INDOT contract R-44113-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on March 11, 2026, St. Joseph, LaPorte. 4 bids received; low bid $3,253,613 by Rieth-Riley Construction Co., Inc..
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 117
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rieth-Riley Construction Co., Inc. | $3,253,613 | Low |
| 2 | C & E Excavating Inc | $3,342,938 | +3.0% |
| 3 | Milestone Contractors LP | $3,500,000 | +8.0% |
| 4 | HRP Construction Inc | $4,018,000 | +23% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rieth-Riley Construction Co., Inc. | 2. C & E Excavating Inc | 3. Milestone Contractors LP | 4. HRP Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $50,013 | $79,538 | $63,440 | $100,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $135,034 | $104,717 | $86,532 | $401,090 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $47,405 | $197,600 | $100,000 | $115,000 |
| 0012 | Sign, remove (202-74035) | EACH | 15 | $103.44 | $66.00 | $100.00 | $65.00 |
| 0013 | Inlet, remove (202-91385) | EACH | 2 | $2,605.09 | $450.00 | $1,200.00 | $750.00 |
| 0014 | Pipe, remove (202-96133) | LFT | 138 | $56.63 | $12.00 | $26.00 | $25.00 |
| 0015 | Pipe end section, remove (202-98488) | EACH | 1 | $571.02 | $350.00 | $600.00 | $500.00 |
| 0016 | Excavation, common (203-02000) | CYS | 10,310 | $28.73 | $18.00 | $32.10 | $31.00 |
| 0017 | Borrow (203-02070) | CYS | 2,015 | $51.95 | $30.25 | $42.80 | $20.00 |
| 0018 | Stormwater management budget (205-12108) | DOL | 32,975 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0019 | Stormwater management implementation (205-12616) | LS | 1 | $2,100.00 | $31,975 | $16,900 | $85,000 |
| 0020 | SWQCP preparation (205-12618) | LS | 1 | $32,500 | $3,850.00 | $3,600.00 | $7,500.00 |
| 0021 | Subgrade treatment, type II (207-08264) | SYS | 2,927 | $25.57 | $21.25 | $27.90 | $25.00 |
| 0022 | Subgrade treatment, type IC (207-09935) | SYS | 8,661 | $44.09 | $29.70 | $42.20 | $40.00 |
| 0023 | Structure backfill, type 1 (211-09264) | CYS | 953 | $39.31 | $18.00 | $62.20 | $50.00 |
| 0024 | Geogrid, type IB (214-11796) | SYS | 8,786 | $1.40 | $3.15 | $2.40 | $3.00 |
| 0025 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,898 | $100.16 | $103.75 | $120.20 | $125.00 |
| 0026 | Dense graded subbase (302-07455) | CYS | 49 | $120.17 | $144.50 | $214.80 | $250.00 |
| 0027 | Compacted aggregate, no. 53 (303-01180) | TON | 698 | $58.19 | $48.00 | $59.90 | $30.00 |
| 0028 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 2,504 | $4.26 | $4.50 | $4.20 | $5.00 |
| 0029 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 820 | $108.69 | $110.00 | $129.00 | $108.69 |
| 0030 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 1,075 | $94.89 | $96.00 | $113.60 | $94.89 |
| 0031 | QC/QA-HMA, 2, 58S, base, 19.0 MM (401-000052) | TON | 1,730 | $84.94 | $86.00 | $108.60 | $84.94 |
| 0032 | Joint adhesive (401-11526) | LFT | 2,715 | $0.73 | $0.75 | $0.80 | $0.73 |
| 0033 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 2,715 | $6.80 | $6.00 | $6.80 | $15.00 |
| 0034 | Asphalt for tack coat (406-05520) | TON | 6 | $678.63 | $700.00 | $900.00 | $678.63 |
| 0035 | PCCP, 9 in. , colored (502-06457) | SYS | 717 | $94.12 | $143.00 | $127.70 | $94.12 |
| 0036 | PCCP, 9 in. , decorative (502-06457) | SYS | 363 | $142.67 | $151.00 | $189.10 | $142.67 |
| 0037 | D-1 contraction joint (503-05240) | LFT | 282 | $13.15 | $57.00 | $44.40 | $13.15 |
| 0038 | Fence gate, chain link, 72 in. X 24 FT (603-11002) | EACH | 1 | $5,250.00 | $5,300.00 | $5,250.00 | $5,250.00 |
| 0039 | Fence, chain link, 72 in. (603-92636) | LFT | 775 | $42.00 | $45.00 | $42.00 | $42.00 |
| 0040 | Sidewalk, concrete (604-06070) | SYS | 6 | $285.96 | $350.00 | $164.90 | $285.96 |
| 0041 | Curb, concrete (605-06120) | LFT | 235 | $36.79 | $48.00 | $31.70 | $36.79 |
| 0042 | Curb and gutter, concrete (605-06140) | LFT | 2,429 | $33.05 | $41.75 | $43.10 | $33.05 |
