HRP Construction Inc: INDOT bid record
HRP Construction Inc submitted 17 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 07 OCT 2026, and was the low bidder on 5 of them (29%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $32,018,699
- Latest bid
- 07 OCT 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 5 | 0 | 0% |
| 2023 | 2 | 1 | 50% |
| 2024 | 4 | 2 | 50% |
| 2025 | 3 | 2 | 67% |
| 2026 | 3 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| LaPorte | 10 | 1 | 10% |
| Fort Wayne | 7 | 4 | 57% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Detour route marker assembly | 801-06625 | EACH | 15 | 11 (73%) | $169.00 | $140.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 13 | 10 (77%) | $475.00 | $525.00 |
| PCCP for approaches, 6 in. | 610-08446 | SYS | 11 | 10 (91%) | $81.25 | $102.00 |
| Road closure sign assembly | 801-04308 | EACH | 13 | 9 (69%) | $325.00 | $280.00 |
| Milling, asphalt, 1 1/2 in. | 306-08034 | SYS | 13 | 8 (62%) | $12.90 | $10.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rieth-Riley Construction Co., Inc. | 13 | 7 of 13 |
| Milestone Contractors LP | 6 | 4 of 6 |
| C & E Excavating Inc | 5 | 1 of 5 |
| Milestone Contractors North Inc | 2 | 2 of 2 |
| Phend & Brown Inc | 2 | 1 of 2 |
| L G S Plumbing Inc | 1 | 1 of 1 |
| Grimmer Construction Inc | 1 | 1 of 1 |
| Temple & Temple Excavating & Paving Inc | 1 | 1 of 1 |
| F H Paschen S N Nielsen & Associates LLC | 1 | 1 of 1 |
| Selge Construction Co Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 07 OCT 2026 | R-44658-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 6 of 6 | $1,723,209 | +92% |
| 08 APR 2026 | R-41176-A | LaPorte | ROAD RECONSTRUCTION | 4 of 4 | $7,988,000 | +64% |
| 11 MAR 2026 | R-44113-A | LaPorte | INTERSECTION IMPROVEMENT, ROUNDABOUT | 4 of 4 | $4,018,000 | +23% |
| 10 DEC 2025 | R-42000-A | Fort Wayne | AUXILIARY LANES, BRIDGE REPLACEMENT AND MULTI-USE PATH | 1 of 4 | $8,889,306 | Low, 4.0% under the second |
| 08 OCT 2025 | R-41153-A | Fort Wayne | ADDED TRAVEL LANES | 1 of 6 | $4,086,093 | Low, 2.0% under the second |
| 09 APR 2025 | R-43893-A | LaPorte | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 3 of 4 | $2,251,125 | +30% |
| 11 DEC 2024 | R-41190-A | LaPorte | ROAD RECONSTRUCTION | 1 of 2 | $8,828,860 | Low, 21% under the second |
| 11 DEC 2024 | R-41395-A | Fort Wayne | AUXILIARY LANES, TWO-WAY LEFT TURN LANES | 2 of 4 | $13,637,661 | +21% |
| 14 AUG 2024 | R-43382-A | LaPorte | PAVEMENT REPLACEMENT AND UTILITY RELOCATION | 3 of 4 | $37,897,186 | +10% |
| 09 MAY 2024 | B-43617-B | Fort Wayne | BRIDGE REPLACEMENT | 1 of 1 | $3,994,440 | Low |
| 15 MAR 2023 | R-41150-B | Fort Wayne | ROAD REHABILITATION | 2 of 2 | $7,470,555 | +3.0% |
| 10 FEB 2023 | R-41148-B | Fort Wayne | PAVEMENT REPLACEMENT | 1 of 2 | $6,220,000 | Low, 33% under the second |
| 07 DEC 2022 | R-41436-A | LaPorte | SMALL STRUCTURE, NEW AND PIPE LINING | 2 of 2 | $2,713,900 | +40% |
| 14 SEP 2022 | R-40735-A | LaPorte | ROAD RECONSTRUCTION | 2 of 4 | $2,834,500 | +11% |
| 15 JUN 2022 | R-40604-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 4 of 4 | $9,192,274 | +67% |
| 05 MAY 2022 | R-37647-B | Fort Wayne | ROAD RECONSTRUCTION | 2 of 2 | $7,083,117 | +2.0% |
| 12 JAN 2022 | R-41173-A | LaPorte | INTERSECTION IMPROVEMENT | 3 of 3 | $762,121 | +75% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.