INDOT contract R-43626-A bid tabulation
ADA SIDEWALK RAMP CONSTRUCTION. Let by Indiana DOT on August 5, 2026, Whitley, Fort Wayne. 6 bids received; low bid $2,327,012 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 05 AUG 2026
- Pay items
- 40
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,327,012 | Low |
| 2 | Calumet Civil Contractors Inc | $2,672,000 | +15% |
| 3 | Brooks Construction Company Inc | $2,862,894 | +23% |
| 4 | E & B Paving LLC | $2,970,182 | +28% |
| 5 | Phend & Brown Inc | $3,045,650 | +31% |
| 6 | Morphey Construction Inc. | $4,165,165 | +79% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Calumet Civil Contractors Inc | 3. Brooks Construction Company Inc | 4. E & B Paving LLC | 5. Phend & Brown Inc | 6. Morphey Construction Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $35,500 | $60,000 | $143,000 | $71,000 | $95,000 | $81,200 |
| 0002 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 5 | $744.50 | $200.00 | $1,000.00 | $561.84 | $500.00 | $525.59 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $116,351 | $116,514 | $143,144 | $148,508 | $120,000 | $205,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $23,270 | $20,000 | $42,750 | $8,500.00 | $50,000 | $30,000 |
| 0011 | Curb and gutter, remove (202-02279) | LFT | 532 | $15.50 | $30.00 | $18.00 | $49.00 | $33.00 | $25.00 |
| 0012 | Sidewalk concrete, remove (202-52710) | SYS | 8,349 | $17.00 | $14.50 | $11.00 | $40.00 | $21.00 | $34.00 |
| 0013 | Stormwater management budget (205-12108) | DOL | 57,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0014 | Stormwater management implementation (205-12616) | LS | 1 | $2,275.00 | $45,000 | $2,500.00 | $4,590.19 | $6,500.00 | $4,500.00 |
| 0015 | SWQCP preparation (205-12618) | LS | 1 | $2,425.00 | $4,500.00 | $4,200.00 | $3,000.00 | $4,200.00 | $6,000.00 |
| 0016 | Subgrade treatment, type II (207-08264) | SYS | 6,033 | $15.25 | $22.00 | $20.00 | $50.00 | $39.00 | $33.00 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 418 | $37.25 | $39.00 | $43.00 | $35.00 | $54.00 | $65.00 |
| 0018 | Dense graded subbase (302-07455) | CYS | 1,006 | $100.00 | $120.00 | $92.00 | $185.00 | $124.00 | $155.00 |
| 0019 | Widening with HMA, type B (304-07493) | TON | 51 | $425.00 | $620.00 | $492.00 | $185.00 | $500.00 | $830.00 |
| 0020 | Sidewalk, concrete (604-06070) | SYS | 8,617 | $82.00 | $68.00 | $94.50 | $59.90 | $92.00 | $125.00 |
| 0021 | Curb ramp, concrete (604-08086) | SYS | 422 | $170.50 | $240.00 | $196.00 | $200.00 | $280.00 | $350.00 |
| 0022 | Detectable warning surfaces (604-12083) | SYS | 60 | $345.75 | $300.00 | $188.00 | $200.00 | $260.00 | $188.00 |
| 0023 | Curb and gutter, rolled curb (605-97937) | LFT | 522 | $51.50 | $60.00 | $86.00 | $65.00 | $68.00 | $100.00 |
| 0024 | PCCP for approaches, 6 in. (610-08446) | SYS | 6,033 | $103.00 | $145.00 | $115.00 | $140.00 | $130.00 | $170.00 |
| 0025 | Water (621-06567) | KGAL | 36 | $10.00 | $10.00 | $10.00 | $100.00 | $10.00 | $10.00 |
| 0026 | Topsoil (621-06570) | CYS | 751 | $73.25 | $110.00 | $65.00 | $115.00 | $24.00 | $120.00 |
| 0027 | Sodding, nursery (621-06575) | SYS | 8,966 | $11.50 | $12.00 | $6.85 | $12.50 | $14.00 | $30.00 |
| 0028 | Field office, type A (628-09401) | MOS | 10 | $2,000.00 | $3,500.00 | $3,000.00 | $3,000.00 | $3,000.00 | $2,200.00 |
| 0029 | Computer system equipment (628-11976) | EACH | 1 | $750.00 | $1,600.00 | $600.00 | $600.00 | $600.00 | $1,500.00 |
| 0030 | Computer system (628-11977) | EACH | 1 | $2,500.00 | $1,600.00 | $3,250.00 | $3,250.00 | $3,250.00 | $2,000.00 |
| 0031 | Casting, manhole, adjust to grade (720-12798) | EACH | 1 | $975.00 | $1,000.00 | $550.00 | $787.20 | $650.00 | $1,000.00 |
| 0032 | Casting, water valve, adjust to grade (720-94840) | EACH | 11 | $300.00 | $500.00 | $150.00 | $402.12 | $500.00 | $1,000.00 |
| 0033 | Construction sign, type C (801-03290) | EACH | 2 | $437.25 | $390.00 | $250.00 | $250.00 | $258.00 | $258.00 |
| 0034 | Construction sign, type D (801-03291) | EACH | 4 | $291.50 | $195.00 | $150.00 | $150.00 | $281.00 | $281.00 |
| 0035 | Construction sign, type A (801-06640) | EACH | 6 | $437.25 | $215.00 | $250.00 | $250.00 | $224.00 | $224.00 |
| 0036 | Construction sign, type B (801-06645) | EACH | 17 | $291.50 | $125.00 | $150.00 | $150.00 | $112.00 | $112.00 |
| 0037 | Maintaining traffic (801-06775) | LS | 1 | $44,122 | $38,969 | $263,588 | $13,070 | $125,000 | $202,233 |
| 0038 | Temporary curb ramp (801-11990) | EACH | 48 | $131.75 | $300.00 | $275.00 | $604.01 | $600.00 | $2,000.00 |
| 0039 | Temporary accessible pedestrian path (801-12641) | SYS | 205 | $31.00 | $75.00 | $101.00 | $59.34 | $50.00 | $110.00 |
| 0040 | Temporary pedestrian channelizer (801-12862) | LFT | 515 | $12.50 | $18.00 | $22.00 | $22.00 | $20.00 | $40.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 5, 2026. Compiled by Mirage Metrics.