INDOT contract R-42595-A bid tabulation
INTERSECTION IMPROVEMENT WITH ADDED TURN AND TRAVEL LANES. Let by Indiana DOT on April 8, 2026, Monroe, Seymour. 4 bids received; low bid $6,452,552 by Crider & Crider Inc.
- Owner
- Indiana DOT
- Letting
- 08 APR 2026
- Pay items
- 207
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Crider & Crider Inc | $6,452,552 | Low |
| 2 | E & B Paving LLC | $6,510,015 | +1.0% |
| 3 | Milestone Contractors LP | $7,094,771 | +10% |
| 4 | Gradex Inc | $7,509,802 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Crider & Crider Inc | 2. E & B Paving LLC | 3. Milestone Contractors LP | 4. Gradex Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $93,000 | $50,000 | $45,000 | $536,391 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 50 | $550.00 | $770.00 | $900.00 | $983.11 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 50 | $300.00 | $415.00 | $700.00 | $983.11 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0013 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0014 | Mobilization and demobilization (110-01001) | LS | 1 | $195,000 | $320,000 | $354,700 | $375,490 |
| 0015 | Clearing right-of-way (201-52370) | LS | 1 | $125,000 | $102,497 | $98,000 | $150,196 |
| 0016 | Pavement removal (202-02240) | SYS | 650 | $27.00 | $23.50 | $16.00 | $11.15 |
| 0017 | Curb, concrete, remove (202-02278) | LFT | 416 | $10.00 | $15.00 | $10.00 | $7.10 |
| 0018 | Curb and gutter, remove (202-02279) | LFT | 2,705 | $10.00 | $15.00 | $11.00 | $7.10 |
| 0019 | Regulated materials, dispose, type C (202-05545) | CYS | 208 | $80.00 | $60.00 | $198.00 | $198.00 |
| 0020 | Regulated materials, remove, type C (202-05550) | CYS | 208 | $22.00 | $65.00 | $198.00 | $198.00 |
| 0021 | Regulated materials, transport, type C (202-05555) | CYS | 208 | $58.00 | $50.00 | $198.00 | $198.00 |
| 0022 | Testing for wastes, type C (202-05571) | EACH | 1 | $5,000.00 | $2,500.00 | $1,750.00 | $1,750.00 |
| 0023 | Sidewalk concrete, remove (202-52710) | SYS | 891 | $20.00 | $16.00 | $18.00 | $16.41 |
| 0024 | Sign, remove (202-74035) | EACH | 17 | $60.00 | $250.00 | $50.00 | $50.00 |
| 0025 | Inlet, remove (202-91385) | EACH | 18 | $770.00 | $600.00 | $770.00 | $334.60 |
| 0026 | Manhole, remove (202-93047) | EACH | 4 | $1,000.00 | $1,100.00 | $1,000.00 | $369.38 |
| 0027 | Signal pole foundation, remove (202-93995) | EACH | 2 | $1,000.00 | $850.00 | $1,600.00 | $750.00 |
| 0028 | Signal pole, remove (202-93999) | EACH | 2 | $550.00 | $950.00 | $950.00 | $950.00 |
| 0029 | Concrete wall, remove (202-96035) | LFT | 71 | $50.00 | $50.00 | $110.00 | $86.47 |
| 0030 | Pipe, remove (202-96133) | LFT | 1,045 | $47.00 | $10.00 | $24.00 | $11.41 |
| 0031 | Pipe end section, remove (202-98488) | EACH | 1 | $350.00 | $600.00 | $650.00 | $892.10 |
| 0032 | Excavation, common (203-02000) | CYS | 14,148 | $40.00 | $48.00 | $32.00 | $34.13 |
| 0033 | Excavation, rock (203-02010) | CYS | 890 | $10.00 | $1.00 | $53.00 | $211.07 |
| 0034 | Stormwater management budget (205-12108) | DOL | 32,336 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0035 | Stormwater management implementation (205-12616) | LS | 1 | $35,000 | $45,000 | $45,000 | $67,555 |
| 0036 | SWQCP preparation (205-12618) | LS | 1 | $2,250.00 | $3,500.00 | $2,500.00 | $2,500.00 |
| 0037 | Subgrade treatment, type II (207-08264) | SYS | 1,782 | $22.00 | $27.00 | $24.00 | $15.34 |
| 0038 | Subgrade treatment, type IC (207-09935) | SYS | 17,047 | $32.00 | $34.00 | $37.00 | $30.04 |
| 0039 | B borrow (211-02050) | CYS | 150 | $50.00 | $70.00 | $85.00 | $50.77 |
