INDOT contract R-42797-A bid tabulation
BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on November 13, 2025, Rush, Greenfield. 8 bids received; low bid $1,814,802 by Olco Inc.
- Owner
- Indiana DOT
- Letting
- 13 NOV 2025
- Pay items
- 67
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Olco Inc | $1,814,802 | Low |
| 2 | Morphey Construction Inc. | $1,939,000 | +7.0% |
| 3 | Calumet Civil Contractors Inc | $2,078,000 | +15% |
| 4 | Edward & Jones Concrete Inc | $2,177,486 | +20% |
| 5 | Beaty Construction Inc | $2,255,736 | +24% |
| 6 | Dave Omara Contractor Inc | $2,268,147 | +25% |
| 7 | 3D Company Inc | $2,437,000 | +34% |
| 8 | Paul H Rohe Company Inc | $2,575,640 | +42% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Olco Inc | 2. Morphey Construction Inc. | 3. Calumet Civil Contractors Inc | 4. Edward & Jones Concrete Inc | 5. Beaty Construction Inc | 6. Dave Omara Contractor Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $44,900 | $38,900 | $45,000 | $34,900 | $45,000 | $27,540 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $24,965 | $96,950 | $80,000 | $50,385 | $112,750 | $111,000 |
| 0009 | Tree, 6 in., remove (201-02245) | EACH | 7 | $762.29 | $350.00 | $300.00 | $550.00 | $275.00 | $275.00 |
| 0010 | Tree, 10 in., remove (201-02250) | EACH | 1 | $925.50 | $850.00 | $400.00 | $1,000.00 | $500.00 | $825.00 |
| 0011 | Tree, 18 in., remove (201-02255) | EACH | 11 | $1,957.31 | $1,350.00 | $750.00 | $1,600.00 | $1,100.00 | $1,320.00 |
| 0012 | Tree, 30 in., remove (201-02260) | EACH | 6 | $2,747.30 | $3,300.00 | $3,000.00 | $3,000.00 | $2,675.00 | $2,420.00 |
| 0013 | Tree, 48 in., remove (201-02265) | EACH | 2 | $3,546.62 | $5,400.00 | $4,000.00 | $4,800.00 | $5,800.00 | $3,400.00 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $22,053 | $77,560 | $80,385 | $29,500 | $135,325 | $134,000 |
| 0015 | Pavement removal (202-02240) | SYS | 780 | $20.37 | $20.00 | $20.00 | $35.00 | $55.50 | $34.00 |
| 0016 | Curb, concrete, remove (202-02278) | LFT | 676 | $18.90 | $15.00 | $15.50 | $22.00 | $24.50 | $12.00 |
| 0017 | Curb and gutter, remove (202-02279) | LFT | 704 | $18.90 | $15.00 | $20.00 | $23.00 | $17.75 | $12.00 |
| 0018 | Sidewalk concrete, remove (202-52710) | SYS | 3,090 | $18.31 | $20.00 | $16.75 | $36.00 | $18.00 | $34.00 |
| 0019 | Sign, remove (202-74035) | EACH | 14 | $41.05 | $50.00 | $50.00 | $50.00 | $125.00 | $185.00 |
| 0020 | Stump, remove (202-91922) | EACH | 6 | $138.24 | $500.00 | $700.00 | $450.00 | $500.00 | $100.00 |
| 0021 | Fire hydrant assembly, remove (202-97009) | EACH | 5 | $5,523.79 | $2,500.00 | $1,100.00 | $2,500.00 | $4,000.00 | $1,750.00 |
| 0022 | Excavation, common (203-02000) | CYS | 500 | $61.96 | $50.00 | $50.00 | $45.00 | $109.50 | $39.00 |
| 0023 | Stormwater management budget (205-12108) | DOL | 11,940 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $14,850 | $500.00 | $35,000 | $15,000 | $12,000 | $18,700 |
| 0025 | SWQCP preparation (205-12618) | LS | 1 | $3,000.00 | $2,000.00 | $2,500.00 | $2,500.00 | $3,250.00 | $2,750.00 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 1,304 | $28.00 | $30.00 | $28.00 | $59.00 | $36.75 | $61.00 |
| 0027 | Structure backfill, type 1 (211-09264) | CYS | 69 | $97.75 | $68.00 | $67.00 | $85.00 | $86.75 | $55.00 |
| 0028 | Geogrid, type IB (214-11796) | SYS | 589 | $3.86 | $2.50 | $4.00 | $4.50 | $4.75 | $9.00 |
| 0029 | Dense graded subbase (302-07455) | CYS | 98 | $95.66 | $180.00 | $150.00 | $98.00 | $139.00 | $157.00 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 215 | $63.05 | $120.00 | $72.00 | $95.00 | $113.25 | $83.00 |
| 0031 | HMA patching, full depth, type B (304-12623) | TON | 110 | $193.44 | $200.00 | $185.00 | $425.00 | $500.00 | $300.00 |
| 0032 | Sidewalk, concrete (604-06070) | SYS | 3,620 | $82.72 | $100.00 | $62.00 | $92.00 | $102.25 | $73.00 |
| 0033 | Curb ramp, concrete (604-08086) | SYS | 775 | $269.07 | $290.00 | $175.00 | $249.00 | $175.00 | $197.00 |
| 0034 | Curb, island concrete (605-02493) | SYS | 74 | $202.16 | $135.00 | $160.00 | $75.00 | $90.50 | $243.00 |
| 0035 | Curb, concrete (605-06120) | LFT | 1,288 | $46.30 | $50.00 | $44.00 | $55.00 | $76.00 | $60.00 |
| 0036 | Curb and gutter, concrete (605-06140) | LFT | 1,120 | $60.16 | $50.00 | $53.00 | $64.00 | $81.00 | $60.00 |
| 0037 | PCCP for approaches, 6 in. (610-08446) | SYS | 222 | $178.95 | $115.00 | $113.00 | $110.00 | $135.00 | $155.00 |
| 0038 | PCCP for approaches, 9 in. (610-09108) | SYS | 367 | $203.29 | $135.00 | $125.00 | $125.00 | $150.00 | $167.00 |
| 0039 | Sodding, nursery (621-06575) | SYS | 2,860 | $15.48 | $22.50 | $17.75 | $6.50 | $6.50 | $12.50 |
| 0040 | Tapping sleeve with valve (621-90853) | EACH | 5 | $10,551 | $7,500.00 | $9,500.00 | $15,000 | $6,850.00 | $7,550.00 |
| 0041 | Plant, deciduous tree, single stem, over 2 in. to 2.5 in. (622-05650) | EACH | 43 | $545.21 | $450.00 | $875.00 | $450.00 | $450.00 | $950.00 |
| 0043 | HMA for structure installation, type B (715-08305) | TON | 33 | $214.53 | $200.00 | $360.00 | $475.00 | $300.00 | $300.00 |
| 0044 | Casting, inlet, adjust to grade (720-12797) | EACH | 12 | $381.51 | $500.00 | $550.00 | $700.00 | $1,425.00 | $875.00 |
| 0045 | Casting, water valve, adjust to grade (720-94840) | EACH | 5 | $293.98 | $500.00 | $400.00 | $700.00 | $500.00 | $675.00 |
| 0046 | Casting, water meter, adjust to grade (720-94841) | EACH | 25 | $328.37 | $500.00 | $1,100.00 | $700.00 | $675.00 | $525.00 |
| 0047 | Fire hydrant assembly (720-96999) | EACH | 5 | $10,966 | $10,000 | $10,500 | $13,500 | $10,000 | $9,550.00 |
| 0048 | Road closure sign assembly (801-04308) | EACH | 7 | $406.00 | $295.00 | $406.00 | $150.00 | $295.00 | $450.00 |
| 0049 | Detour route marker assembly (801-06625) | EACH | 6 | $198.00 | $138.00 | $198.00 | $100.00 | $138.00 | $215.00 |
| 0050 | Construction sign, type A (801-06640) | EACH | 32 | $252.00 | $180.00 | $252.00 | $300.00 | $182.00 | $275.00 |
| 0051 | Construction sign, type B (801-06645) | EACH | 12 | $185.00 | $110.00 | $185.00 | $150.00 | $110.00 | $200.00 |
| 0052 | Maintaining traffic (801-06775) | LS | 1 | $75,618 | $97,382 | $100,000 | $65,000 | $99,553 | $169,959 |
| 0053 | Barricade, type III-A (801-07118) | LFT | 60 | $19.00 | $17.00 | $19.00 | $20.00 | $17.00 | $20.00 |
| 0054 | Temporary curb ramp (801-11990) | EACH | 5 | $475.89 | $4,500.00 | $2,200.00 | $2,250.00 | $2,300.00 | $3,278.00 |
| 0055 | Temporary accessible pedestrian path (801-12641) | SYS | 161 | $15.11 | $25.00 | $45.00 | $55.00 | $165.00 | $78.00 |
| 0056 | Temporary pedestrian channelizer (801-12862) | LFT | 56 | $7.00 | $75.00 | $22.00 | $50.00 | $120.00 | $84.00 |
| 0057 | Conduit, PVC, 2 in. (805-06595) | LFT | 784 | $26.02 | $20.00 | $36.00 | $27.00 | $76.00 | $27.81 |
| 0058 | Conduit, PVC, 2 in. , SDR 11 fiber optics (805-06595) | LFT | 8,986 | $10.11 | $10.00 | $38.00 | $28.00 | $10.75 | $28.84 |
| 0059 | Conduit, PVC, 2 in. schedule 40 (805-08214) | LFT | 468 | $43.78 | $35.00 | $36.00 | $27.00 | $94.25 | $27.81 |
| 0060 | Conduit, PVC, 2 in. schedule 40 , street lighting (805-08214) | LFT | 3,709 | $11.47 | $12.00 | $36.00 | $28.00 | $17.25 | $28.84 |
| 0061 | Light structure, remove and reset (807-02370) | EACH | 10 | $3,500.00 | $1,000.00 | $2,200.00 | $1,500.00 | $2,200.00 | $1,545.00 |
| 0062 | Handhole , fiber optics (807-78590) | EACH | 11 | $3,358.37 | $2,500.00 | $2,200.00 | $1,900.00 | $2,725.00 | $1,957.00 |
| 0063 | Pavement message marking, paint, lane indication arrow (808-06723) | EACH | 2 | $129.00 | $135.00 | $129.00 | $150.00 | $135.00 | $142.00 |
| 0064 | Pavement message marking, paint, only (808-06724) | EACH | 2 | $173.00 | $155.00 | $173.00 | $200.00 | $155.00 | $190.00 |
| 0065 | Transverse marking, paint, stop line, white, 24 in. (808-06726) | LFT | 263 | $5.38 | $8.45 | $5.38 | $12.00 | $8.45 | $6.00 |
| 0066 | Transverse marking, paint, crosswalk line, white, 6 in. (808-75100) | LFT | 1,568 | $2.61 | $3.00 | $2.61 | $5.00 | $3.10 | $3.00 |
| 0067 | Detectable warning surfaces (604-12083) | SYS | 174 | $395.19 | $350.00 | $270.16 | $525.00 | $475.00 | $240.00 |
| 0068 | Water main, 6 in. (715-93912) | LFT | 62 | $244.17 | $160.00 | $250.00 | $205.00 | $315.00 | $129.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 13, 2025. Compiled by Mirage Metrics.