INDOT contract R-43256-A bid tabulation
INTERSECTION IMPROVEMENT, ADDED TURN LANES, SMALL STRUCTURE. Let by Indiana DOT on February 12, 2025, Allen, Fort Wayne. 5 bids received; low bid $4,553,910 by Bunn Excavating Inc.
- Owner
- Indiana DOT
- Letting
- 12 FEB 2025
- Pay items
- 115
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Bunn Excavating Inc | $4,553,910 | Low |
| 2 | E & B Paving LLC | $4,583,480 | +1.0% |
| 3 | Morphey Construction Inc. | $4,648,000 | +2.0% |
| 4 | Phend & Brown Inc | $4,975,719 | +9.0% |
| 5 | Brooks Construction Company Inc | $5,296,778 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Bunn Excavating Inc | 2. E & B Paving LLC | 3. Morphey Construction Inc. | 4. Phend & Brown Inc | 5. Brooks Construction Company Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $57,793 | $30,700 | $20,000 | $40,000 | $65,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $212,787 | $229,000 | $232,400 | $250,000 | $260,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $13,475 | $28,400 | $92,960 | $100,000 | $100,000 |
| 0013 | Headwall, remove (202-02271) | EACH | 2 | $2,753.04 | $2,000.00 | $1,000.00 | $990.55 | $577.00 |
| 0014 | Center curb, concrete, remove (202-02273) | SYS | 133 | $29.43 | $43.00 | $50.00 | $30.00 | $67.00 |
| 0015 | Handhole, remove (202-86946) | EACH | 5 | $1,665.57 | $1,500.00 | $400.00 | $1,500.00 | $1,500.00 |
| 0016 | Detector housing, remove (202-90277) | EACH | 2 | $555.19 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0017 | Guardrail end treatment, remove (202-93741) | EACH | 4 | $589.61 | $625.00 | $150.00 | $531.00 | $625.00 |
| 0018 | Signal pole foundation, remove (202-93995) | EACH | 2 | $1,665.57 | $1,500.00 | $1,000.00 | $1,500.00 | $1,500.00 |
| 0019 | Signal pole, remove (202-93999) | EACH | 2 | $1,665.57 | $1,500.00 | $500.00 | $1,500.00 | $1,500.00 |
| 0020 | Pipe, remove (202-96133) | LFT | 495 | $37.91 | $100.00 | $260.00 | $250.00 | $206.00 |
| 0021 | Fence, farm field, remove (202-99187) | LFT | 695 | $6.66 | $3.75 | $5.00 | $6.00 | $3.75 |
| 0022 | Excavation, common (203-02000) | CYS | 5,828 | $44.91 | $31.45 | $50.00 | $70.00 | $53.00 |
| 0023 | Borrow (203-02070) | CYS | 3,252 | $38.53 | $25.00 | $30.00 | $20.00 | $40.00 |
| 0024 | Excavation, waterway (203-51223) | CYS | 570 | $64.80 | $100.00 | $80.00 | $120.00 | $58.00 |
| 0025 | Pump around (205-11626) | EACH | 3 | $25,671 | $37,333 | $15,000 | $45,000 | $20,000 |
| 0026 | Stormwater management budget (205-12108) | DOL | 22,751 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0027 | Stormwater management implementation (205-12616) | LS | 1 | $33,653 | $16,500 | $5,000.00 | $10,000 | $2,500.00 |
| 0028 | Excavation, wet (206-51220) | CYS | 25 | $73.31 | $75.00 | $120.00 | $120.00 | $86.00 |
| 0029 | Subgrade treatment, type IC (207-09935) | SYS | 6,955 | $36.14 | $25.11 | $40.00 | $35.00 | $30.00 |
| 0030 | B borrow (211-02050) | CYS | 150 | $74.99 | $97.20 | $80.00 | $40.00 | $55.00 |
| 0031 | Structure backfill, type 2 (211-09265) | CYS | 2,549 | $73.34 | $59.10 | $85.00 | $170.00 | $100.00 |
| 0032 | Structure backfill, type 5 (211-09268) | CYS | 144 | $248.95 | $300.00 | $200.00 | $250.00 | $231.00 |
| 0033 | Geogrid, type IB (214-11796) | SYS | 908 | $5.95 | $7.07 | $3.00 | $2.00 | $3.00 |
| 0034 | Compacted aggregate, no. 8 (301-12233) | CYS | 393 | $73.44 | $70.46 | $111.00 | $75.00 | $80.00 |
| 0035 | Compacted aggregate, no. 53 (303-01180) | TON | 654 | $34.31 | $45.00 | $60.00 | $45.00 | $50.00 |
| 0036 | Widening with HMA, type C (304-07494) | TON | 525 | $166.56 | $150.00 | $170.00 | $140.00 | $125.00 |
| 0037 | HMA patching, full depth, type C (304-12625) | TON | 21 | $244.28 | $220.00 | $300.00 | $140.00 | $275.00 |
| 0038 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 7,315 | $4.88 | $3.00 | $4.00 | $5.75 | $7.00 |
| 0039 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 982 | $161.00 | $145.00 | $125.00 | $170.00 | $125.00 |
| 0040 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 543 | $166.56 | $150.00 | $123.00 | $160.00 | $123.00 |
| 0041 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,388 | $111.04 | $100.00 | $95.00 | $130.00 | $95.00 |
| 0042 | QC/QA-HMA, 3, 58E, intermediate, OG, 19.0 MM (401-000062) | TON | 123 | $177.66 | $160.00 | $130.00 | $333.00 | $130.00 |
| 0043 | Joint adhesive, surface (401-10258) | LFT | 9,858 | $0.32 | $0.29 | $0.50 | $1.00 | $0.50 |
| 0044 | Joint adhesive, intermediate (401-10259) | LFT | 4,204 | $0.42 | $0.38 | $0.70 | $1.00 | $0.70 |
| 0045 | Liquid asphalt sealant , rpe (401-11785) | LFT | 11,586 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 0046 | HMA for temporary pavement, type C (402-10086) | TON | 1,578 | $98.82 | $89.00 | $100.00 | $120.00 | $110.00 |
| 0047 | Asphalt for tack coat (406-05521) | SYS | 15,843 | $2.22 | $2.00 | $0.35 | $1.00 | $0.30 |
| 0048 | Guardrail, remove (601-02241) | LFT | 740 | $17.77 | $9.00 | $6.00 | $16.00 | $9.00 |
| 0049 | Fence, farm field, 47 in. (603-06040) | LFT | 740 | $25.54 | $12.50 | $15.00 | $23.00 | $12.50 |
| 0050 | Center curb, concrete, type D (605-06215) | LFT | 133 | $99.93 | $90.00 | $160.00 | $160.00 | $150.00 |
| 0051 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 1,103 | $1.08 | $13.01 | $2.00 | $3.50 | $7.00 |
| 0052 | Paved side ditch, type B (607-06340) | LFT | 70 | $133.25 | $120.00 | $150.00 | $140.00 | $210.00 |
| 0053 | Right-of-way marker (615-06490) | EACH | 15 | $316.46 | $325.00 | $200.00 | $285.00 | $325.00 |
| 0054 | Riprap, class 1 (616-05688) | TON | 471 | $209.97 | $104.25 | $160.00 | $120.00 | $151.00 |
| 0055 | Riprap, revetment (616-06405) | TON | 331 | $118.77 | $76.65 | $130.00 | $60.00 | $95.00 |
| 0056 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,708 | $6.49 | $5.16 | $4.00 | $2.75 | $3.00 |
| 0057 | Geotextile for riprap, type 2B (616-12249) | SYS | 230 | $12.39 | $6.31 | $5.00 | $7.00 | $5.00 |
| 0058 | Mobilization and demobilization for seeding (621-01004) | EACH | 7 | $555.19 | $500.00 | $425.00 | $425.00 | $425.00 |
| 0059 | Mulched seeding, type U (621-06560) | SYS | 10,111 | $2.66 | $2.40 | $6.00 | $10.00 | $2.45 |
| 0060 | Sodding (621-06574) | SYS | 581 | $8.88 | $8.00 | $14.00 | $16.00 | $8.45 |
| 0061 | Computer system equipment (628-11976) | EACH | 1 | $1,199.21 | $688.00 | $800.00 | $700.00 | $688.00 |
| 0062 | Field office, type D (628-12683) | MOS | 24 | $6,127.84 | $4,650.00 | $2,400.00 | $4,825.00 | $4,650.00 |
| 0063 | Waterproofing membrane type 2 (714-000086) | SFT | 12,300 | $7.71 | $6.59 | $5.00 | $4.00 | $7.00 |
| 0064 | Structure, reinforced concrete, box sections, 8 FT X 5 FT (714-11178) | LFT | 82 | $1,106.22 | $1,891.35 | $1,900.00 | $1,650.00 | $2,700.00 |
| 0065 | Structure, reinforced concrete, box sections, 8 FT X 8 FT (714-11181) | LFT | 240 | $1,992.74 | $1,943.72 | $2,180.00 | $1,960.00 | $3,000.00 |
| 0066 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 60 | $41.51 | $52.00 | $29.00 | $5.71 | $38.00 |
| 0067 | Pipe, type 1, circular, diameter 12 in. (715-05118) | LFT | 18 | $106.74 | $143.76 | $80.00 | $100.00 | $144.00 |
| 0068 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 11 | $116.38 | $183.53 | $120.00 | $100.00 | $179.00 |
| 0069 | Pipe, type 1, circular, diameter 96 in. (715-05145) | LFT | 182 | $1,640.54 | $1,853.41 | $2,740.00 | $1,760.00 | $4,000.00 |
| 0070 | Geotextile for underdrains, type 2A (718-12307) | SYS | 49 | $20.33 | $9.75 | $4.00 | $10.00 | $2.00 |
| 0071 | Aggregate for underdrains (718-52610) | CYS | 6 | $66.62 | $74.46 | $111.00 | $125.00 | $50.00 |
| 0072 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 55 | $142.13 | $125.00 | $128.00 | $128.00 | $128.00 |
| 0073 | Road closure sign assembly (801-04308) | EACH | 39 | $300.91 | $375.00 | $271.00 | $271.00 | $271.00 |
| 0074 | Temporary pavement marking, 4 in. (801-06203) | LFT | 68,331 | $0.31 | $0.45 | $0.28 | $0.28 | $0.28 |
| 0075 | Temporary pavement marking, 5 in. (801-06204) | LFT | 160 | $0.60 | $0.50 | $0.54 | $0.54 | $0.54 |
| 0076 | Temporary pavement marking, 8 in. (801-06586) | LFT | 11,110 | $0.79 | $0.75 | $0.71 | $0.71 | $0.71 |
| 0077 | Construction sign, type A (801-06640) | EACH | 81 | $234.29 | $300.00 | $211.00 | $211.00 | $211.00 |
| 0078 | Construction sign, type B (801-06645) | EACH | 28 | $113.26 | $150.00 | $102.00 | $102.00 | $102.00 |
| 0079 | Flashing arrow sign (801-06710) | DAY | 360 | $16.66 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $251,581 | $450,930 | $273,598 | $200,000 | $351,591 |
| 0081 | Barricade, type III-A (801-07118) | LFT | 2,558 | $16.67 | $20.00 | $15.01 | $15.01 | $15.01 |
| 0082 | Barricade, type III-B (801-07119) | LFT | 200 | $16.67 | $20.00 | $15.01 | $15.01 | $15.01 |
| 0083 | Temporary crossover drainage pipe (801-07606) | LFT | 400 | $68.63 | $65.00 | $50.00 | $52.00 | $75.00 |
| 0084 | Temporary traffic barrier, type 2 (801-08401) | LFT | 4,431 | $1.11 | $22.00 | $20.00 | $29.44 | $5.00 |
| 0085 | Temporary crossover, type B (801-52817) | EACH | 2 | $147,943 | $150,000 | $67,000 | $20,000 | $50,000 |
| 0086 | Signal head relocate (801-94295) | EACH | 48 | $882.75 | $795.00 | $250.00 | $795.00 | $795.00 |
| 0087 | Sign, sheet, relocate (802-07060) | EACH | 8 | $138.80 | $125.00 | $150.00 | $125.00 | $125.00 |
| 0088 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 8 | $27.76 | $25.00 | $50.00 | $25.00 | $25.00 |
| 0089 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 2 | $5,551.90 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0090 | Handhole, signal, type 1 (805-01842) | EACH | 5 | $1,665.57 | $1,500.00 | $1,000.00 | $1,500.00 | $1,500.00 |
| 0091 | Conduit, HDPE, 2 in. schedule 40 (805-11814) | LFT | 552 | $38.86 | $35.00 | $30.00 | $35.00 | $35.00 |
| 0092 | Traffic signal head, no. 3 (805-78205) | EACH | 1 | $1,082.62 | $975.00 | $1,250.00 | $975.00 | $975.00 |
| 0093 | Span, catenary, and tether (805-78415) | EACH | 3 | $5,551.89 | $5,000.00 | $1,500.00 | $5,000.00 | $5,000.00 |
| 0094 | Disconnect hanger (805-78420) | EACH | 4 | $499.67 | $450.00 | $500.00 | $450.00 | $450.00 |
| 0095 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 10 | $5.55 | $5.00 | $10.00 | $5.00 | $5.00 |
| 0096 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 794 | $1.11 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0097 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 438 | $5.55 | $5.00 | $2.00 | $5.00 | $5.00 |
| 0098 | Signal cable, control, copper, 9C/14 gauge (805-78495) | LFT | 1,112 | $11.10 | $10.00 | $3.00 | $10.00 | $10.00 |
| 0099 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 2,502 | $3.33 | $3.00 | $2.00 | $3.00 | $3.00 |
| 0100 | Signal detector housing (805-78785) | EACH | 2 | $2,775.95 | $2,500.00 | $1,500.00 | $2,500.00 | $2,500.00 |
| 0101 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 132 | $22.21 | $20.00 | $10.00 | $20.00 | $20.00 |
| 0102 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 2 | $12,769 | $11,500 | $10,000 | $11,500 | $11,500 |
| 0103 | Temporary transverse markings white stop line 24 in. (808-01428) | LFT | 205 | $10.09 | $10.00 | $10.00 | $9.09 | $9.09 |
| 0104 | Pavement message marking, remove (808-05866) | SYS | 193 | $59.82 | $35.00 | $55.00 | $53.87 | $53.87 |
| 0105 | Transverse marking, remove (808-06368) | LFT | 433 | $4.42 | $6.00 | $4.00 | $3.98 | $3.98 |
| 0106 | Line, remove (808-06716) | LFT | 78,310 | $0.57 | $0.50 | $0.51 | $0.51 | $0.51 |
| 0107 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,886.33 | $1,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0108 | Grooving for pavement markings (808-12032) | LFT | 35,025 | $0.79 | $0.69 | $0.71 | $0.71 | $0.71 |
| 0109 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 12,900 | $1.01 | $1.25 | $0.91 | $0.91 | $0.91 |
| 0110 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 16,001 | $1.01 | $1.25 | $0.91 | $0.91 | $0.91 |
| 0111 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 174 | $15.25 | $20.00 | $13.73 | $13.73 | $13.73 |
| 0112 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 4 | $230.96 | $300.00 | $208.00 | $208.00 | $208.00 |
| 0113 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 13 | $96.88 | $50.00 | $5.41 | $12.50 | $25.00 |
| 0114 | Snowplowable raised pavement marker (808-75998) | EACH | 13 | $67.78 | $100.00 | $61.04 | $61.04 | $61.04 |
| 0115 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 6,124 | $1.52 | $1.30 | $1.37 | $1.37 | $1.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.