| 0040 | Structure backfill, type 2 (211-09265) | CYS | 3,534 | $65.00 | $76.00 | $78.00 | $42.34 |
| 0041 | Flowable backfill, non- removable (213-09269) | CYS | 95 | $240.00 | $255.00 | $250.00 | $327.88 |
| 0042 | Geogrid, type IB (214-11796) | SYS | 903 | $3.00 | $2.36 | $3.00 | $2.50 |
| 0043 | Geotextile for pavement, type 2A (214-12238) | SYS | 2,887 | $2.50 | $2.75 | $3.10 | $3.44 |
| 0044 | Compacted aggregate, no. 8 (301-12233) | CYS | 962 | $100.00 | $72.00 | $88.00 | $65.57 |
| 0045 | Compacted aggregate, no. 53 (301-12234) | CYS | 288 | $70.00 | $102.00 | $95.00 | $71.20 |
| 0046 | Dense graded subbase (302-07455) | CYS | 167 | $90.00 | $102.00 | $120.00 | $71.21 |
| 0047 | Compacted aggregate, no. 53, temporary for driveways (303-08210) | TON | 662 | $40.00 | $40.00 | $74.00 | $34.81 |
| 0048 | Widening with HMA, type B (304-07493) | TON | 124 | $180.00 | $143.00 | $175.00 | $143.00 |
| 0049 | Widening with HMA, type C (304-07494) | TON | 167 | $180.00 | $165.00 | $178.00 | $165.00 |
| 0050 | HMA patching, full depth, type C (304-12625) | TON | 50 | $250.00 | $405.00 | $240.00 | $390.00 |
| 0051 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 5,106 | $3.00 | $5.00 | $5.00 | $5.00 |
| 0052 | Milling, transition (306-08043) | SYS | 2,571 | $4.50 | $5.00 | $4.00 | $5.00 |
| 0053 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 1,758 | $140.00 | $140.00 | $135.00 | $140.00 |
| 0054 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 2,035 | $120.00 | $120.00 | $115.00 | $120.00 |
| 0055 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 5,968 | $95.00 | $100.00 | $90.00 | $100.00 |
| 0056 | Joint adhesive (401-11526) | LFT | 22,745 | $1.00 | $0.55 | $1.00 | $0.55 |
| 0057 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 22,745 | $3.80 | $2.75 | $3.77 | $2.75 |
| 0058 | HMA wedge and level, type B (402-07451) | TON | 44 | $160.00 | $300.00 | $160.00 | $300.00 |
| 0059 | HMA for temporary pavement, type C (402-10086) | TON | 363 | $155.00 | $225.00 | $120.00 | $134.78 |
| 0060 | Asphalt for tack coat (406-05520) | TON | 17 | $800.00 | $725.00 | $790.00 | $725.00 |
| 0061 | PCCP, 6 in. (502-06627) | SYS | 24 | $82.00 | $81.00 | $140.00 | $81.00 |
| 0062 | Fence, wood, reset (603-02736) | LFT | 122 | $125.00 | $65.00 | $130.00 | $130.00 |
| 0063 | HMA for sidewalk (604-05528) | TON | 196 | $145.00 | $240.00 | $144.00 | $240.00 |
| 0064 | Sidewalk, concrete (604-06070) | SYS | 1,336 | $55.00 | $54.00 | $65.00 | $54.00 |
| 0065 | Curb ramp, concrete (604-08086) | SYS | 446 | $115.00 | $115.00 | $210.00 | $115.00 |
| 0066 | Detectable warning surfaces (604-12083) | SYS | 45 | $660.00 | $235.00 | $530.00 | $714.00 |
| 0067 | Curb, concrete (605-06120) | LFT | 458 | $32.00 | $32.00 | $72.00 | $32.00 |
| 0068 | Curb and gutter, concrete (605-06140) | LFT | 4,778 | $29.00 | $29.00 | $38.00 | $29.00 |
| 0069 | Curb and gutter, concrete , modified (605-06140) | LFT | 109 | $47.00 | $47.00 | $74.00 | $47.00 |
| 0070 | HMA for approaches, type B (610-07487) | TON | 205 | $100.00 | $120.00 | $98.00 | $120.00 |
| 0071 | PCCP for approaches, 6 in. (610-08446) | SYS | 95 | $70.00 | $70.00 | $145.00 | $70.00 |
| 0072 | PCCP for approaches, 9 in. (610-09108) | SYS | 903 | $96.00 | $96.00 | $146.00 | $96.00 |
| 0073 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $450.00 | $325.00 | $400.00 | $400.00 |
| 0074 | Mailbox assembly, reset, double (611-08233) | EACH | 1 | $475.00 | $475.00 | $500.00 | $500.00 |
| 0075 | Right-of-way marker (615-06490) | EACH | 45 | $180.00 | $180.00 | $250.00 | $250.00 |
