INDOT contract R-43185-A bid tabulation
HMA OVERLAY, PREVENTIVE MAINTENANCE. Let by Indiana DOT on July 9, 2025, Noble, Fort Wayne. 4 bids received; low bid $1,953,029 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 09 JUL 2025
- Pay items
- 98
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $1,953,029 | Low |
| 2 | Phend & Brown Inc | $1,961,989 | 0.0% |
| 3 | Brooks Construction Company Inc | $1,983,026 | +2.0% |
| 4 | Milestone Contractors LP | $2,052,974 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Phend & Brown Inc | 3. Brooks Construction Company Inc | 4. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,200.00 | $19,500 | $15,000 | $15,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 5 | $1,057.44 | $400.00 | $1,000.00 | $950.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $97,650 | $71,420 | $95,000 | $104,400 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $19,530 | $18,850 | $15,000 | $15,000 |
| 0013 | Curb, concrete, remove (202-02278) | LFT | 210 | $29.86 | $22.25 | $15.00 | $32.00 |
| 0014 | Curb and gutter, remove (202-02279) | LFT | 12 | $94.26 | $37.00 | $15.00 | $57.00 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 8 | $141.39 | $70.00 | $17.00 | $163.00 |
| 0016 | Inlet, remove (202-91385) | EACH | 18 | $991.31 | $2,000.00 | $450.00 | $800.00 |
| 0017 | Pipe, remove (202-96133) | LFT | 64 | $176.24 | $120.00 | $29.66 | $179.00 |
| 0018 | Excavation, common (203-02000) | CYS | 1,733 | $20.00 | $72.00 | $43.68 | $37.00 |
| 0019 | Linear grading (203-08607) | LFT | 7,209 | $4.03 | $2.00 | $13.36 | $2.00 |
| 0020 | Stormwater management budget (205-12108) | DOL | 4,485 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $4,375.55 | $3,650.00 | $1,000.00 | $2,000.00 |
| 0022 | Subgrade treatment, type II (207-08264) | SYS | 906 | $3.00 | $35.00 | $19.00 | $30.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 4,449 | $38.00 | $40.00 | $37.00 | $50.00 |
| 0024 | B borrow (211-02050) | CYS | 75 | $52.29 | $55.00 | $70.00 | $50.00 |
| 0025 | Geogrid, type IB (214-11796) | SYS | 5,354 | $1.00 | $3.25 | $3.50 | $1.74 |
| 0026 | Compacted aggregate, no. 73 (303-07449) | TON | 351 | $50.00 | $78.00 | $60.00 | $58.00 |
| 0027 | HMA patching, full depth, type C (304-12625) | TON | 455 | $400.00 | $285.00 | $250.00 | $283.00 |
| 0028 | HMA patching, partial depth, type C (304-12626) | TON | 69 | $400.00 | $380.00 | $250.00 | $270.00 |
| 0029 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 43,191 | $2.45 | $2.16 | $1.90 | $1.25 |
| 0030 | Milling, asphalt, 4 in. (306-08038) | SYS | 310 | $1.00 | $6.61 | $13.55 | $20.00 |
| 0031 | Milling, approach (306-08432) | SYS | 2,373 | $5.00 | $14.15 | $5.00 | $1.25 |
| 0032 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 3,931 | $105.00 | $100.00 | $97.00 | $112.00 |
| 0033 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 612 | $100.00 | $111.00 | $102.00 | $120.00 |
| 0034 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,958 | $90.00 | $92.00 | $84.00 | $94.00 |
| 0035 | Joint adhesive, surface (401-10258) | LFT | 26,177 | $0.50 | $0.50 | $0.28 | $0.35 |
| 0036 | Joint adhesive, intermediate (401-10259) | LFT | 3,115 | $0.50 | $0.50 | $0.54 | $0.35 |
| 0037 | Asphalt for tack coat (406-05520) | TON | 14 | $650.00 | $750.00 | $750.00 | $850.00 |
| 0038 | Cracks in asphalt pavement, fill (408-12028) | TON | 5 | $750.00 | $550.00 | $1,900.00 | $750.00 |
| 0039 | Sidewalk, concrete (604-06070) | SYS | 8 | $384.43 | $200.00 | $150.00 | $400.00 |
| 0040 | Curb, concrete (605-06120) | LFT | 210 | $47.57 | $62.00 | $70.00 | $150.00 |
| 0041 | Curb and gutter, concrete (605-06140) | LFT | 12 | $267.33 | $60.00 | $90.00 | $135.00 |
| 0042 | HMA for approaches, type C (610-07488) | TON | 196 | $223.09 | $230.00 | $150.00 | $270.00 |
| 0043 | Monument, type B (615-06505) | EACH | 3 | $1,500.00 | $1,525.00 | $1,500.00 | $1,525.00 |
| 0044 | Casting adjust to grade, monument (615-06525) | EACH | 2 | $1,750.00 | $1,825.00 | $1,750.00 | $1,825.00 |
| 0045 | Riprap, revetment (616-06405) | TON | 2 | $14.50 | $485.00 | $230.59 | $525.00 |
| 0046 | Geotextile for riprap, type 1A (616-12246) | SYS | 2 | $52.93 | $360.00 | $5.00 | $425.00 |
| 0047 | Field office, type A (628-09401) | MOS | 11 | $3,600.00 | $2,500.00 | $3,565.00 | $2,285.00 |
| 0048 | Safety metal end section, 4:1, diameter 12 in. (715-04611) | EACH | 1 | $1,331.25 | $1,875.00 | $1,500.00 | $2,500.00 |
| 0049 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 64 | $179.34 | $205.00 | $120.00 | $130.00 |
| 0050 | HMA for structure installation, type C (715-08306) | TON | 44 | $472.00 | $195.00 | $200.00 | $335.00 |
| 0051 | Casting, inlet, adjust to grade (720-12797) | EACH | 10 | $1,180.02 | $2,025.00 | $1,200.00 | $1,000.00 |
| 0052 | Casting, manhole, adjust to grade (720-12798) | EACH | 6 | $1,903.97 | $2,025.00 | $820.00 | $600.00 |
| 0053 | Inlet, type J10 (720-45045) | EACH | 17 | $4,199.36 | $4,950.00 | $4,200.00 | $7,500.00 |
| 0054 | Structure, manhole, reconstructed (720-45605) | LFT | 14 | $3,878.06 | $1,105.00 | $1,200.00 | $1,400.00 |
| 0055 | Casting, water valve, adjust to grade (720-94840) | EACH | 10 | $859.60 | $855.00 | $425.00 | $65.00 |
| 0056 | Inlet, type B15 (720-98174) | EACH | 1 | $4,084.37 | $6,875.00 | $4,800.00 | $8,300.00 |
| 0057 | Temporary pavement message marking, 'R X R' (801-01506) | EACH | 2 | $619.00 | $75.00 | $600.00 | $619.00 |
| 0058 | Road closure sign assembly (801-04308) | EACH | 19 | $288.00 | $335.00 | $288.00 | $288.00 |
| 0059 | Temporary pavement marking, 6 in. (801-06206) | LFT | 13,226 | $0.39 | $0.34 | $0.40 | $0.78 |
| 0060 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 13,793 | $1.81 | $3.00 | $1.80 | $0.01 |
| 0061 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 1 | $179.00 | $5.00 | $170.00 | $179.00 |
| 0062 | Temporary pavement message marking, removable, (RXR) (801-06213) | EACH | 2 | $989.00 | $70.00 | $900.00 | $989.00 |
| 0063 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 52 | $12.88 | $0.50 | $13.00 | $12.88 |
| 0064 | Detour route marker assembly (801-06625) | EACH | 52 | $169.00 | $105.00 | $169.00 | $169.00 |
| 0065 | Construction sign, type A (801-06640) | EACH | 32 | $219.00 | $140.00 | $219.00 | $219.00 |
| 0066 | Construction sign, type B (801-06645) | EACH | 26 | $109.00 | $45.00 | $109.00 | $109.00 |
| 0067 | Maintaining traffic (801-06775) | LS | 1 | $16,900 | $22,500 | $148,842 | $87,995 |
| 0068 | Barricade, type III-A (801-07118) | LFT | 360 | $15.44 | $12.00 | $15.44 | $15.44 |
| 0069 | Barricade, type III-B (801-07119) | LFT | 288 | $15.44 | $12.00 | $15.44 | $15.44 |
| 0070 | Portable changeable message sign (801-11642) | EACH | 2 | $4,965.00 | $4,965.00 | $4,965.00 | $4,965.00 |
| 0071 | Temporary curb ramp (801-11990) | EACH | 2 | $1,351.32 | $4,650.00 | $3,000.00 | $1,000.00 |
| 0072 | Temporary pedestrian channelizer (801-12862) | LFT | 40 | $29.55 | $40.00 | $30.00 | $30.00 |
| 0073 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0074 | Wireless magnetometer detector (805-10107) | EACH | 2 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0075 | Conduit, steel, galvanized, 2 in. (807-06592) | LFT | 110 | $40.00 | $40.00 | $40.00 | $40.00 |
| 0076 | Wire, no. 6 copper, 1/C (807-11712) | LFT | 1,700 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0077 | Connector kit, fused (807-86915) | EACH | 8 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0078 | Line, remove (808-06716) | LFT | 216 | $2.11 | $0.50 | $2.11 | $2.11 |
| 0079 | Retro-reflectivity testing (808-09381) | LS | 1 | $3,000.00 | $500.00 | $3,000.00 | $3,000.00 |
| 0080 | Grooving for pavement markings (808-12032) | LFT | 25,207 | $0.88 | $0.10 | $0.88 | $0.88 |
| 0081 | Transverse marking, thermoplastic, parking line, white, 4 in. (808-12273) | LFT | 690 | $2.34 | $1.00 | $2.34 | $2.34 |
| 0082 | Transverse marking, thermoplastic, parking line, blue 4 in. (808-12274) | LFT | 99 | $4.89 | $1.00 | $4.89 | $4.89 |
| 0083 | Curb painting , yellow (808-12448) | LFT | 24 | $4.11 | $0.85 | $4.11 | $4.11 |
| 0084 | Line, thermoplastic, solid, yellow, 10 in. (808-12858) | LFT | 3,717 | $2.44 | $0.50 | $2.44 | $2.44 |
| 0085 | Transverse marking, thermoplastic, crosswalk line, white, 12 in. (808-74815) | LFT | 1,092 | $5.19 | $2.50 | $5.19 | $5.19 |
| 0086 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 7,355 | $1.14 | $1.25 | $1.14 | $1.14 |
| 0087 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 13,295 | $1.14 | $1.00 | $1.14 | $1.14 |
| 0088 | Transverse marking, thermoplastic, crosshatch line, yellow, 24 in. (808-75290) | LFT | 481 | $13.88 | $2.50 | $13.88 | $13.88 |
| 0089 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 82 | $13.88 | $3.15 | $13.88 | $13.88 |
| 0090 | Pavement message marking, thermoplastic, RXR (808-75340) | EACH | 2 | $1,288.00 | $50.00 | $1,288.00 | $1,288.00 |
| 0091 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 148 | $18.55 | $4.20 | $41.61 | $13.00 |
| 0092 | Snowplowable raised pavement marker (808-75998) | EACH | 148 | $35.65 | $25.00 | $35.65 | $35.65 |
| 0093 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 840 | $3.11 | $1.00 | $3.11 | $3.11 |
| 0094 | Pavement message marking, thermoplastic, ADA accessible symbol (808-97664) | EACH | 1 | $522.00 | $50.00 | $522.00 | $522.00 |
| 0095 | Transverse marking, thermoplastic, crosshatch line, yellow, 6 in. (808-98875) | LFT | 74 | $5.44 | $2.50 | $5.44 | $5.44 |
| 0096 | Structure backfill, type 2 (211-09265) | CYS | 18 | $60.00 | $63.00 | $50.00 | $225.00 |
| 0097 | Water (621-06567) | KGAL | 1 | $1.00 | $25.00 | $1.00 | $1.00 |
| 0098 | Sodding, nursery (621-06575) | SYS | 51 | $55.00 | $96.25 | $55.00 | $55.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of July 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.