Dave O'Mara Contractor Inc: INDOT bid record
Dave O'Mara Contractor Inc submitted 18 bids on Indiana DOT contracts in the data, from 08 APR 2026 to 05 NOV 2026, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $3,872,535
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2026 | 18 | 4 | 22% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 15 | 4 | 27% |
| Greenfield | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 18 | 18 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices and markings | 109-08443 | DOL | 17 | 17 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 16 | 16 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 15 | 15 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 14 | 14 (100%) | $1.00 | $1.00 |
| Milling, asphalt, 1 1/2 in. | 306-08034 | SYS | 12 | 8 (67%) | $9.96 | $10.00 |
| Compacted aggregate, no. 53 | 303-01180 | TON | 12 | 7 (58%) | $50.00 | $62.00 |
| QC/QA-HMA, 3, 58H, surface, 9.5 MM | 401-000005 | TON | 8 | 7 (88%) | $127.50 | $160.00 |
| Field office, type D | 628-12683 | MOS | 11 | 6 (55%) | $2,200.00 | $3,341.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Milestone Contractors LP | 16 | 7 of 16 |
| Paul H Rohe Company Inc | 8 | 3 of 8 |
| Morphey Construction Inc. | 8 | 2 of 8 |
| Force Construction Co Inc | 7 | 4 of 7 |
| E & B Paving LLC | 7 | 3 of 7 |
| 5 Star Company Inc | 6 | 4 of 6 |
| Rieth-Riley Construction Co., Inc. | 5 | 1 of 5 |
| Olco Inc | 5 | 3 of 5 |
| American Contracting & Services Inc | 4 | 0 of 4 |
| Ragle, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | R-39073-A | Greenfield | BIKE AND PEDESTRIAN FACILITIES | 4 of 7 | $2,302,268 | +12% |
| 05 NOV 2026 | R-43746-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 3 | $1,384,000 | +30% |
| 05 NOV 2026 | R-46147-A | Seymour | HMA OVERLAY, PREVENTIVE MAINTENANCE | 2 of 3 | $5,278,000 | +2.0% |
| 05 NOV 2026 | B-44466-A | Seymour | BRIDGE DECK OVERLAY AND COPING REPLACEMENT | 3 of 7 | $1,342,000 | +5.0% |
| 05 NOV 2026 | B-46218-A | Seymour | SMALL STRUCTURE REPLACEMENT | 3 of 7 | $479,125 | +7.0% |
| 07 OCT 2026 | R-43755-A | Seymour | SIGHT DISTANCE IMPROVEMENT | 4 of 5 | $392,697 | +12% |
| 07 OCT 2026 | R-44279-A | Seymour | INTERSECTION IMPROVMENT WITH TRAFFIC SIGNAL MODERNIZATION | 4 of 4 | $1,650,388 | +49% |
| 07 OCT 2026 | R-44462-A | Seymour | SMALL STRUCTURE REPLACEMENT, PIPE LINING AND DRAINS CONSTR | 1 of 5 | $1,673,000 | Low, 12% under the second |
| 07 OCT 2026 | B-44483-A | Greenfield | BRIDGE REPLACEMENT AND THIN DECK OVERLAY | 4 of 6 | $1,471,000 | +25% |
| 02 SEP 2026 | R-45304-A | Seymour | SMALL STRUCTURE REPLACEMENT | 8 of 9 | $262,700 | +85% |
| 02 SEP 2026 | B-43771-A | Seymour | BRIDGE AND SMALL STRUCTURE REPLACEMENT | 3 of 6 | $3,193,647 | +5.0% |
| 05 AUG 2026 | R-46512-A | Seymour | STORM SEWER REPAIR OR REPLACEMENT | 1 of 5 | $196,907 | Low, 6.0% under the second |
| 05 AUG 2026 | R-46692-A | Seymour | PAVEMENT PATCHING | 1 of 3 | $848,689 | Low, 51% under the second |
| 05 AUG 2026 | B-44436-A | Seymour | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | 4 of 10 | $618,907 | +9.0% |
| 08 JUL 2026 | R-43766-A | Seymour | SMALL STRUCTURES AND DRAINS | 4 of 7 | $3,358,000 | +30% |
| 08 JUL 2026 | R-45169-A | Greenfield | INTERSECTION IMPROVEMENT, MEDIAN U-TURN | 3 of 5 | $3,972,000 | +10% |
| 08 JUL 2026 | B-46217-A | Seymour | BRIDGE DECK OVERLAY | 1 of 8 | $1,153,939 | Low, 16% under the second |
| 08 APR 2026 | B-40891-A | Seymour | BRIDGE REPLACEMENT | 2 of 7 | $1,438,800 | +1.0% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.