INDOT contract B-42777-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on March 11, 2026, Noble, Fort Wayne. 4 bids received; low bid $3,652,797 by R L McCoy Inc.
- Owner
- Indiana DOT
- Letting
- 11 MAR 2026
- Pay items
- 91
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R L McCoy Inc | $3,652,797 | Low |
| 2 | Milestone Contractors LP | $3,770,652 | +3.0% |
| 3 | Beaty Construction Inc | $4,344,713 | +19% |
| 4 | Phend & Brown Inc | $4,801,317 | +31% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R L McCoy Inc | 2. Milestone Contractors LP | 3. Beaty Construction Inc | 4. Phend & Brown Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $32,000 | $49,000 | $54,000 | $75,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $182,600 | $188,533 | $217,235 | $230,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $36,500 | $37,707 | $43,445 | $170,000 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $415,000 | $147,198 | $383,176 | $200,000 |
| 0012 | Excavation, common (203-02000) | CYS | 1,250 | $24.00 | $24.00 | $18.25 | $55.00 |
| 0013 | Borrow (203-02070) | CYS | 27,550 | $20.00 | $20.00 | $31.00 | $24.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 57,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $18,000 | $1,500.00 | $38,000 | $13,500 |
| 0016 | SWQCP preparation (205-12618) | LS | 1 | $3,400.00 | $1,400.00 | $5,000.00 | $3,400.00 |
| 0017 | Excavation, foundation, unclassified (206-51230) | CYS | 1,651 | $20.00 | $20.00 | $33.00 | $22.00 |
| 0018 | Subgrade treatment, type II (207-08264) | SYS | 485 | $29.00 | $29.00 | $18.75 | $32.00 |
| 0019 | Subgrade treatment, type III (207-08266) | SYS | 4,075 | $4.00 | $4.00 | $2.00 | $3.00 |
| 0020 | B borrow (211-02050) | CYS | 1,435 | $50.00 | $130.00 | $72.50 | $120.00 |
| 0021 | Structure backfill, type 1 (211-09264) | CYS | 35 | $65.00 | $65.00 | $74.50 | $45.00 |
| 0022 | Structure backfill, type 3 (211-09266) | CYS | 1,755 | $86.00 | $145.00 | $72.50 | $120.00 |
| 0023 | Geotextile for pavement, type 2B (214-12239) | SYS | 1,586 | $5.50 | $5.20 | $4.50 | $5.50 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 486 | $75.00 | $75.00 | $117.25 | $98.00 |
| 0025 | Subbase for PCCP (302-06464) | CYS | 34 | $200.00 | $200.00 | $163.00 | $150.00 |
| 0026 | Compacted aggregate, no. 53 (303-01180) | TON | 595 | $38.00 | $38.00 | $48.25 | $50.00 |
| 0027 | QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001) | TON | 295 | $115.00 | $115.00 | $115.00 | $130.00 |
| 0028 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 505 | $95.00 | $95.00 | $95.00 | $110.00 |
| 0029 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 830 | $86.00 | $86.00 | $86.00 | $102.00 |
| 0030 | Joint adhesive (401-11526) | LFT | 4,000 | $0.47 | $0.47 | $0.47 | $1.00 |
| 0031 | Asphalt for tack coat (406-05521) | SYS | 7,225 | $0.33 | $0.33 | $0.33 | $1.00 |
| 0032 | Guardrail, remove (601-02241) | LFT | 100 | $7.00 | $7.00 | $20.00 | $24.00 |
| 0033 | Guardrail terminal system, W-beam, curved, type 7 (601-05071) | EACH | 1 | $3,500.00 | $3,500.00 | $3,200.00 | $3,300.00 |
| 0034 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 144 | $25.00 | $25.00 | $22.00 | $24.00 |
| 0035 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,250.00 | $1,250.00 | $1,135.00 | $1,000.00 |
| 0036 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,425.00 | $3,425.00 | $3,350.00 | $3,600.00 |
| 0037 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,175.00 | $3,175.00 | $2,275.00 | $3,100.00 |
| 0038 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 132 | $275.00 | $155.00 | $205.00 | $155.00 |
| 0039 | HMA for approaches, type B (610-07487) | TON | 194 | $115.00 | $115.00 | $115.00 | $115.00 |
| 0040 | Mailbox assembly, single (611-06497) | EACH | 3 | $315.00 | $315.00 | $250.00 | $500.00 |
| 0041 | Monument, type B (615-06505) | EACH | 2 | $1,155.00 | $1,155.00 | $1,700.00 | $1,200.00 |
| 0042 | Riprap, revetment (616-06405) | TON | 130 | $67.00 | $67.00 | $70.00 | $165.00 |
| 0043 | Geotextile for riprap, type 1A (616-12246) | SYS | 235 | $7.00 | $7.00 | $6.00 | $20.00 |
| 0044 | Clean steel bridge, QP-2, bridge no. 1 (619-11052) | LS | 1 | $60,000 | $40,000 | $60,000 | $60,000 |
| 0045 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $30,000 | $15,000 | $30,000 | $30,000 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $500.00 | $650.00 | $650.00 |
| 0047 | Erosion control blanket (621-02770) | SYS | 3,000 | $2.75 | $2.75 | $1.52 | $2.00 |
