Dave O'Mara Contractor Inc: INDOT bid record

Dave O'Mara Contractor Inc submitted 18 bids on Indiana DOT contracts in the data, from 08 APR 2026 to 05 NOV 2026, and was the low bidder on 4 of them (22%). When it was not low, its total sat a median +11% above the low bid.

Owner
Indiana DOT
Low bid volume
$3,872,535
Latest bid
05 NOV 2026
Data through
05 NOV 2026
18Bids
4Low bids
22Win rate, percent
+11%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
202618422%
Dave O'Mara Contractor Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Seymour15427%
Greenfield300%
Dave O'Mara Contractor Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL1818 (100%)$1.00$1.00
Contract liens109-08360DOL1818 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL1818 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices and markings109-08443DOL1717 (100%)$1.00$1.00
Stormwater management budget205-12108DOL1616 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL1616 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL1515 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL1414 (100%)$1.00$1.00
Milling, asphalt, 1 1/2 in.306-08034SYS128 (67%)$9.96$10.00
Compacted aggregate, no. 53303-01180TON127 (58%)$50.00$62.00
QC/QA-HMA, 3, 58H, surface, 9.5 MM401-000005TON87 (88%)$127.50$160.00
Field office, type D628-12683MOS116 (55%)$2,200.00$3,341.50
Dave O'Mara Contractor Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Dave O'Mara Contractor Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 NOV 2026R-39073-AGreenfieldBIKE AND PEDESTRIAN FACILITIES4 of 7$2,302,268+12%
05 NOV 2026R-43746-ASeymourHMA OVERLAY, PREVENTIVE MAINTENANCE2 of 3$1,384,000+30%
05 NOV 2026R-46147-ASeymourHMA OVERLAY, PREVENTIVE MAINTENANCE2 of 3$5,278,000+2.0%
05 NOV 2026B-44466-ASeymourBRIDGE DECK OVERLAY AND COPING REPLACEMENT3 of 7$1,342,000+5.0%
05 NOV 2026B-46218-ASeymourSMALL STRUCTURE REPLACEMENT3 of 7$479,125+7.0%
07 OCT 2026R-43755-ASeymourSIGHT DISTANCE IMPROVEMENT4 of 5$392,697+12%
07 OCT 2026R-44279-ASeymourINTERSECTION IMPROVMENT WITH TRAFFIC SIGNAL MODERNIZATION4 of 4$1,650,388+49%
07 OCT 2026R-44462-ASeymourSMALL STRUCTURE REPLACEMENT, PIPE LINING AND DRAINS CONSTR1 of 5$1,673,000Low, 12% under the second
07 OCT 2026B-44483-AGreenfieldBRIDGE REPLACEMENT AND THIN DECK OVERLAY4 of 6$1,471,000+25%
02 SEP 2026R-45304-ASeymourSMALL STRUCTURE REPLACEMENT8 of 9$262,700+85%
02 SEP 2026B-43771-ASeymourBRIDGE AND SMALL STRUCTURE REPLACEMENT3 of 6$3,193,647+5.0%
05 AUG 2026R-46512-ASeymourSTORM SEWER REPAIR OR REPLACEMENT1 of 5$196,907Low, 6.0% under the second
05 AUG 2026R-46692-ASeymourPAVEMENT PATCHING1 of 3$848,689Low, 51% under the second
05 AUG 2026B-44436-ASeymourSMALL STRUCTURE REPLACEMENT WITH BRIDGE4 of 10$618,907+9.0%
08 JUL 2026R-43766-ASeymourSMALL STRUCTURES AND DRAINS4 of 7$3,358,000+30%
08 JUL 2026R-45169-AGreenfieldINTERSECTION IMPROVEMENT, MEDIAN U-TURN3 of 5$3,972,000+10%
08 JUL 2026B-46217-ASeymourBRIDGE DECK OVERLAY1 of 8$1,153,939Low, 16% under the second
08 APR 2026B-40891-ASeymourBRIDGE REPLACEMENT2 of 7$1,438,800+1.0%
Dave O'Mara Contractor Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy