00 | $16.00 | $28.70 |
| 0122 | Maintaining traffic (801-06775) | LS | 1 | $125,000 | $21,000 | $129,158 | $250,000 | $101,617 | $124,834 |
| 0123 | Barricade, type III-B (801-07119) | LFT | 252 | $16.11 | $33.00 | $16.11 | $16.11 | $16.11 | $25.83 |
| 0124 | Temporary traffic barrier, type 2 (801-08401) | LFT | 350 | $65.00 | $82.00 | $107.45 | $60.00 | $91.50 | $103.32 |
| 0125 | Temporary accessible pedestrian path (801-12641) | SYS | 33 | $50.00 | $200.00 | $127.76 | $150.00 | $164.00 | $106.16 |
| 0126 | Temporary pedestrian channelizer (801-12862) | LFT | 100 | $28.11 | $47.00 | $28.11 | $20.00 | $28.11 | $25.83 |
| 0127 | Sign, sheet, remove (802-04089) | EACH | 1 | $73.42 | $77.00 | $50.00 | $73.42 | $73.42 | $86.11 |
| 0128 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 432 | $36.20 | $38.00 | $40.00 | $36.20 | $36.20 | $24.11 |
| 0129 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 25 | $34.07 | $36.00 | $40.00 | $34.07 | $34.07 | $23.53 |
| 0130 | Sign, sheet, and supports, remove (802-07059) | EACH | 29 | $152.95 | $161.00 | $50.00 | $152.95 | $152.95 | $57.40 |
| 0131 | Sign, sheet, relocate (802-07060) | EACH | 40 | $91.77 | $97.00 | $50.00 | $91.77 | $91.77 | $114.80 |
| 0132 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 110 | $32.47 | $34.00 | $31.00 | $32.47 | $32.47 | $22.96 |
| 0133 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $229.43 | $300.00 | $75.00 | $229.43 | $229.43 | $172.21 |
| 0134 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 600 | $30.81 | $32.00 | $45.00 | $30.81 | $30.81 | $45.92 |
| 0135 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 3,300 | $1.11 | $1.15 | $3.00 | $1.11 | $1.11 | $0.86 |
| 0136 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 2,050 | $3.94 | $4.00 | $5.00 | $3.94 | $3.94 | $4.59 |
| 0137 | Signal detector housing (805-78785) | EACH | 7 | $1,561.23 | $1,600.00 | $3,000.00 | $1,561.23 | $1,561.23 | $2,870.08 |
| 0138 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 1,200 | $16.07 | $17.00 | $10.00 | $16.07 | $16.07 | $17.22 |
| 0139 | Loop detector delay amplifier, noncounting 2 channel (805-92504) | EACH | 4 | $732.25 | $740.00 | $500.00 | $732.25 | $732.25 | $430.51 |
| 0140 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 72 | $13.47 | $16.00 | $13.47 | $14.82 | $13.47 | $13.37 |
| 0141 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 3,549 | $0.71 | $1.05 | $0.71 | $0.78 | $0.71 | $1.00 |
| 0142 | Line, thermoplastic, solid, white, 8 in. (808-06705) | LFT | 77 | $1.37 | $3.15 | $1.37 | $1.51 | $1.37 | $4.47 |
| 0143 | Retro-reflectivity testing (808-09381) | LS | 1 | $2,500.00 | $515.00 | $2,500.00 | $2,750.00 | $2,500.00 | $4,018.12 |
| 0144 | Line, thermoplastic, dotted, white, 4 in. (808-11482) | LFT | 54 | $0.99 | $1.10 | $0.99 | $1.09 | $0.99 | $5.22 |
| 0145 | Grooving for pavement markings (808-12032) | LFT | 10,989 | $0.71 | $2.05 | $0.71 | $0.78 | $0.71 | $0.86 |
| 0146 | Line, thermoplastic, broken, yellow, 4 in. (808-75240) | LFT | 790 | $0.91 | $1.05 | $0.91 | $1.00 | $0.91 | $2.12 |
| 0147 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 6,160 | $0.71 | $1.05 | $0.71 | $0.78 | $0.71 | $1.09 |
| 0148 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 65 | $6.91 | $10.05 | $6.91 | $7.60 | $6.91 | $6.69 |
| 0149 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 301 | $13.47 | $15.50 | $13.47 | $14.82 | $13.47 | $13.37 |
| 0150 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 626 | $3.57 | $7.50 | $3.57 | $3.93 | $3.57 | $3.35 |
| 0151 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 25 | $214.00 | $185.00 | $214.00 | $235.40 | $214.00 | $289.30 |
| 0152 | Pavement message marking, thermoplastic, RXR (808-75340) | EACH | 2 | $1,187.00 | $1,010.00 | $1,187.00 | $1,305.70 | $1,187.00 | $1,260.54 |
| 0153 | Line, thermoplastic, solid, yellow, 8 in. (808-92027) | LFT | 359 | $1.37 | $3.05 | $1.37 | $1.51 | $1.37 | $4.47 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.