| 0048 | Seed mixture, type R (621-06553) | LBS | 345 | $9.25 | $9.25 | $7.38 | $7.38 |
| 0049 | Mulching material (621-06565) | TON | 3 | $750.00 | $750.00 | $622.00 | $622.00 |
| 0050 | Water (621-06567) | KGAL | 7 | $1.00 | $1.00 | $10.00 | $10.00 |
| 0051 | Topsoil (621-06570) | CYS | 30 | $100.00 | $100.00 | $75.00 | $100.00 |
| 0052 | Sodding (621-06574) | SYS | 1,845 | $6.75 | $6.75 | $6.65 | $6.65 |
| 0053 | Field office, type C (628-09403) | MOS | 20 | $2,860.00 | $3,200.00 | $3,800.00 | $3,800.00 |
| 0054 | Computer system equipment (628-11976) | EACH | 1 | $850.00 | $1,000.00 | $1,500.00 | $650.00 |
| 0055 | Topsoil processing and distribution (629-000149) | SYS | 9,825 | $10.25 | $10.25 | $3.00 | $7.50 |
| 0056 | Topsoil amendment budget (629-000150) | DOL | 19,650 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0057 | Test pile, indicator, production (701-09558) | LFT | 135 | $140.00 | $110.00 | $58.50 | $100.00 |
| 0058 | Test pile, indicator, restrike (701-09560) | EACH | 2 | $3,000.00 | $2,600.00 | $2,000.00 | $2,500.00 |
| 0059 | Pile, steel pipe, 0.312 in., diameter 14 in. (701-09663) | LFT | 575 | $98.00 | $99.00 | $123.75 | $70.00 |
| 0060 | Conical pile tip, 14 in. (701-09679) | EACH | 12 | $500.00 | $550.00 | $325.00 | $400.00 |
| 0061 | Concrete, A, substructure (702-51005) | CYS | 24 | $1,250.00 | $1,500.00 | $1,275.00 | $860.00 |
| 0062 | Reinforcing bars, epoxy coated (703-06029) | LBS | 39,041 | $1.60 | $2.00 | $1.60 | $1.45 |
| 0063 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 26 | $64.00 | $51.00 | $47.75 | $60.00 |
| 0064 | Concrete, C, superstructure (704-51002) | CYS | 111.20 | $1,500.00 | $1,600.00 | $1,400.00 | $1,200.00 |
| 0065 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $9,000.00 | $2,500.00 | $4,850.00 | $4,000.00 |
| 0066 | Railing, steel type PF-1 , modified (706-11404) | LFT | 244 | $265.00 | $282.00 | $563.00 | $350.00 |
| 0067 | Railing, concrete type PF-1 (706-11602) | CYS | 14 | $2,200.00 | $1,000.00 | $1,875.00 | $2,200.00 |
| 0068 | Structural member, concrete, bulb-T beam, 42 in. X 49 in. (707-08158) | LFT | 450 | $720.00 | $950.00 | $1,015.00 | $1,585.00 |
| 0069 | Repair , historical trusses, STR. no. 1 (708-05394) | LS | 1 | $75,000 | $25,000 | $75,000 | $15,402 |
| 0070 | Structural steel (711-51035) | LBS | 255 | $40.00 | $23.00 | $40.00 | $60.40 |
| 0071 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 200 | $40.00 | $19.00 | $7.00 | $4.50 |
| 0072 | Pipe, type 3, circular, diameter 12 in. (715-05168) | LFT | 50 | $72.00 | $72.00 | $74.00 | $125.00 |
| 0073 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 275 | $74.00 | $74.00 | $82.00 | $75.00 |
| 0074 | Pipe, slotted drain, diameter 15 in. , .064 in. (715-05423) | LFT | 50 | $350.00 | $350.00 | $255.00 | $275.00 |
| 0075 | Pipe end section, diameter 15 in. (715-46005) | EACH | 4 | $950.00 | $950.00 | $1,025.00 | $1,800.00 |
| 0076 | Geotextile for underdrains, type 1B (718-12306) | SYS | 180 | $5.00 | $11.00 | $6.00 | $7.00 |
| 0077 | Aggregate for underdrains (718-52610) | CYS | 24 | $200.00 | $160.00 | $53.00 | $120.00 |
| 0078 | Inlet, type E7 (720-45030) | EACH | 3 | $3,200.00 | $3,200.00 | $2,800.00 | $4,500.00 |
| 0079 | Inlet, type F7 (720-45035) | EACH | 1 | $3,000.00 | $3,000.00 | $2,800.00 | $5,000.00 |
| 0080 | Longitudinal grooving (722-12732) | SYS | 434 | $13.00 | $8.50 | $11.00 | $8.07 |
| 0081 | Face panels, concrete (731-93945) | SFT | 3,105 | $111.00 | $145.00 | $120.00 | $111.00 |
| 0082 | Wall erection (731-93946) | SFT | 3,105 | $21.00 | $35.00 | $21.00 | $38.00 |
| 0083 | Leveling pad, concrete (731-93947) | LFT | 340 | $50.00 | $90.00 | $47.50 | $32.00 |
| 0084 | Road closure sign assembly (801-04308) | EACH | 4 | $350.00 | $350.00 | $175.00 | $390.00 |
| 0085 | Detour route marker assembly (801-06625) | EACH | 10 | $175.00 | $175.00 | $85.00 | $237.00 |
| 0086 | Construction sign, type A (801-06640) | EACH | 4 | $225.00 | $225.00 | $175.00 | $306.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $2,500.00 | $12,695 | $185,000 | $485,000 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 48 | $18.00 | $18.00 | $25.00 | $23.10 |
| 0089 | Barricade, type III-B (801-07119) | LFT | 48 | $18.00 | $18.00 | $25.00 | $23.10 |
| 0090 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 3,250 | $0.40 | $0.40 | $0.75 | $1.00 |
| 0091 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 3,250 | $0.40 | $0.40 | $0.75 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of March 11, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.