Edward & Jones Concrete Inc submitted 13 bids on Indiana DOT contracts in the data, from 14 SEP 2022 to 05 NOV 2026, and was the low bidder on 6 of them (46%). When it was not low, its total sat a median +16% above the low bid.

Owner
Indiana DOT
Low bid volume
$4,503,373
Latest bid
05 NOV 2026
Data through
05 NOV 2026
13Bids
6Low bids
46Win rate, percent
+16%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20224250%
202311100%
20243133%
20253267%
2026200%
Edward & Jones Concrete Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Greenfield6117%
Seymour5360%
Crawfordsville22100%
Edward & Jones Concrete Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL1313 (100%)$1.00$1.00
Contract liens109-08360DOL1313 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL1313 (100%)$1.00$1.00
Stormwater management budget205-12108DOL1212 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL1212 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL1111 (100%)$1.00$1.00
Sidewalk, concrete604-06070SYS136 (46%)$100.00$90.18
Detectable warning surfaces604-12083SYS136 (46%)$420.00$300.00
Payment adjustment, PG asphalt binder109-09489DOL66 (100%)$1.00$1.00
Curb ramp, concrete604-08086SYS135 (38%)$249.00$218.94
Curb, concrete605-06120LFT115 (45%)$58.00$54.00
Quality adjustments, HMA109-08440DOL55 (100%)$1.00$1.00
Edward & Jones Concrete Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Morphey Construction Inc.82 of 8
Olco Inc65 of 6
Calumet Civil Contractors Inc63 of 6
Milestone Contractors LP50 of 5
E & B Paving LLC41 of 4
River Town Construction LLC21 of 2
Brooks Construction Company Inc11 of 1
Rieth-Riley Construction Co., Inc.10 of 1
Crider & Crider Inc10 of 1
Beaty Construction Inc10 of 1
Edward & Jones Concrete Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026R-44293-ASeymourBIKE AND PEDESTRIAN FACILITIES5 of 7$1,561,287+15%
11 MAR 2026R-45629-AGreenfieldADA SIDEWALK RAMP CONSTRUCTION2 of 5$237,644+16%
13 NOV 2025R-42797-AGreenfieldBIKE AND PEDESTRIAN FACILITIES4 of 8$2,177,486+20%
08 OCT 2025T-43988-BCrawfordsvilleTRAFFIC SIGNALS MODERNIZATION1 of 2$522,260Low, 29% under the second
15 JAN 2025R-44764-ASeymourSAFETY IMPROVEMENTS1 of 4$340,747Low, 22% under the second
10 APR 2024R-43102-ACrawfordsvilleADA SIDEWALK AND RAMP CONSTRUCTION1 of 4$1,924,642Low, 12% under the second
15 FEB 2024T-42335-AGreenfieldADA SIDEWALK RAMP CONSTRUCTION3 of 4$978,160+6.0%
18 JAN 2024R-41990-ASeymourBIKE AND PEDESTRIAN FACILITIES4 of 5$1,477,942+36%
19 JAN 2023R-43580-ASeymourADA SIDEWALK RAMP CONSTRUCTION1 of 2$508,495Low, 57% under the second
07 DEC 2022T-41391-AGreenfieldSAFETY REVISIONS1 of 4$709,651Low, 7.0% under the second
16 NOV 2022T-41389-AGreenfieldSAFETY REVISIONS2 of 3$2,109,638+15%
13 OCT 2022R-41896-ASeymourBIKE AND PEDESTRIAN FACILITIES1 of 5$497,578Low, 30% under the second
14 SEP 2022R-41308-AGreenfieldADA SIDEWALK RAMP CONSTRUCTION2 of 2$702,624+37%
Edward & Jones Concrete Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy