HRP Construction Inc: INDOT bid record

HRP Construction Inc submitted 17 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 07 OCT 2026, and was the low bidder on 5 of them (29%). When it was not low, its total sat a median +27% above the low bid.

Owner
Indiana DOT
Low bid volume
$32,018,699
Latest bid
07 OCT 2026
Data through
05 NOV 2026
17Bids
5Low bids
29Win rate, percent
+27%Median gap to the low bid when not low, 12 bids

By year

YearBidsLow bidsWin rate
2022500%
20232150%
20244250%
20253267%
2026300%
HRP Construction Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
LaPorte10110%
Fort Wayne7457%
HRP Construction Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL1616 (100%)$1.00$1.00
Contract liens109-08360DOL1616 (100%)$1.00$1.00
Stormwater management budget205-12108DOL1616 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL1616 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL1515 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL1515 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL1515 (100%)$1.00$1.00
Detour route marker assembly801-06625EACH1511 (73%)$169.00$140.00
Mobilization and demobilization for seeding621-01004EACH1310 (77%)$475.00$525.00
PCCP for approaches, 6 in.610-08446SYS1110 (91%)$81.25$102.00
Road closure sign assembly801-04308EACH139 (69%)$325.00$280.00
Milling, asphalt, 1 1/2 in.306-08034SYS138 (62%)$12.90$10.00
HRP Construction Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Rieth-Riley Construction Co., Inc.137 of 13
Milestone Contractors LP64 of 6
C & E Excavating Inc51 of 5
Milestone Contractors North Inc22 of 2
Phend & Brown Inc21 of 2
L G S Plumbing Inc11 of 1
Grimmer Construction Inc11 of 1
Temple & Temple Excavating & Paving Inc11 of 1
F H Paschen S N Nielsen & Associates LLC11 of 1
Selge Construction Co Inc11 of 1
HRP Construction Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 OCT 2026R-44658-ALaPorteSMALL STRUCTURE REPLACEMENT6 of 6$1,723,209+92%
08 APR 2026R-41176-ALaPorteROAD RECONSTRUCTION4 of 4$7,988,000+64%
11 MAR 2026R-44113-ALaPorteINTERSECTION IMPROVEMENT, ROUNDABOUT4 of 4$4,018,000+23%
10 DEC 2025R-42000-AFort WayneAUXILIARY LANES, BRIDGE REPLACEMENT AND MULTI-USE PATH1 of 4$8,889,306Low, 4.0% under the second
08 OCT 2025R-41153-AFort WayneADDED TRAVEL LANES1 of 6$4,086,093Low, 2.0% under the second
09 APR 2025R-43893-ALaPorteSMALL STRUCTURE REPLACEMENT AND PIPE LINING3 of 4$2,251,125+30%
11 DEC 2024R-41190-ALaPorteROAD RECONSTRUCTION1 of 2$8,828,860Low, 21% under the second
11 DEC 2024R-41395-AFort WayneAUXILIARY LANES, TWO-WAY LEFT TURN LANES2 of 4$13,637,661+21%
14 AUG 2024R-43382-ALaPortePAVEMENT REPLACEMENT AND UTILITY RELOCATION3 of 4$37,897,186+10%
09 MAY 2024B-43617-BFort WayneBRIDGE REPLACEMENT1 of 1$3,994,440Low
15 MAR 2023R-41150-BFort WayneROAD REHABILITATION2 of 2$7,470,555+3.0%
10 FEB 2023R-41148-BFort WaynePAVEMENT REPLACEMENT1 of 2$6,220,000Low, 33% under the second
07 DEC 2022R-41436-ALaPorteSMALL STRUCTURE, NEW AND PIPE LINING2 of 2$2,713,900+40%
14 SEP 2022R-40735-ALaPorteROAD RECONSTRUCTION2 of 4$2,834,500+11%
15 JUN 2022R-40604-ALaPorteSMALL STRUCTURE REPLACEMENT4 of 4$9,192,274+67%
05 MAY 2022R-37647-BFort WayneROAD RECONSTRUCTION2 of 2$7,083,117+2.0%
12 JAN 2022R-41173-ALaPorteINTERSECTION IMPROVEMENT3 of 3$762,121+75%
HRP Construction Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy