INDOT contract R-41954-A bid tabulation
INTERSECTION IMPROVEMENT, ROUNDABOUT. Let by Indiana DOT on February 11, 2026, Steuben, Fort Wayne. 4 bids received; low bid $2,283,875 by Brooks Construction Company Inc.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 114
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Brooks Construction Company Inc | $2,283,875 | Low |
| 2 | Fleming Excavating Inc | $2,370,573 | +4.0% |
| 3 | E & B Paving LLC | $2,480,197 | +9.0% |
| 4 | Api Construction Corp | $2,513,775 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Brooks Construction Company Inc | 2. Fleming Excavating Inc | 3. E & B Paving LLC | 4. Api Construction Corp |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $50,000 | $28,426 | $55,000 | $60,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 6 | $800.00 | $1,200.00 | $1,140.00 | $600.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Mobilization and demobilization (110-01001) | LS | 1 | $114,000 | $113,664 | $124,000 | $100,000 |
| 0012 | Clearing right-of-way (201-52370) | LS | 1 | $68,000 | $84,086 | $74,000 | $75,000 |
| 0013 | Excavation, common (203-02000) | CYS | 8,213 | $40.00 | $28.95 | $38.00 | $34.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 34,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $1,500.00 | $50,600 | $7,000.00 | $4,000.00 |
| 0016 | SWQCP preparation (205-12618) | LS | 1 | $3,600.00 | $3,300.00 | $3,600.00 | $4,000.00 |
| 0017 | Subgrade treatment, type II (207-08264) | SYS | 622 | $21.00 | $35.29 | $25.00 | $23.00 |
| 0018 | Subgrade treatment, type IC (207-09935) | SYS | 49 | $43.00 | $36.22 | $50.00 | $33.00 |
| 0019 | Subgrade treatment, type ibc (207-12635) | SYS | 6,993 | $14.00 | $14.87 | $13.91 | $16.00 |
| 0020 | Structure backfill, type 1 (211-09264) | CYS | 1,048 | $45.00 | $67.54 | $50.00 | $72.00 |
| 0021 | Geogrid, type IB (214-11796) | SYS | 367 | $4.65 | $3.94 | $3.00 | $3.00 |
| 0022 | Geotextile for pavement, type 2A (214-12238) | SYS | 823 | $4.00 | $5.06 | $2.50 | $5.00 |
| 0023 | Compacted aggregate, no. 5 (301-12232) | CYS | 69 | $120.00 | $99.84 | $35.00 | $108.00 |
| 0024 | Compacted aggregate, no. 53 (301-12234) | CYS | 1,592 | $65.00 | $74.16 | $68.00 | $80.00 |
| 0025 | Dense graded subbase (302-07455) | CYS | 93 | $120.00 | $15.00 | $80.00 | $120.00 |
| 0026 | Compacted aggregate, no. 73 (303-07449) | TON | 34 | $55.00 | $49.15 | $55.00 | $84.00 |
| 0027 | HMA patching, full depth, type C (304-12625) | TON | 33 | $135.00 | $345.00 | $420.00 | $166.00 |
| 0028 | Milling, asphalt, 4 in. (306-08038) | SYS | 403 | $14.00 | $11.46 | $22.70 | $20.00 |
| 0029 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 419 | $120.00 | $140.80 | $128.00 | $130.00 |
| 0030 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 695 | $100.00 | $108.00 | $100.00 | $92.00 |
| 0031 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 1,904 | $90.00 | $97.20 | $90.00 | $94.00 |
| 0032 | Joint adhesive (401-11526) | LFT | 1,308 | $0.50 | $1.15 | $1.00 | $2.00 |
| 0033 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 1,302 | $12.45 | $5.02 | $4.56 | $4.00 |
| 0034 | Asphalt for tack coat (406-05520) | TON | 3 | $600.00 | $787.75 | $685.00 | $800.00 |
| 0035 | PCCP, 9 in. (502-06457) | SYS | 550 | $115.00 | $155.00 | $144.00 | $170.00 |
| 0036 | PCCP, 4 in. (502-11543) | SYS | 353 | $95.00 | $111.24 | $103.00 | $118.00 |
| 0037 | D-1 contraction joint (503-05240) | LFT | 264 | $20.00 | $51.70 | $47.00 | $30.00 |
| 0038 | Curb ramp, concrete (604-08086) | SYS | 31 | $250.00 | $285.00 | $285.00 | $300.00 |
| 0039 | Curb, concrete (605-06120) | LFT | 842 | $40.00 | $60.50 | $60.00 | $60.00 |
| 0040 | Curb and gutter, concrete (605-06140) | LFT | 1,550 | $30.00 | $59.40 | $55.00 | $60.00 |
| 0041 | Curb and gutter, concrete, type B , modified, rolled curb (605-06145) | LFT | 418 | $56.00 | $56.10 | $51.00 | $60.00 |
| 0042 | Curb and gutter, concrete, type B , modified, sloping rolled curb (605-06145) | LFT | 330 | $62.00 | $55.00 | $50.00 | $60.00 |
| 0043 | Center curb, concrete, type D (605-06215) | LFT | 24 | $115.00 | $179.30 | $163.00 | $140.00 |
| 0044 | HMA for approaches, type B (610-07487) | TON | 26 | $170.00 | $605.00 | $550.00 | $160.00 |
| 0045 | PCCP for approaches, 6 in. (610-08446) | SYS | 136 | $100.00 | $102.30 | $98.00 | $144.00 |
| 0046 | PCCP for approaches, 9 in. (610-09108) | SYS | 367 | $115.00 | $106.92 | $115.00 | $172.00 |
| 0047 | Mailbox assembly, reset, single (611-08232) | EACH | 1 | $250.00 | $350.00 | $250.00 | $550.00 |
| 0048 | Monument, type B (615-06505) | EACH | 16 | $850.00 | $1,210.00 | $850.00 | $1,100.00 |
| 0049 | Monument, type C (615-06510) | EACH | 1 | $912.00 | $605.00 | $912.00 | $550.00 |
| 0050 | Monument, type D (615-06515) | EACH | 12 | $175.00 | $302.50 | $175.00 | $275.00 |
| 0051 | Riprap, revetment (616-06405) | TON | 7 | $125.00 | $65.50 | $245.00 | $108.00 |
| 0052 | Geotextile for riprap, type 1A (616-12246) | SYS | 7 | $10.00 | $5.71 | $70.00 | $6.00 |
| 0053 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $500.00 | $1,320.00 | $1,200.00 | $600.00 |
| 0054 | Mulched seeding, type U (621-06560) | SYS | 3,547 | $3.00 | $3.30 | $3.00 | $3.00 |
| 0055 | Topsoil (621-06570) | CYS | 404 | $70.00 | $53.75 | $50.00 | $80.00 |
| 0056 | Mulch (621-08538) | CYS | 218 | $125.00 | $108.00 | $100.00 | $155.00 |
| 0057 | Weed barrier (621-09273) | SYS | 480 | $3.75 | $2.20 | $2.00 | $4.00 |
| 0058 | Plant, deciduous shrub, 18 in. or under (622-05638) | EACH | 46 | $65.00 | $51.75 | $43.00 | $80.00 |
| 0059 | Plant, deciduous shrub, 24 in. to 36 in. (622-05640) | EACH | 7 | $95.00 | $58.65 | $51.00 | $125.00 |
| 0060 | Plant, perennial (622-05654) | EACH | 196 | $23.50 | $29.90 | $26.00 | $26.50 |
| 0061 | Field office, type C (628-09403) | MOS | 15 | $3,000.00 | $1,884.92 | $3,000.00 | $3,500.00 |
| 0062 | Topsoil processing and distribution (629-000149) | SYS | 3,547 | $3.50 | $7.59 | $1.28 | $4.00 |
| 0063 | Topsoil amendment budget (629-000150) | DOL | 7,094 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0064 | Pipe, type 2, circular, diameter 15 in. (715-05032) | LFT | 162 | $76.00 | $105.04 | $125.00 | $103.00 |
| 0065 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,021 | $70.00 | $75.83 | $118.00 | $100.00 |
| 0066 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 1,239 | $87.00 | $72.58 | $119.00 | $103.00 |
| 0067 | Video inspection for pipe (715-09064) | LFT | 2,422 | $1.35 | $1.55 | $1.35 | $2.00 |
| 0068 | Pipe end section, diameter 18 in. (715-46010) | EACH | 1 | $1,000.00 | $1,040.00 | $1,500.00 | $1,300.00 |
| 0069 | Force main , 2 inch HDD (715-98961) | LFT | 40 | $132.00 | $175.55 | $168.05 | $100.00 |
| 0070 | Air release valve (716-01382) | EACH | 2 | $6,000.00 | $14,235 | $14,235 | $10,500 |
| 0071 | Pipe installation, trenchless, 2 in. (716-09396) | LFT | 478 | $24.00 | $33.51 | $31.42 | $34.00 |
| 0072 | Manhole, type J15, modified (720-01092) | EACH | 1 | $5,100.00 | $5,280.00 | $7,200.00 | $6,100.00 |
| 0073 | Manhole, type C5 (720-08659) | EACH | 1 | $4,900.00 | $5,209.00 | $7,300.00 | $4,800.00 |
| 0074 | Manhole, type J5, modified (720-08660) | EACH | 1 | $4,900.00 | $6,032.00 | $6,800.00 | $6,300.00 |
| 0075 | Inlet, type F7 (720-45035) | EACH | 5 | $3,600.00 | $3,013.00 | $3,300.00 | $3,000.00 |
| 0076 | Inlet, type HA5 (720-45042) | EACH | 2 | $4,000.00 | $3,646.00 | $3,900.00 | $3,600.00 |
| 0077 | Catch basin, type E7 (720-45235) | EACH | 1 | $3,600.00 | $2,797.00 | $3,500.00 | $2,900.00 |
| 0078 | Manhole, type C4 (720-45410) | EACH | 1 | $4,250.00 | $3,751.00 | $6,200.00 | $3,800.00 |
| 0079 | Manhole, type C2 (720-90984) | EACH | 1 | $4,650.00 | $4,769.00 | $6,610.00 | $4,400.00 |
| 0080 | Inlet, type B15 (720-98174) | EACH | 7 | $4,150.00 | $3,619.00 | $4,150.00 | $3,800.00 |
| 0081 | Inlet, type C15 (720-98555) | EACH | 9 | $4,300.00 | $3,747.00 | $4,300.00 | $3,800.00 |
| 0082 | Construction sign, type D (801-03291) | EACH | 6 | $69.34 | $79.74 | $175.00 | $175.00 |
| 0083 | Road closure sign assembly (801-04308) | EACH | 8 | $271.00 | $311.65 | $300.00 | $300.00 |
| 0084 | Detour route marker assembly (801-06625) | EACH | 40 | $161.00 | $185.15 | $175.00 | $175.00 |
| 0085 | Construction sign, type A (801-06640) | EACH | 30 | $211.00 | $242.65 | $225.00 | $225.00 |
| 0086 | Construction sign, type B (801-06645) | EACH | 2 | $108.00 | $124.20 | $175.00 | $175.00 |
| 0087 | Maintaining traffic (801-06775) | LS | 1 | $81,708 | $18,000 | $47,042 | $50,000 |
| 0088 | Barricade, type III-A (801-07118) | LFT | 96 | $15.91 | $18.30 | $18.00 | $18.00 |
| 0089 | Barricade, type III-B (801-07119) | LFT | 96 | $15.91 | $18.30 | $18.00 | $18.00 |
| 0090 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 206 | $35.00 | $38.50 | $35.00 | $35.00 |
| 0091 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 110 | $21.00 | $24.15 | $21.00 | $21.00 |
| 0092 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 46 | $22.00 | $25.30 | $22.00 | $22.00 |
| 0093 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 348 | $21.50 | $23.22 | $21.50 | $21.00 |
| 0094 | Handhole, lighting (807-02191) | EACH | 6 | $1,950.00 | $2,106.00 | $1,950.00 | $1,950.00 |
| 0095 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,663 | $17.75 | $19.17 | $17.75 | $18.00 |
| 0096 | Light pole, 30 FT E.M.H., 5 FT mast arm, breakaway base (807-11941) | EACH | 1 | $4,007.75 | $4,408.53 | $4,007.75 | $4,008.00 |
| 0097 | Luminaire, low lumen roadway (807-12202) | EACH | 12 | $475.00 | $522.50 | $475.00 | $475.00 |
| 0098 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 12 | $2,400.00 | $2,640.00 | $2,400.00 | $2,400.00 |
| 0099 | Light pole, 30 FT E.M.H., 10 FT mast arm, breakaway base (807-84492) | EACH | 7 | $4,250.00 | $4,675.00 | $4,250.00 | $4,250.00 |
| 0100 | Light pole, 30 FT E.M.H., 15 FT mast arm, breakaway base (807-85502) | EACH | 4 | $4,450.00 | $4,895.00 | $4,450.00 | $4,450.00 |
| 0101 | Service point, type I (807-86805) | EACH | 1 | $5,000.00 | $5,400.00 | $5,000.00 | $5,000.00 |
| 0102 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 990 | $3.00 | $3.45 | $3.00 | $3.00 |
| 0103 | Connector kit, unfused (807-86910) | EACH | 12 | $50.00 | $57.50 | $50.00 | $50.00 |
| 0104 | Connector kit, fused (807-86915) | EACH | 12 | $50.00 | $57.50 | $50.00 | $50.00 |
| 0105 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 27 | $20.00 | $23.00 | $20.00 | $20.00 |
| 0106 | Multiple compression fitting, waterproofed (807-86925) | EACH | 8 | $77.00 | $88.55 | $77.00 | $77.00 |
| 0107 | Insulation link, non- waterproofed (807-86930) | EACH | 27 | $12.00 | $13.80 | $12.00 | $12.00 |
| 0108 | Insulation link, waterproofed (807-86935) | EACH | 24 | $30.00 | $34.50 | $30.00 | $30.00 |
| 0109 | Line, thermoplastic, dotted, white, 12 in. (808-11691) | LFT | 251 | $5.38 | $6.19 | $10.00 | $10.00 |
| 0110 | Grooving for pavement markings (808-12032) | LFT | 3,326 | $0.78 | $0.90 | $3.00 | $3.00 |
| 0111 | Transverse marking, thermoplastic, yield line, white, 36 in. (808-12148) | LFT | 72 | $22.11 | $25.43 | $30.00 | $30.00 |
| 0112 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 539 | $1.02 | $1.17 | $3.00 | $3.00 |
| 0113 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 2,464 | $1.02 | $1.17 | $3.00 | $3.00 |
| 0114 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 8 | $224.00 | $257.60 | $200.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.