INDOT contract R-44293-A bid tabulation
BIKE AND PEDESTRIAN FACILITIES. Let by Indiana DOT on November 5, 2026, Harrison, Seymour. 7 bids received; low bid $1,358,442 by River Town Construction LLC.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 77
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | River Town Construction LLC | $1,358,442 | Low |
| 2 | Jbi Construction Inc | $1,429,950 | +5.0% |
| 3 | E & B Paving LLC | $1,485,952 | +9.0% |
| 4 | Mac Construction & Excavating Inc | $1,552,000 | +14% |
| 5 | Edward & Jones Concrete Inc | $1,561,287 | +15% |
| 6 | Libs Paving Company Inc | $1,581,038 | +16% |
| 7 | Milestone Contractors LP | $2,172,739 | +60% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. River Town Construction LLC | 2. Jbi Construction Inc | 3. E & B Paving LLC | 4. Mac Construction & Excavating Inc | 5. Edward & Jones Concrete Inc | 6. Libs Paving Company Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $64,750 | $50,000 | $55,000 | $27,000 | $27,620 | $30,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Mobilization and demobilization (110-01001) | LS | 1 | $67,000 | $71,000 | $71,000 | $80,000 | $72,100 | $77,000 |
| 0009 | Tree, 6 in., remove (201-02245) | EACH | 1 | $325.00 | $1,250.00 | $850.00 | $200.00 | $179.67 | $200.00 |
| 0010 | Tree, 10 in., remove (201-02250) | EACH | 1 | $450.00 | $1,450.00 | $950.00 | $600.00 | $539.00 | $600.00 |
| 0011 | Tree, 18 in., remove (201-02255) | EACH | 7 | $1,300.00 | $1,850.00 | $1,357.14 | $1,300.00 | $1,167.83 | $1,300.00 |
| 0012 | Tree, 30 in., remove (201-02260) | EACH | 4 | $2,900.00 | $4,750.00 | $3,612.50 | $3,900.00 | $2,605.15 | $3,900.00 |
| 0013 | Tree, 48 in., remove (201-02265) | EACH | 1 | $3,600.00 | $7,250.00 | $5,650.00 | $3,600.00 | $3,233.98 | $3,600.00 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $83,000 | $57,000 | $50,161 | $113,500 | $30,000 | $25,000 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 2,036 | $9.25 | $12.00 | $12.00 | $26.00 | $25.00 | $40.00 |
| 0016 | Excavation, common (203-02000) | CYS | 341 | $50.00 | $65.00 | $180.00 | $60.00 | $85.75 | $205.00 |
| 0017 | Stormwater management budget (205-12108) | DOL | 17,100 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $8,000.00 | $50,000 | $22,000 | $21,450 | $17,990 | $20,000 |
| 0019 | SWQCP preparation (205-12618) | LS | 1 | $5,000.00 | $2,100.00 | $2,650.00 | $1,600.00 | $2,100.00 | $5,000.00 |
| 0020 | Subgrade treatment, type II (207-08264) | SYS | 4,331 | $20.00 | $21.00 | $31.00 | $27.00 | $28.00 | $30.00 |
| 0021 | Geogrid, type IB (214-11796) | SYS | 773 | $4.00 | $2.00 | $2.00 | $11.00 | $6.50 | $2.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 139 | $118.00 | $119.00 | $120.00 | $106.00 | $92.25 | $275.00 |
| 0023 | Dense graded subbase (302-07455) | CYS | 134 | $118.00 | $155.00 | $122.00 | $107.00 | $90.75 | $275.00 |
| 0024 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 446 | $14.00 | $16.00 | $25.00 | $11.00 | $9.95 | $23.00 |
| 0025 | HMA wedge and level, type B (402-07451) | TON | 50 | $205.00 | $196.00 | $195.00 | $200.00 | $260.00 | $205.00 |
| 0026 | Sidewalk, concrete (604-06070) | SYS | 2,690 | $60.00 | $61.00 | $59.25 | $65.00 | $115.00 | $68.00 |
| 0027 | Curb ramp, concrete (604-08086) | SYS | 167 | $130.00 | $215.00 | $130.00 | $130.00 | $223.00 | $225.00 |
| 0028 | Detectable warning surfaces (604-12083) | SYS | 27 | $205.00 | $280.00 | $280.00 | $220.00 | $435.00 | $250.00 |
| 0029 | Curb, remove (605-02278) | LFT | 378 | $11.00 | $18.00 | $21.00 | $20.00 | $16.00 | $45.00 |
| 0030 | Curb, concrete (605-06120) | LFT | 386 | $35.00 | $52.00 | $34.00 | $40.00 | $58.00 | $60.00 |
| 0031 | HMA for approaches, type B (610-07487) | TON | 92 | $200.00 | $266.00 | $265.00 | $190.00 | $260.00 | $205.00 |
| 0032 | PCCP for approaches, 6 in. (610-08446) | SYS | 426 | $82.00 | $103.00 | $83.00 | $119.00 | $104.00 | $125.00 |
| 0033 | PCCP for approaches, 9 in. (610-09108) | SYS | 737 | $111.00 | $121.00 | $78.00 | $100.00 | $153.00 | $145.00 |
| 0034 | Parking barrier, concrete (615-11537) | EACH | 14 | $75.00 | $250.00 | $270.88 | $150.00 | $310.00 | $200.00 |
| 0035 | Bicycle rack , relocate (618-04181) | EACH | 3 | $600.00 | $500.00 | $3,300.00 | $900.00 | $667.00 | $850.00 |
| 0036 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $975.00 | $975.00 | $975.00 | $975.00 | $1,000.00 | $975.00 |
| 0037 | Mulched seeding, type U (621-06560) | SYS | 456 | $7.08 | $8.00 | $7.08 | $7.08 | $9.00 | $7.08 |
| 0038 | Water (621-06567) | KGAL | 9 | $2.00 | $2.00 | $2.00 | $2.00 | $5.00 | $2.00 |
| 0039 | Sodding, nursery (621-06575) | SYS | 2,129 | $6.69 | $14.50 | $6.69 | $6.69 | $16.00 | $6.69 |
| 0040 | Plant, deciduous tree, single stem, 1.25 in. to 2 in. (622-05649) | EACH | 4 | $643.00 | $643.00 | $643.00 | $643.00 | $450.00 | $643.00 |