| 0076 | Monument, type B (615-06505) | EACH | 25 | $1,100.00 | $1,100.00 | $1,050.00 | $1,050.00 |
| 0077 | Plate , steel (618-12008) | EACH | 4 | $4,600.00 | $3,900.00 | $1,100.00 | $3,057.82 |
| 0078 | Mobilization and demobilization for seeding (621-01004) | EACH | 6 | $800.00 | $600.00 | $800.00 | $900.00 |
| 0079 | Seed mixture, type U (621-06554) | LBS | 825 | $7.50 | $10.00 | $7.50 | $15.55 |
| 0080 | Mulching material (621-06565) | TON | 5 | $510.00 | $600.00 | $510.00 | $949.00 |
| 0081 | Sodding (621-06574) | SYS | 146 | $18.00 | $18.00 | $17.50 | $38.98 |
| 0082 | Plant, deciduous tree, single stem, over 3.5 in. (622-05652) | EACH | 12 | $1,500.00 | $1,600.00 | $1,500.00 | $2,315.00 |
| 0083 | Computer system equipment (628-11976) | EACH | 2 | $500.00 | $1,000.00 | $1,100.00 | $850.00 |
| 0084 | Field office, type D (628-12683) | MOS | 24 | $2,350.00 | $3,300.00 | $3,080.00 | $3,600.00 |
| 0085 | Topsoil processing and distribution (629-000149) | SYS | 10,134 | $7.50 | $1.50 | $8.30 | $7.51 |
| 0086 | Topsoil amendment budget (629-000150) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0087 | Concrete, A (702-90915) | CYS | 21 | $400.00 | $399.00 | $415.00 | $399.00 |
| 0088 | Pipe, type 2, circular, diameter 36 in. (715-05024) | LFT | 735 | $215.00 | $202.00 | $278.00 | $103.16 |
| 0089 | Pipe, type 2, circular, diameter 36 in. , WMQ (715-05024) | LFT | 132 | $350.00 | $280.00 | $360.00 | $229.88 |
| 0090 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 1,212 | $10.00 | $28.00 | $14.00 | $14.26 |
| 0091 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 121 | $65.00 | $75.00 | $48.00 | $25.55 |
| 0092 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,074 | $75.00 | $94.00 | $117.00 | $35.60 |
| 0093 | Pipe, type 2, circular, diameter 12 in. , WMQ (715-05149) | LFT | 90 | $110.00 | $97.00 | $98.00 | $58.72 |
| 0094 | Pipe, type 2, circular, diameter 15 in. , WMQ (715-05151) | LFT | 20 | $245.00 | $125.00 | $150.00 | $42.12 |
| 0095 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 161 | $140.00 | $108.00 | $150.00 | $47.31 |
| 0096 | Pipe, type 2, circular, diameter 18 in. , WMQ (715-05152) | LFT | 39 | $145.00 | $138.00 | $145.00 | $79.40 |
| 0097 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 6 | $275.00 | $172.00 | $400.00 | $66.40 |
| 0098 | Pipe, type 2, circular, diameter 24 in. , WMQ (715-05154) | LFT | 89 | $180.00 | $178.00 | $170.00 | $121.77 |
| 0099 | Pipe, type 2, circular, diameter 30 in. (715-05156) | LFT | 380 | $190.00 | $173.00 | $230.00 | $87.39 |
| 0100 | Pipe, type 2, circular, diameter 30 in. , WMQ (715-05156) | LFT | 73 | $170.00 | $260.00 | $290.00 | $166.39 |
| 0101 | Pipe, type 2, circular, diameter 48 in. (715-05161) | LFT | 15 | $420.00 | $380.00 | $400.00 | $167.61 |
| 0102 | Video inspection for pipe (715-09064) | LFT | 2,977 | $1.90 | $1.10 | $1.10 | $2.21 |
| 0103 | Geotextile for underdrains, type 1A (718-12305) | SYS | 135 | $4.50 | $5.75 | $3.00 | $0.51 |
| 0104 | Aggregate for underdrains (718-52610) | CYS | 22 | $145.00 | $95.00 | $150.00 | $54.43 |
| 0105 | Manhole, type K15, modified (720-08241) | EACH | 2 | $9,500.00 | $7,700.00 | $7,500.00 | $6,863.10 |
| 0106 | Manhole, type C5 (720-08659) | EACH | 3 | $5,000.00 | $4,400.00 | $5,200.00 | $3,707.46 |
| 0107 | Manhole, type H15 (720-12660) | EACH | 10 | $7,000.00 | $6,400.00 | $6,700.00 | $3,707.11 |
| 0108 | Casting, inlet, adjust to grade (720-12797) | EACH | 3 | $1,200.00 | $750.00 | $3,500.00 | $934.08 |
| 0109 | Manhole, type K7 (720-12811) | EACH | 2 | $8,250.00 | $7,200.00 | $7,000.00 | $6,863.10 |
| 0110 | Casting, type 4, furnish and adjust to grade (720-44025) | EACH | 2 | $1,600.00 | $1,075.00 | $1,500.00 | $2,186.71 |
| 0111 | Inlet, type E7 (720-45030) | EACH | 3 | $3,300.00 | $3,050.00 | $4,200.00 | $2,529.57 |
| 0112 | Manhole, type C4 (720-45410) | EACH | 4 | $5,000.00 | $4,100.00 | $6,200.00 | $3,786.65 |
| 0113 | Manhole, type E4 (720-45416) | EACH | 2 | $13,000 | $10,700 | $12,000 | $7,211.57 |
| 0114 | Manhole, type N4 (720-91110) | EACH | 1 | $21,250 | $16,500 | $18,000 | $15,497 |
| 0115 | Manhole, type H4 (720-91973) | EACH | 11 | $8,000.00 | $6,100.00 | $7,200.00 | $5,859.58 |
| 0116 | Manhole, type K4 (720-94612) | EACH | 2 | $8,000.00 | $7,250.00 | $8,200.00 | $6,863.10 |
| 0117 | Inlet, type B15 (720-98174) | EACH | 28 | $4,700.00 | $3,750.00 | $5,200.00 | $2,597.50 |
| 0118 | Inlet, type C15 (720-98555) | EACH | 16 | $4,700.00 | $3,800.00 | $5,200.00 | $2,608.82 |
| 0119 | Controller, reset timing (801-02595) | EACH | 1 | $1,000.00 | $450.00 | $450.00 | $450.00 |
| 0120 | Temporary pole, timber, with down guys and anchors (801-02617) | EACH | 1 | $1,600.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0121 | Construction sign, type C (801-03290) | EACH | 16 | $140.00 | $140.00 | $323.00 | $140.00 |
| 0122 | Road closure sign assembly (801-04308) | EACH | 4 | $320.00 | $320.00 | $187.00 | $320.00 |
| 0123 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 17,920 | $2.00 | $1.99 | $2.22 | $1.99 |
| 0124 | Temporary traffic signal installation, maintain (801-06539) | LS | 1 | $7,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0125 | Detour route marker assembly (801-06625) | EACH | 34 | $135.00 | $135.00 | $152.00 | $135.00 |
| 0126 | Construction sign, type A (801-06640) | EACH | 24 | $190.00 | $189.00 | $166.00 | $189.00 |
| 0127 | Construction sign, type B (801-06645) | EACH | 21 | $140.00 | $140.00 | $60.00 | $140.00 |
| 0128 | Maintaining traffic (801-06775) | LS | 1 | $160,000 | $100,000 | $179,970 | $750,980 |
| 0129 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 10 | $6,100.00 | $4,525.00 | $8,300.00 | $8,300.00 |
| 0130 | Barricade, type III-A (801-07118) | LFT | 196 | $18.00 | $17.55 | $8.00 | $17.55 |
| 0131 | Temporary traffic barrier, type 2 (801-08401) | LFT | 2,600 | $50.00 | $38.00 | $53.00 | $56.87 |
| 0132 | Portable changeable message sign (801-11642) | EACH | 4 | $6,000.00 | $5,755.00 | $5,927.00 | $5,755.00 |
| 0133 | Temporary curb ramp (801-11990) | EACH | 2 | $3,000.00 | $2,200.00 | $5,300.00 | $2,755.00 |
| 0134 | Law enforcement officer (801-12324) | HRS | 1,200 | $60.00 | $60.00 | $60.00 | $60.00 |
| 0135 | Temporary pavement marking, removable, 25 in. (801-12389) | LFT | 46 | $15.00 | $14.00 | $12.31 | $14.00 |
| 0136 | Temporary accessible pedestrian path (801-12641) | SYS | 496 | $120.00 | $60.00 | $77.20 | $91.53 |
| 0137 | Signal head relocate (801-94295) | EACH | 1 | $500.00 | $550.00 | $550.00 | $550.00 |
| 0138 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 348 | $30.00 | $28.00 | $28.00 | $28.00 |
| 0139 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 72 | $28.00 | $26.00 | $26.00 | $26.00 |
| 0140 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 205 | $26.00 | $31.00 | $31.00 | $31.00 |
| 0141 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 71 | $28.00 | $32.00 | $32.00 | $32.00 |
| 0142 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 84 | $30.00 | $33.00 | $33.00 | $33.00 |
| 0143 | Sign, ground mounted, reset (802-91122) | EACH | 16 | $150.00 | $250.00 | $250.00 | $250.00 |
| 0144 | Signal service, connection allowance (805-000079) | DOL | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0145 | Traffic signal equipment, remove (805-01300) | EACH | 4 | $700.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0146 | Service point riser and weatherhead (805-01421) | EACH | 1 | $500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0147 | Miscellaneous equipment for traffic signals (805-01579) | LS | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0148 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 4 | $4,500.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 0149 | Handhole, signal, type 1 (805-01842) | EACH | 11 | $2,100.00 | $2,200.00 | $2,200.00 | $2,200.00 |
| 0150 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $1,100.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0151 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 8 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0152 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $20,000 | $21,000 | $21,000 | $21,000 |
| 0153 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 7 | $2,200.00 | $1,800.00 | $1,800.00 | $1,800.00 |
| 0154 | Emergency vehicle preemption detector, two channel, two direction (805-03979) | EACH | 2 | $3,000.00 | $5,800.00 | $5,800.00 | $5,800.00 |
| 0155 | Signal pole, pedestal, 12 FT (805-04133) | EACH | 6 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0156 | Controller and cabinet (805-04952) | EACH | 1 | $11,000 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0158 | Handhole, signal, type 2 (805-11744) | EACH | 2 | $1,800.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0159 | Rectangular rapid flashing beacon (805-11799) | EACH | 3 | $7,000.00 | $10,000 | $10,000 | $10,000 |
| 0160 | Pedestrian push button, APS (805-11817) | EACH | 11 | $1,100.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0161 | Traffic signal head, no. 3 (805-78205) | EACH | 8 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0162 | Traffic signal head, no. 4 (805-78225) | EACH | 4 | $1,200.00 | $1,400.00 | $1,400.00 | $1,400.00 |
| 0163 | Span, catenary, and tether (805-78415) | EACH | 4 | $3,200.00 | $4,100.00 | $4,100.00 | $4,100.00 |
| 0164 | Disconnect hanger (805-78420) | EACH | 4 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0165 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 19 | $1.60 | $5.00 | $5.00 | $5.00 |
| 0166 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 4,666 | $1.40 | $1.00 | $1.00 | $1.00 |
| 0167 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 1,681 | $1.50 | $4.25 | $4.25 | $4.25 |
| 0168 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 1,820 | $4.00 | $4.50 | $4.50 | $4.50 |
| 0169 | Signal cable, control, copper, 7C/14 gauge (805-78490) | LFT | 173 | $5.00 | $4.75 | $4.75 | $4.75 |
| 0170 | Signal cable, control, copper, 9C/14 gauge (805-78495) | LFT | 601 | $5.50 | $5.00 | $5.00 | $5.00 |
| 0171 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 4,240 | $1.85 | $2.00 | $2.00 | $2.00 |
| 0172 | Signal detector housing (805-78785) | EACH | 18 | $2,050.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0173 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 1,839 | $10.00 | $11.00 | $11.00 | $11.00 |
| 0174 | Controller cabinet foundation, type P1 (805-78925) | EACH | 2 | $4,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0175 | Signal pole, steel strain, 30 FT (805-81032) | EACH | 4 | $10,000 | $9,500.00 | $9,500.00 | $9,500.00 |
| 0177 | Signal detector housing adjust to grade (805-92951) | EACH | 4 | $1,200.00 | $600.00 | $600.00 | $600.00 |
| 0178 | Luminaire, mast arm, 10 FT (807-02781) | EACH | 3 | $1,000.00 | $1,700.00 | $1,700.00 | $1,700.00 |
| 0179 | Lighting foundation, concrete, with grounding, 24 in. X 24 in. X 96 in. (807-03758) | EACH | 2 | $2,200.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0180 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 1,598 | $30.00 | $35.00 | $35.00 | $35.00 |
| 0181 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 150 | $22.00 | $24.00 | $24.00 | $24.00 |
| 0182 | Luminaire, low lumen roadway (807-12202) | EACH | 2 | $400.00 | $600.00 | $600.00 | $600.00 |
| 0183 | Metered service point (807-12354) | EACH | 1 | $2,000.00 | $1,100.00 | $1,100.00 | $1,100.00 |
| 0184 | Light pole, 30 FT E.M.H., 10 FT mast arm, breakaway base (807-84492) | EACH | 2 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0185 | Service point, type II (807-86810) | EACH | 1 | $9,000.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 0186 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 210 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0187 | Connector kit, unfused (807-86910) | EACH | 2 | $30.00 | $55.00 | $55.00 | $55.00 |
| 0188 | Connector kit, fused (807-86915) | EACH | 2 | $30.00 | $55.00 | $55.00 | $55.00 |
| 0189 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 3 | $30.00 | $20.00 | $20.00 | $20.00 |
| 0190 | Insulation link, non- waterproofed (807-86930) | EACH | 4 | $30.00 | $20.00 | $20.00 | $20.00 |
| 0191 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 2 | $200.00 | $100.00 | $100.00 | $100.00 |
| 0192 | Pavement message marking, thermoplastic, bike symbol (808-02977) | EACH | 13 | $500.00 | $489.00 | $575.00 | $489.00 |
| 0193 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 1,228 | $11.20 | $11.90 | $10.50 | $11.19 |
| 0194 | Retro-reflectivity testing (808-09381) | LS | 1 | $5,500.00 | $5,500.00 | $3,416.00 | $5,500.00 |
| 0195 | Pavement marking , mma, green (808-09968) | SFT | 555 | $10.00 | $9.95 | $15.35 | $9.95 |
| 0196 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 8,648 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0197 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 8,760 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0198 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 707 | $1.25 | $1.25 | $1.10 | $1.25 |
| 0199 | Pavement message marking, multi- component, bus (808-12021) | EACH | 1 | $455.00 | $455.00 | $500.00 | $455.00 |
| 0200 | Grooving for pavement markings (808-12032) | LFT | 20,135 | $0.75 | $0.75 | $0.56 | $0.75 |
| 0201 | Line, multi-component, dotted, white, 6 in. (808-12353) | LFT | 1,017 | $1.75 | $1.75 | $1.25 | $1.75 |
| 0202 | Pavement message marking, preformed plastic, lane indication arrow (808-75071) | EACH | 40 | $450.00 | $437.00 | $706.55 | $437.00 |
| 0203 | Pavement message marking, preformed plastic, only (808-75073) | EACH | 1 | $800.00 | $755.00 | $1,083.18 | $755.00 |
| 0204 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 417 | $6.00 | $5.99 | $5.30 | $5.99 |
| 0205 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 250 | $11.55 | $11.52 | $10.50 | $11.52 |
| 0206 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 48 | $20.00 | $47.90 | $25.00 | $12.00 |
| 0207 | Cellular modem kit (805-08244) | EACH | 1 | $4,000.00 | $3,750.00 | $3,750.00 | $3,750.00 |
| 0208 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 1 | $1,100.00 | $750.00 | $750.00 | $750.00 |
| 0209 | Temporary pedestrian channelizer (801-12862) | LFT | 1,600 | $20.00 | $18.00 | $25.00 | $33.43 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of April 8, 2026. Compiled by Mirage Metrics.