INDOT contract B-44548-A bid tabulation
BRIDGE REPLACEMENT AND REHABILITATION. Let by Indiana DOT on November 5, 2026, Huntington, Fort Wayne. 5 bids received; low bid $1,572,250 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 84
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $1,572,250 | Low |
| 2 | Brooks Construction Company Inc | $1,581,090 | +1.0% |
| 3 | Morphey Construction Inc. | $1,684,000 | +7.0% |
| 4 | Pioneer Associates Inc | $1,690,575 | +8.0% |
| 5 | Milestone Contractors LP | $1,741,197 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Brooks Construction Company Inc | 3. Morphey Construction Inc. | 4. Pioneer Associates Inc | 5. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $20,000 | $25,000 | $25,000 | $20,000 | $32,620 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $84,000 | $75,000 | $84,200 | $115,000 | $87,060 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $4,999.65 | $15,000 | $34,360 | $12,500 | $17,412 |
| 0012 | Present structure, remove portions, structure no. 2 (202-51328) | LS | 1 | $95,000 | $150,000 | $40,000 | $86,900 | $88,297 |
| 0013 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $25,000 | $100,000 | $16,000 | $16,500 | $45,671 |
| 0014 | Pipe, remove (202-96133) | LFT | 92 | $25.00 | $20.00 | $12.00 | $20.00 | $18.00 |
| 0015 | Excavation, common (203-02000) | CYS | 265 | $75.00 | $95.00 | $65.00 | $50.00 | $85.00 |
| 0016 | Linear grading (203-08607) | LFT | 387 | $8.00 | $20.00 | $30.00 | $6.00 | $7.00 |
| 0017 | Excavation, waterway (203-51223) | CYS | 95 | $75.00 | $95.00 | $130.00 | $65.00 | $150.00 |
| 0018 | Pump around (205-11626) | EACH | 1 | $25,000 | $15,000 | $10,000 | $26,000 | $26,000 |
| 0019 | Stormwater management budget (205-12108) | DOL | 8,100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0020 | Stormwater management implementation (205-12616) | LS | 1 | $3,500.00 | $5,000.00 | $5,000.00 | $750.00 | $4,340.31 |
| 0021 | Excavation, foundation, unclassified (206-51230) | CYS | 10 | $250.00 | $120.00 | $230.00 | $110.00 | $190.00 |
| 0022 | Cofferdam , bridge no. 2 (206-51235) | LS | 1 | $10,000 | $45,000 | $10,000 | $18,500 | $45,000 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 1,133 | $50.00 | $43.00 | $40.00 | $50.00 | $52.00 |
| 0024 | Structure backfill, type 4 (211-09267) | CYS | 11 | $250.00 | $465.00 | $300.00 | $300.00 | $362.00 |
| 0025 | Structure backfill, type 5 (211-09268) | CYS | 630 | $250.00 | $175.00 | $225.00 | $200.00 | $176.00 |
| 0026 | Geotextile for pavement, type 2A (214-12238) | SYS | 628 | $3.00 | $4.50 | $5.00 | $5.00 | $5.50 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 616 | $3.00 | $7.00 | $5.00 | $5.00 | $5.50 |
| 0028 | Compacted aggregate, no. 8 (301-12233) | CYS | 100 | $110.00 | $103.00 | $150.00 | $110.00 | $179.00 |
| 0029 | Compacted aggregate, no. 53 (301-12234) | CYS | 4 | $250.00 | $114.00 | $500.00 | $115.00 | $455.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 144 | $60.00 | $57.00 | $130.00 | $60.00 | $78.00 |
| 0031 | Widening with HMA, type B (304-07493) | TON | 238 | $120.00 | $175.00 | $200.00 | $155.00 | $151.00 |
| 0032 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 506 | $15.00 | $6.00 | $17.00 | $12.00 | $16.00 |
| 0033 | Milling, transition (306-08043) | SYS | 586 | $15.00 | $6.00 | $10.00 | $6.00 | $8.50 |
| 0034 | Lean concrete base, 9 in. (309-12695) | SYS | 183 | $70.00 | $125.00 | $150.00 | $105.00 | $74.00 |
| 0035 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 172 | $250.00 | $100.00 | $223.00 | $122.00 | $122.00 |
| 0036 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 67 | $250.00 | $100.00 | $236.00 | $120.00 | $120.00 |
| 0037 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 154 | $135.00 | $84.00 | $131.00 | $115.00 | $115.00 |
| 0038 | Joint adhesive (401-11526) | LFT | 1,890 | $0.50 | $0.25 | $1.00 | $0.50 | $0.50 |
| 0039 | Asphalt for tack coat (406-05520) | TON | 2 | $1.00 | $650.00 | $1.00 | $800.00 | $800.00 |
| 0040 | Cracks and joints in asphalt pavement, rout and seal (408-07478) | TON | 2 | $500.00 | $2,000.00 | $500.00 | $2,000.00 | $2,000.00 |
| 0041 | Guardrail, remove (601-02241) | LFT | 384 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 0042 | Hand dig guardrail post holes (601-09238) | EACH | 60 | $118.00 | $118.00 | $118.00 | $118.00 | $118.00 |
| 0043 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 75 | $29.00 | $29.00 | $29.00 | $29.00 | $29.00 |
| 0044 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 | $3,450.00 |
| 0045 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,855.00 | $2,855.00 | $2,855.00 | $4,000.00 | $2,855.00 |
| 0046 | Barrier delineator (602-06729) | EACH | 10 | $20.00 | $30.00 | $42.80 | $18.00 | $22.65 |
| 0047 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 340 | $10.00 | $24.00 | $10.00 | $6.00 | $28.50 |
| 0048 | Reinforced concrete bridge approach, 10 in. (609-06257) | SYS | 187 | $175.00 | $225.00 | $180.00 | $215.00 | $195.00 |
| 0049 | Grout for riprap (616-02281) | CYS | 24 | $450.00 | $425.00 | $435.00 | $400.00 | $390.00 |
| 0050 | Riprap, revetment (616-06405) | TON | 431 | $80.00 | $130.00 | $140.00 | $65.00 | $134.00 |
| 0051 | Geotextile for riprap, type 1A (616-12246) | SYS | 519 | $3.00 | $5.00 | $5.00 | $4.00 | $8.50 |
| 0052 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $425.00 | $425.00 | $1,500.00 | $425.00 | $425.00 |
| 0053 | Erosion control blanket (621-02770) | SYS | 948 | $2.64 | $2.64 | $10.00 | $3.00 | $2.64 |
| 0054 | Mulched seeding, type R (621-06559) | SYS | 867 | $3.60 | $3.60 | $12.00 | $4.00 | $3.60 |
| 0055 | Sodding (621-06574) | SYS | 20 | $84.25 | $84.25 | $125.00 | $85.00 | $84.25 |
| 0056 | Seed mixture, floodplain (621-12612) | LBS | 14 | $195.00 | $195.00 | $200.00 | $195.00 | $195.00 |
| 0057 | Field office, type D (628-12683) | MOS | 12 | $2,200.00 | $4,000.00 | $3,600.00 | $5,000.00 | $4,600.00 |
| 0058 | Field drilled hole in concrete (702-51863) | EACH | 352 | $20.00 | $30.00 | $50.00 | $25.00 | $13.00 |
| 0059 | Reinforcing bars, epoxy coated (703-06029) | LBS | 35,626 | $2.50 | $1.55 | $2.00 | $2.00 | $2.50 |
| 0060 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 8 | $68.00 | $90.00 | $180.00 | $115.00 | $93.00 |
| 0061 | Concrete, C, superstructure (704-51002) | CYS | 43.80 | $1,400.00 | $1,900.00 | $3,000.00 | $3,800.00 | $2,500.00 |
| 0062 | Railing, concrete type FC , modified (706-11600) | CYS | 18.90 | $1,000.00 | $770.00 | $770.00 | $1,000.00 | $1,260.00 |
| 0063 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $5,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,400.00 |
| 0064 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $10,000 | $500.00 | $4,090.00 | $2,000.00 | $2,000.00 |
| 0065 | Patching concrete structures (710-09158) | SFT | 165 | $10.00 | $10.00 | $50.00 | $80.00 | $125.00 |
| 0066 | Waterproofing membrane, type 2 (714-000086) | SFT | 2,688 | $2.00 | $4.00 | $3.00 | $4.00 | $4.00 |
| 0067 | Waterproofing membrane, type 3 (714-000087) | SFT | 2,352 | $2.00 | $6.00 | $9.00 | $10.00 | $4.25 |
| 0068 | Structure, coated reinforced concrete, box sections, 19 FT X 10 FT (714-12394) | LFT | 112 | $2,700.00 | $2,000.00 | $2,900.00 | $3,000.00 | $3,200.00 |
| 0069 | Bridge deck overlay, rigid (722-000134) | SYS | 338 | $145.00 | $105.00 | $150.00 | $150.00 | $115.00 |
| 0070 | Hydrodemolition (722-01066) | SYS | 288 | $145.00 | $140.00 | $15.00 | $150.00 | $145.00 |
| 0071 | Bridge deck overlay budget (722-12380) | DOL | 7,900 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0072 | Bridge deck, remove concrete surface (722-12464) | SYS | 288 | $18.00 | $16.00 | $12.00 | $20.00 | $16.50 |
| 0073 | Longitudinal grooving (722-12732) | SYS | 514 | $11.00 | $11.00 | $20.00 | $8.00 | $9.35 |
| 0074 | Bridge deck patching, full depth (722-51401) | SFT | 50 | $25.00 | $15.00 | $125.00 | $55.00 | $73.00 |
| 0075 | Road closure sign assembly (801-04308) | EACH | 17 | $225.00 | $250.00 | $175.00 | $240.00 | $250.00 |
| 0076 | Detour route marker assembly (801-06625) | EACH | 62 | $137.00 | $175.00 | $75.00 | $140.00 | $175.00 |
| 0077 | Construction sign, type A (801-06640) | EACH | 28 | $168.00 | $200.00 | $175.00 | $180.00 | $200.00 |
| 0078 | Maintaining traffic (801-06775) | LS | 1 | $59,282 | $28,348 | $69,418 | $29,850 | $22,000 |
| 0079 | Barricade, type III-A (801-07118) | LFT | 311 | $12.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0080 | Barricade, type III-B (801-07119) | LFT | 208 | $13.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 0081 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $245.00 | $245.00 | $160.00 | $245.00 | $245.00 |
| 0082 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 1,285 | $2.00 | $0.35 | $1.00 | $1.00 | $0.35 |
| 0083 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 1,284 | $2.00 | $0.35 | $1.00 | $1.00 | $0.35 |
| 0084 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 5 | $77.09 | $75.00 | $5.00 | $25.00 | $57.17 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.