| 0041 | Plant, deciduous tree, single stem, over 2 in. to 2.5 in. (622-05650) | EACH | 10 | $710.00 | $710.00 | $710.00 | $710.00 | $575.00 | $710.00 |
| 0042 | Topsoil processing and distribution (629-000149) | SYS | 2,585 | $8.00 | $8.00 | $7.50 | $24.13 | $6.78 | $8.00 |
| 0043 | Topsoil amendment budget (629-000150) | DOL | 5,170 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0044 | Casting, inlet, adjust to grade (720-12797) | EACH | 3 | $200.00 | $450.00 | $2,600.00 | $670.00 | $1,412.00 | $350.00 |
| 0045 | Casting, manhole, adjust to grade (720-12798) | EACH | 5 | $270.00 | $450.00 | $2,600.00 | $670.00 | $1,412.00 | $550.00 |
| 0046 | Casting, water valve, adjust to grade (720-94840) | EACH | 1 | $125.00 | $450.00 | $2,300.00 | $600.00 | $904.00 | $550.00 |
| 0047 | Casting, water meter, adjust to grade (720-94841) | EACH | 10 | $325.00 | $450.00 | $1,800.00 | $600.00 | $904.00 | $1,500.00 |
| 0048 | Detour route marker assembly (801-06625) | EACH | 8 | $75.00 | $152.00 | $152.00 | $152.00 | $152.00 | $75.00 |
| 0049 | Construction sign, type A (801-06640) | EACH | 13 | $200.00 | $199.00 | $199.00 | $199.00 | $199.00 | $200.00 |
| 0050 | Construction sign, type B (801-06645) | EACH | 17 | $75.00 | $102.00 | $102.00 | $102.00 | $102.00 | $75.00 |
| 0051 | Maintaining traffic (801-06775) | LS | 1 | $85,000 | $51,000 | $106,000 | $119,999 | $38,550 | $53,200 |
| 0052 | Barricade, type III-A (801-07118) | LFT | 24 | $20.00 | $16.00 | $15.67 | $15.67 | $16.00 | $20.00 |
| 0053 | Sign post, square, type 1, unreinforced anchor base (802-05704) | LFT | 84 | $22.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0054 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 42 | $28.00 | $19.00 | $44.00 | $19.00 | $19.00 | $19.00 |
| 0055 | Sign, ground mounted, reset (802-91122) | EACH | 4 | $200.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 0056 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 859 | $18.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 0057 | Handhole, lighting (807-02191) | EACH | 2 | $1,500.00 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 | $1,900.00 |
| 0058 | Luminaire, ornamental (807-03950) | EACH | 37 | $2,000.00 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 | $2,100.00 |
| 0059 | Light pole, ornamental , 10 FT (807-03951) | EACH | 34 | $3,550.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 |
| 0060 | Light pole, ornamental , 8 FT (807-03951) | EACH | 3 | $3,500.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 0061 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 3,740 | $22.00 | $16.00 | $16.00 | $16.00 | $16.00 | $16.00 |
| 0062 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 37 | $2,200.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0063 | Service point, type I (807-86805) | EACH | 1 | $8,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 |
| 0064 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 2,433 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 0065 | Connector kit, unfused (807-86910) | EACH | 37 | $55.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0066 | Connector kit, fused (807-86915) | EACH | 37 | $55.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 0067 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 16 | $25.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 0068 | Multiple compression fitting, waterproofed (807-86925) | EACH | 4 | $55.00 | $31.00 | $31.00 | $31.00 | $31.00 | $31.00 |
| 0069 | Insulation link, non- waterproofed (807-86930) | EACH | 109 | $25.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0070 | Insulation link, waterproofed (807-86935) | EACH | 8 | $45.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0071 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 224 | $14.95 | $13.00 | $12.72 | $12.72 | $12.72 | $15.00 |
| 0072 | Transverse marking, multi-component, crosswalk line, white, 6 in. (808-10056) | LFT | 54 | $9.95 | $6.00 | $5.88 | $5.88 | $5.88 | $10.00 |
| 0073 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 1 | $475.00 | $261.00 | $261.00 | $261.00 | $261.00 | $500.00 |
| 0074 | Transverse marking, thermoplastic, parking line, white, 4 in. (808-12273) | LFT | 554 | $3.95 | $1.50 | $1.44 | $1.44 | $1.44 | $4.00 |
| 0075 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 40 | $15.00 | $13.00 | $12.72 | $12.72 | $12.72 | $15.00 |
| 0076 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 290 | $5.00 | $6.00 | $5.22 | $5.22 | $5.22 | $5.00 |
| 0077 | Pavement message marking, thermoplastic, ADA accessible symbol (808-97664) | EACH | 2 | $475.00 | $461.00 | $461.00 | $461.00 | $461.00 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.