Gradex Inc: INDOT bid record
Gradex Inc submitted 38 bids on Indiana DOT contracts in the data, from 09 MAR 2022 to 08 APR 2026, and was the low bidder on 14 of them (37%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $153,889,584
- Latest bid
- 08 APR 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 0 | 0% |
| 2023 | 7 | 4 | 57% |
| 2024 | 20 | 8 | 40% |
| 2025 | 7 | 2 | 29% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Greenfield | 17 | 5 | 29% |
| Fort Wayne | 11 | 6 | 55% |
| Crawfordsville | 6 | 2 | 33% |
| Seymour | 3 | 0 | 0% |
| Vincennes | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 38 | 38 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 34 | 34 (100%) | $1.00 | $1.00 |
| Structure backfill, type 2 | 211-09265 | CYS | 31 | 24 (77%) | $46.20 | $82.00 |
| Project estimate adjustment | 109-08463 | DOL | 24 | 24 (100%) | $1.00 | $1.00 |
| Mobilization and demobilization for seeding | 621-01004 | EACH | 36 | 23 (64%) | $478.56 | $525.00 |
| Compacted aggregate, no. 53 | 301-12234 | CYS | 29 | 23 (79%) | $57.37 | $105.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & B Paving LLC | 24 | 13 of 24 |
| Morphey Construction Inc. | 20 | 7 of 20 |
| Milestone Contractors LP | 18 | 9 of 18 |
| Rieth-Riley Construction Co., Inc. | 15 | 4 of 15 |
| Crider & Crider Inc | 10 | 4 of 10 |
| Phend & Brown Inc | 9 | 2 of 9 |
| William Charles Construction Company | 9 | 1 of 9 |
| 3D Company Inc | 8 | 3 of 8 |
| Calumet Civil Contractors Inc | 7 | 4 of 7 |
| His Constructors Inc | 6 | 2 of 6 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 08 APR 2026 | R-42595-A | Seymour | INTERSECTION IMPROVEMENT WITH ADDED TURN AND TRAVEL LANES | 4 of 4 | $7,509,802 | +16% |
| 14 JAN 2026 | R-42755-A | Greenfield | NEW ROAD CONSTRUCTION | 6 of 10 | $3,794,672 | +13% |
| 08 OCT 2025 | R-41153-A | Fort Wayne | ADDED TRAVEL LANES | 3 of 6 | $4,305,260 | +5.0% |
| 06 AUG 2025 | R-41781-A | Greenfield | ADDED TRAVEL LANES, SMALL STR, BRIDGE WIDENING AND OVERLAY | 1 of 6 | $35,582,811 | Low, 2.0% under the second |
| 14 MAY 2025 | R-41079-A | Fort Wayne | NEW INTERCHANGE, BRIDGE AND SIDEWALK CONSTRUCTION | 6 of 6 | $57,373,716 | +13% |
| 12 FEB 2025 | R-41054-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT | 5 of 8 | $2,244,930 | +13% |
| 15 JAN 2025 | R-41987-A | Greenfield | ROAD REHABILITATION | 2 of 6 | $5,523,833 | 0.0% |
| 15 JAN 2025 | R-43321-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 1 of 4 | $3,242,078 | Low, 5.0% under the second |
| 15 JAN 2025 | R-45107-A | Greenfield | ROAD REHABILITATION | 2 of 6 | $6,452,534 | +6.0% |
| 11 DEC 2024 | R-44240-A | Crawfordsville | NEW INTERCHANGE CONSTRUCTION | 2 of 6 | $62,745,499 | +4.0% |
| 11 DEC 2024 | B-42397-A | Greenfield | NEW BRIDGE, ACCESS CONTROL AND SURFACE TREATMENT | 3 of 7 | $37,095,427 | +2.0% |
| 14 NOV 2024 | R-37909-A | Crawfordsville | ROAD RECONSTRUCTION | 1 of 6 | $5,198,886 | Low, 13% under the second |
| 14 NOV 2024 | R-43278-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 6 of 7 | $995,278 | +14% |
| 14 NOV 2024 | R-43416-A | Crawfordsville | SMALL STRUCTURE REPLACEMENT | 7 of 7 | $2,997,233 | +13% |
| 09 OCT 2024 | R-41674-A | Greenfield | PAVEMENT REPLACEMENT | 2 of 7 | $14,941,784 | +4.0% |
| 09 OCT 2024 | R-43274-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT | 1 of 5 | $1,575,059 | Low, 15% under the second |
| 09 OCT 2024 | R-43324-A | Fort Wayne | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 5 of 8 | $1,298,745 | +13% |
| 09 OCT 2024 | B-43495-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 2 of 6 | $1,189,642 | 0.0% |
| 09 OCT 2024 | B-43556-A | Greenfield | SMALL STRUCTURE REPLACEMENT | 5 of 8 | $486,421 | +15% |
| 11 SEP 2024 | R-40411-A | Seymour | PAVEMENT REPLACEMENT, SCOUR PROTECTION AND SIDEWALK RAMPS | 5 of 6 | $15,994,050 | +3.0% |
| 11 SEP 2024 | R-41949-A | Fort Wayne | NEW ROAD CONSTRUCTION | 6 of 6 | $2,389,036 | +23% |
| 10 APR 2024 | R-40831-A | Greenfield | ROAD RECONSTRUCTION | 1 of 2 | $5,248,160 | Low, 12% under the second |
| 10 APR 2024 | R-42616-B | Greenfield | NEW INTERCHANGE AND BRIDGE CONSTRUCTION | 1 of 3 | $37,603,451 | Low, 13% under the second |
| 13 MAR 2024 | R-42277-A | Greenfield | INTERSECTION IMPROVEMENT, ROUNDABOUT AND NEW ROAD CONSTR | 1 of 7 | $3,964,564 | Low, 5.0% under the second |
| 15 FEB 2024 | R-41852-A | Fort Wayne | ROAD RECONSTRUCTION | 1 of 4 | $5,474,000 | Low, 4.0% under the second |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.