Bunn Excavating Inc: INDOT bid record
Bunn Excavating Inc submitted 13 bids on Indiana DOT contracts in the data, from 15 MAR 2023 to 08 OCT 2025, and was the low bidder on 4 of them (31%). When it was not low, its total sat a median +32% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $7,820,411
- Latest bid
- 08 OCT 2025
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 2 | 2 | 100% |
| 2025 | 11 | 2 | 18% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Fort Wayne | 9 | 3 | 33% |
| Greenfield | 3 | 1 | 33% |
| LaPorte | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 12 | 12 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 6 | 6 (100%) | $1.00 | $1.00 |
| Compacted aggregate, no. 53 | 303-01180 | TON | 9 | 5 (56%) | $36.91 | $62.00 |
| Riprap, uniform | 616-06451 | TON | 6 | 4 (67%) | $67.69 | $100.00 |
| Joint adhesive, intermediate | 401-10259 | LFT | 8 | 3 (38%) | $0.46 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brooks Construction Company Inc | 8 | 5 of 8 |
| Morphey Construction Inc. | 8 | 5 of 8 |
| E & B Paving LLC | 5 | 4 of 5 |
| 3D Company Inc | 4 | 1 of 4 |
| Phend & Brown Inc | 4 | 2 of 4 |
| Gradex Inc | 3 | 3 of 3 |
| Pioneer Associates Inc | 2 | 2 of 2 |
| Midwest Paving LLC | 2 | 2 of 2 |
| Calumet Civil Contractors Inc | 2 | 2 of 2 |
| Yarberry Companies Inc | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 OCT 2025 | R-41153-A | Fort Wayne | ADDED TRAVEL LANES | 6 of 6 | $5,384,188 | +32% |
| 08 OCT 2025 | R-46140-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR | 6 of 6 | $448,955 | +32% |
| 10 SEP 2025 | B-42265-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 7 of 11 | $366,437 | +40% |
| 06 AUG 2025 | R-43792-A | Fort Wayne | SMALL STRUCTURES, DRAINS CONSTRUCTION AND PIPE LINING | 2 of 4 | $2,710,610 | +7.0% |
| 09 JUL 2025 | R-43285-A | Fort Wayne | HMA OVERLAY, INTERSECTION IMPROVE AND SMALL STR REPLACEMENT | 4 of 4 | $12,713,885 | +15% |
| 09 JUL 2025 | R-45574-A | LaPorte | SMALL STRUCTURE REPLACEMENT | 2 of 3 | $757,776 | +5.0% |
| 12 FEB 2025 | R-41054-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 8 of 8 | $2,621,634 | +32% |
| 12 FEB 2025 | R-43256-A | Fort Wayne | INTERSECTION IMPROVEMENT, ADDED TURN LANES, SMALL STRUCTURE | 1 of 5 | $4,553,910 | Low, 1.0% under the second |
| 12 FEB 2025 | R-43273-A | Fort Wayne | INTERSECTION IMPROVEMENT | 1 of 3 | $1,918,581 | Low, 6.0% under the second |
| 15 JAN 2025 | R-43315-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 3 of 4 | $3,794,578 | +31% |
| 15 JAN 2025 | R-43321-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 4 of 4 | $5,795,001 | +79% |
| 15 MAR 2023 | R-43509-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 1 of 2 | $712,546 | Low, 13% under the second |
| 15 MAR 2023 | R-44783-A | Greenfield | DEMOLITION, REMOVE BUILDINGS, FOUNDATIONS | 1 of 6 | $635,374 | Low, 4.0% under the second |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.