| 0043 | Curb and gutter, concrete , modified (605-06140) | LFT | 1,376 | $33.05 | $38.00 | $55.80 | $33.05 |
| 0044 | Curb and gutter, concrete, type B (605-06145) | LFT | 391 | $38.10 | $42.50 | $39.20 | $38.10 |
| 0045 | Curb and gutter, concrete, type B , modified (605-06145) | LFT | 315 | $38.10 | $46.00 | $42.10 | $38.10 |
| 0046 | Center curb, concrete, type D (605-06255) | SYS | 20 | $264.90 | $455.00 | $486.00 | $264.90 |
| 0047 | HMA for approaches, type B (610-07487) | TON | 13 | $309.75 | $327.00 | $482.00 | $309.75 |
| 0048 | PCCP for approaches, 6 in. (610-08446) | SYS | 167 | $87.94 | $137.00 | $90.70 | $87.94 |
| 0049 | PCCP for approaches, 9 in. (610-09108) | SYS | 125 | $96.73 | $176.00 | $110.90 | $96.73 |
| 0050 | Monument, type B (615-06505) | EACH | 18 | $1,100.00 | $1,150.00 | $1,100.00 | $1,100.00 |
| 0051 | Monument, type C (615-06510) | EACH | 1 | $750.00 | $775.00 | $750.00 | $750.00 |
| 0052 | Monument, type D (615-06515) | EACH | 15 | $275.00 | $290.00 | $275.00 | $275.00 |
| 0053 | Riprap, revetment (616-06405) | TON | 22 | $388.33 | $345.00 | $200.00 | $226.00 |
| 0054 | Geotextile for riprap, type 1A (616-12246) | SYS | 55 | $9.97 | $9.50 | $11.50 | $10.00 |
| 0055 | Slopewall, concrete, 4 in. , colored (616-51367) | SYS | 120 | $82.39 | $166.00 | $120.00 | $82.39 |
| 0056 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $475.00 | $500.00 | $475.00 | $475.00 |
| 0057 | Mulched seeding, type R (621-06559) | SYS | 9,501 | $0.85 | $0.85 | $0.85 | $3.00 |
| 0058 | Water (621-06567) | KGAL | 13 | $10.00 | $10.25 | $10.00 | $10.00 |
| 0059 | Sodding, nursery (621-06575) | SYS | 3,225 | $11.85 | $10.00 | $11.85 | $11.85 |
| 0060 | Mulch (621-08538) | CYS | 31 | $128.00 | $135.00 | $128.00 | $128.00 |
| 0061 | Plant, coniferous evergreen, cone, broad upright, 48 in. to 72 in. (622-05625) | EACH | 8 | $450.00 | $475.00 | $450.00 | $450.00 |
| 0062 | Plant, coniferous evergreen, prostrate broad spreading, semispreading, over 18 in. to 24 in. (622-05634) | EACH | 50 | $85.00 | $87.00 | $85.00 | $85.00 |
| 0063 | Plant, deciduous shrub, 18 in. to 24 in. (622-05639) | EACH | 42 | $75.00 | $80.00 | $75.00 | $75.00 |
| 0064 | Plant, perennial (622-05654) | EACH | 221 | $25.00 | $26.50 | $25.00 | $25.00 |
| 0065 | Field office, type C (628-09403) | MOS | 24 | $1,787.00 | $3,550.00 | $3,000.00 | $5,000.00 |
| 0066 | Topsoil processing and distribution (629-000149) | SYS | 12,726 | $6.35 | $19.00 | $9.50 | $14.25 |
| 0067 | Topsoil amendment budget (629-000150) | DOL | 25,452 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0068 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 893 | $65.14 | $75.00 | $68.70 | $75.00 |
| 0069 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 602 | $77.90 | $82.00 | $71.70 | $85.00 |
| 0070 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 1,969 | $116.66 | $94.50 | $90.00 | $124.00 |
| 0071 | Video inspection for pipe (715-09064) | LFT | 3,464 | $1.25 | $1.35 | $1.25 | $1.50 |
| 0073 | Pipe end section, diameter 24 in. (715-46020) | EACH | 4 | $1,516.55 | $2,500.00 | $2,060.00 | $5,000.00 |
| 0074 | Manhole, type J10 , modified (720-02367) | EACH | 2 | $8,754.19 | $5,700.00 | $7,870.00 | $12,000 |
| 0075 | Inlet, type J10 (720-45045) | EACH | 9 | $4,829.36 | $3,650.00 | $4,130.00 | $8,000.00 |
| 0076 | Inlet, type M10 (720-45055) | EACH | 10 | $4,795.95 | $3,450.00 | $4,020.00 | $7,500.00 |
| 0077 | Manhole, type C4 (720-45410) | EACH | 7 | $6,920.75 | $3,750.00 | $5,830.00 | $7,500.00 |
| 0078 | Manhole, type C2 (720-90984) | EACH | 2 | $6,664.26 | $4,150.00 | $6,190.00 | $7,500.00 |
| 0079 | Inlet, type B15 (720-98174) | EACH | 2 | $5,431.78 | $3,900.00 | $5,210.00 | $9,000.00 |
| 0080 | Inlet, type C15 (720-98555) | EACH | 6 | $5,431.77 | $4,150.00 | $5,210.00 | $9,000.00 |
| 0081 | Road closure sign assembly (801-04308) | EACH | 9 | $261.00 | $345.00 | $261.00 | $261.00 |
| 0082 | Detour route marker assembly (801-06625) | EACH | 47 | $152.00 | $190.00 | $152.00 | $152.00 |
| 0083 | Construction sign, type A (801-06640) | EACH | 17 | $218.00 | $370.00 | $218.00 | $218.00 |
| 0084 | Maintaining traffic (801-06775) | LS | 1 | $2,000.00 | $7,000.00 | $10,000 | $25,000 |
| 0085 | Barricade, type III-A (801-07118) | LFT | 96 | $15.88 | $23.00 | $15.88 | $15.88 |
| 0086 | Barricade, type III-B (801-07119) | LFT | 60 | $15.88 | $23.00 | $15.88 | $15.88 |
| 0087 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 190 | $33.50 | $36.00 | $34.20 | $34.20 |
| 0088 | Sign post, square, type 2, unreinforced anchor base (802-05705) | LFT | 56 | $31.82 | $33.00 | $31.20 | $31.20 |
| 0089 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 45 | $31.56 | $38.00 | $36.00 | $36.00 |
| 0090 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 77 | $32.73 | $38.00 | $37.00 | $37.00 |
| 0091 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 39 | $35.88 | $39.00 | $38.00 | $38.00 |
| 0092 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 510 | $14.74 | $26.00 | $25.00 | $25.00 |
| 0093 | Handhole, lighting (807-02191) | EACH | 6 | $2,548.39 | $2,300.00 | $2,225.00 | $2,225.00 |
| 0094 | Wire, no. 2 copper, 3 1/C (807-02618) | LFT | 100 | $10.09 | $4.25 | $4.00 | $4.00 |
| 0095 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,540 | $18.50 | $16.50 | $16.00 | $16.00 |
| 0096 | Luminaire, high lumen roadway (807-12199) | EACH | 13 | $586.42 | $335.00 | $320.00 | $32.00 |
| 0097 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 13 | $2,041.10 | $1,650.00 | $1,610.00 | $1,610.00 |
| 0098 | Light pole, 40 FT E.M.H., 15 FT mast arm, breakaway base (807-85762) | EACH | 13 | $4,412.19 | $3,900.00 | $3,898.00 | $3,898.00 |
| 0099 | Service point, type II (807-86810) | EACH | 1 | $9,521.24 | $7,000.00 | $6,700.00 | $6,700.00 |
| 0100 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 2,460 | $1.75 | $2.65 | $2.50 | $2.50 |
| 0101 | Connector kit, unfused (807-86910) | EACH | 13 | $49.00 | $48.00 | $46.00 | $46.00 |
| 0102 | Connector kit, fused (807-86915) | EACH | 13 | $49.00 | $48.00 | $46.00 | $46.00 |
| 0103 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 18 | $35.53 | $30.00 | $29.00 | $29.00 |
| 0104 | Multiple compression fitting, waterproofed (807-86925) | EACH | 40 | $45.63 | $37.00 | $35.00 | $35.00 |
| 0105 | Insulation link, non- waterproofed (807-86930) | EACH | 33 | $25.99 | $27.00 | $26.00 | $26.00 |
| 0106 | Insulation link, waterproofed (807-86935) | EACH | 48 | $34.97 | $35.00 | $34.00 | $34.00 |
| 0107 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 13 | $142.50 | $56.00 | $55.00 | $55.00 |
| 0108 | Cable-duct marker (807-86955) | EACH | 36 | $281.44 | $155.00 | $151.00 | $151.00 |
| 0109 | Wire, no. 4 copper, in plastic duct, 4 1/C (807-97237) | LFT | 580 | $18.24 | $17.00 | $16.00 | $16.00 |
| 0110 | Line, multi-component, dotted, white, 8 in. (808-10032) | LFT | 78 | $2.91 | $5.50 | $2.91 | $2.91 |
| 0111 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 644 | $0.92 | $3.50 | $0.92 | $0.92 |
| 0112 | Line, multi-component, solid, yellow, 8 in. (808-10058) | LFT | 1,044 | $1.79 | $4.50 | $1.79 | $1.79 |
| 0113 | Transverse marking, multi-component, yield line, white, 24 in. (808-11776) | LFT | 72 | $22.81 | $15.50 | $22.81 | $22.81 |
| 0114 | Grooving for pavement markings (808-12032) | LFT | 5,398 | $0.79 | $3.50 | $0.79 | $0.79 |
| 0115 | Mailbox assembly, single (611-06497) | EACH | 4 | $425.00 | $430.00 | $425.00 | $425.00 |
| 0116 | Right-of-way marker (615-06490) | EACH | 39 | $250.00 | $260.00 | $250.00 | $250.00 |
| 0117 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 3,320 | $0.92 | $3.50 | $0.92 | $0.92 |
| 0118 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 390 | $1.44 | $5.50 | $1.44 | $1.44 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way