Libs Paving Company Inc: INDOT bid record
Libs Paving Company Inc submitted 19 bids on Indiana DOT contracts in the data, from 09 MAR 2022 to 05 NOV 2026, and was the low bidder on 4 of them (21%). When it was not low, its total sat a median +16% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $5,881,746
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 0 | 0% |
| 2023 | 1 | 1 | 100% |
| 2024 | 3 | 0 | 0% |
| 2025 | 4 | 1 | 25% |
| 2026 | 9 | 2 | 22% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 18 | 3 | 17% |
| Vincennes | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 19 | 19 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 13 | 13 (100%) | $1.00 | $1.00 |
| Construction sign, type A | 801-06640 | EACH | 16 | 6 (38%) | $200.00 | $200.00 |
| Geogrid, type IB | 214-11796 | SYS | 9 | 6 (67%) | $4.00 | $3.65 |
| Detour route marker assembly | 801-06625 | EACH | 7 | 6 (86%) | $75.00 | $140.00 |
| Sign, sheet, with legend, 0.080 in. thickness | 802-09838 | SFT | 6 | 6 (100%) | $29.50 | $31.27 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E & B Paving LLC | 17 | 8 of 17 |
| Mac Construction & Excavating Inc | 14 | 6 of 14 |
| Milestone Contractors LP | 7 | 3 of 7 |
| 5 Star Company Inc | 5 | 3 of 5 |
| Louisville Paving Co | 4 | 2 of 4 |
| Dave Omara Contractor Inc | 3 | 2 of 3 |
| Paul H Rohe Company Inc | 3 | 1 of 3 |
| Ragle, Inc. | 3 | 1 of 3 |
| Dave O'Mara Contractor Inc | 3 | 1 of 3 |
| Temple & Temple Excavating & Paving Inc | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-44293-A | Seymour | BIKE AND PEDESTRIAN FACILITIES | 6 of 7 | $1,581,038 | +16% |
| 07 OCT 2026 | B-44972-A | Seymour | SCOUR PROTECTION | 2 of 7 | $208,793 | +5.0% |
| 02 SEP 2026 | R-45304-A | Seymour | SMALL STRUCTURE REPLACEMENT | 7 of 9 | $227,829 | +60% |
| 05 AUG 2026 | B-44436-A | Seymour | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | 8 of 10 | $696,770 | +22% |
| 08 JUL 2026 | R-43766-A | Seymour | SMALL STRUCTURES AND DRAINS | 2 of 7 | $2,878,136 | +11% |
| 08 JUL 2026 | R-46544-A | Seymour | PAVEMENT PATCHING | 2 of 2 | $1,158,299 | +21% |
| 11 FEB 2026 | R-42543-A | Vincennes | SMALL STRUCTURES AND DRAINS CONSTRUCTION | 1 of 2 | $184,510 | Low, 7.0% under the second |
| 14 JAN 2026 | R-39911-B | Seymour | PAVEMENT REPLACEMENT | 2 of 4 | $6,478,452 | +12% |
| 14 JAN 2026 | T-43756-A | Seymour | NEW SIGNAL INSTALLATION | 1 of 4 | $2,042,928 | Low, 4.0% under the second |
| 10 SEP 2025 | R-45525-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 4 | $1,387,506 | +6.0% |
| 06 AUG 2025 | R-46402-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 4 of 4 | $2,654,298 | +52% |
| 12 FEB 2025 | R-42790-A | Seymour | ROAD REHABILITATION | 3 of 5 | $2,957,921 | +9.0% |
| 15 JAN 2025 | R-42881-A | Seymour | ASPHALT RESURFACE, AUXILIARY LANES AND TRAFFIC SIGNALS | 1 of 5 | $2,657,867 | Low, 1.0% under the second |
| 11 SEP 2024 | R-45319-A | Seymour | SMALL STRUCTURE REPLACEMENT | 2 of 5 | $249,891 | +19% |
| 10 JUL 2024 | R-37445-A | Seymour | BIKE AND PEDESTRIAN FACILITIES | 2 of 4 | $3,555,555 | +6.0% |
| 09 MAY 2024 | R-41802-A | Seymour | INTERSECTION IMPROVEMENT, ROUNDABOUT | 3 of 3 | $3,110,928 | +40% |
| 19 JAN 2023 | R-41478-A | Seymour | INTERSECTION IMPROVEMENT WITH ADDED TURN LANES | 1 of 3 | $996,442 | Low, 27% under the second |
| 09 MAR 2022 | R-44076-A | Seymour | ASPHALT RESURFACE | 2 of 3 | $149,823 | +3.0% |
| 09 MAR 2022 | R-44077-A | Seymour | ASPHALT RESURFACE | 3 of 4 | $362,334 | +26% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.