Phend & Brown Inc: INDOT bid record

Phend & Brown Inc submitted 68 bids on Indiana DOT contracts in the data, from 09 FEB 2022 to 05 AUG 2026, and was the low bidder on 16 of them (24%). When it was not low, its total sat a median +16% above the low bid.

Owner
Indiana DOT
Low bid volume
$75,991,867
Latest bid
05 AUG 2026
Data through
05 NOV 2026
68Bids
16Low bids
24Win rate, percent
+16%Median gap to the low bid when not low, 52 bids

By year

YearBidsLow bidsWin rate
202210330%
202313431%
202417424%
202518422%
202610110%
Phend & Brown Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Fort Wayne591322%
LaPorte9333%
Phend & Brown Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL6666 (100%)$1.00$1.00
Contract liens109-08360DOL6666 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL6666 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL6060 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL5656 (100%)$1.00$1.00
Stormwater management budget205-12108DOL4949 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL4949 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL4949 (100%)$1.00$1.00
Mobilization and demobilization for seeding621-01004EACH4032 (80%)$462.50$525.00
Quality adjustments, pavement traffic markings109-09377DOL3131 (100%)$1.00$1.00
Road closure sign assembly801-04308EACH4127 (66%)$309.00$280.00
Construction sign, type A801-06640EACH4926 (53%)$204.00$200.00
Phend & Brown Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
E & B Paving LLC4232 of 42
Brooks Construction Company Inc4027 of 40
Milestone Contractors LP209 of 20
Morphey Construction Inc.129 of 12
Gradex Inc97 of 9
3D Company Inc54 of 5
Pioneer Associates Inc55 of 5
Bunn Excavating Inc42 of 4
C & E Excavating Inc32 of 3
Fleming Excavating Inc33 of 3
Phend & Brown Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 AUG 2026R-42382-AFort WayneHMA OVERLAY, STRUCTURAL2 of 3$12,945,550+1.0%
05 AUG 2026R-43626-AFort WayneADA SIDEWALK RAMP CONSTRUCTION5 of 6$3,045,650+31%
05 AUG 2026B-44526-AFort WayneBRIDGE REPLACEMENT AND INTERSECTION IMPROVEMENT2 of 2$4,566,003+13%
08 JUL 2026R-46493-AFort WayneSMALL STRUCTURES AND DRAINS CONSTRUCTION3 of 5$525,801+17%
08 JUL 2026R-46536-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE3 of 3$799,805+24%
08 APR 2026R-46513-ALaPorteINTERSECTION IMPROVEMENT3 of 3$855,234+14%
11 MAR 2026B-42777-AFort WayneBRIDGE REPLACEMENT4 of 4$4,801,317+31%
11 FEB 2026R-42006-AFort WayneNEW ROAD CONSTRUCTION2 of 3$10,599,740+6.0%
11 FEB 2026R-45756-AFort WaynePAVEMENT PATCHING1 of 3$373,429Low, 5.0% under the second
14 JAN 2026R-43844-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE AND PIPE LINING2 of 2$2,676,569+10%
10 DEC 2025R-42770-AFort WayneSIGHT DISTANCE IMPROVEMENT7 of 7$1,419,027+47%
10 DEC 2025R-43820-AFort WayneHMA OVERLAY, SMALL STRUCTURE REPLACE AND BRIDGE DECK OVERLAY1 of 2$9,732,590Low, 18% under the second
13 NOV 2025R-44771-AFort WayneADA SIDEWALK RAMP CONSTRUCTION1 of 4$368,535Low, 5.0% under the second
08 OCT 2025R-41153-AFort WayneADDED TRAVEL LANES4 of 6$4,428,357+8.0%
08 OCT 2025R-43804-AFort WayneHMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE PIPE LINING2 of 4$11,583,416+11%
08 OCT 2025R-43808-AFort WayneHMA OVERLAY MINOR STRUCTURAL AND SMALL STRUCTURE REPLACEMENT1 of 2$1,121,882Low, 3.0% under the second
09 JUL 2025R-43185-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE2 of 4$1,961,9890.0%
09 JUL 2025R-43285-AFort WayneHMA OVERLAY, INTERSECTION IMPROVE AND SMALL STR REPLACEMENT3 of 4$12,325,349+12%
09 JUL 2025R-43310-AFort WayneHMA OVERLAY, BRIDGE DECK OVERLAY AND SIDEWALK CONSTRUCTION2 of 4$6,208,6520.0%
09 JUL 2025R-43612-AFort WaynePAVEMENT REHABILITATION3 of 3$3,998,850+22%
09 JUL 2025R-43802-AFort WayneHMA OVERLAY, PREVENTIVE MAINTENANCE AND PIPE LINER3 of 3$5,156,200+27%
09 JUL 2025R-45486-AFort WaynePAVEMENT PATCHING2 of 2$714,336+2.0%
14 MAY 2025R-41079-AFort WayneNEW INTERCHANGE, BRIDGE AND SIDEWALK CONSTRUCTION5 of 6$55,490,236+9.0%
12 FEB 2025R-43256-AFort WayneINTERSECTION IMPROVEMENT, ADDED TURN LANES, SMALL STRUCTURE4 of 5$4,975,719+9.0%
12 FEB 2025R-45431-AFort WaynePAVEMENT PATCHING1 of 3$1,036,195Low, 3.0% under the second
Phend & Brown Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy