INDOT contract B-46218-A bid tabulation
SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on November 5, 2026, Ohio, Seymour. 7 bids received; low bid $446,353 by 5 Star Company Inc.
- Owner
- Indiana DOT
- Letting
- 05 NOV 2026
- Pay items
- 52
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | 5 Star Company Inc | $446,353 | Low |
| 2 | Olco Inc | $468,947 | +5.0% |
| 3 | Dave O'Mara Contractor Inc | $479,125 | +7.0% |
| 4 | McAlister Excavating Co Inc | $488,248 | +9.0% |
| 5 | Paul H Rohe Company Inc | $490,799 | +10% |
| 6 | Milestone Contractors LP | $534,826 | +20% |
| 7 | Morphey Construction Inc. | $611,000 | +37% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. 5 Star Company Inc | 2. Olco Inc | 3. Dave O'Mara Contractor Inc | 4. McAlister Excavating Co Inc | 5. Paul H Rohe Company Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $9,150.00 | $10,800 | $7,500.00 | $5,000.00 | $6,800.00 | $8,000.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $31,550 | $7,000.00 | $23,950 | $30,000 | $18,440 | $22,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $13,000 | $12,630 | $14,370 | $8,000.00 | $11,675 | $15,000 |
| 0011 | Present structure, remove, structure no. 1 (202-51330) | LS | 1 | $14,590 | $12,903 | $19,980 | $25,000 | $29,900 | $55,000 |
| 0012 | Excavation, common (203-02000) | CYS | 120 | $40.00 | $60.05 | $98.00 | $22.00 | $70.00 | $115.00 |
| 0013 | Pump around (205-11626) | EACH | 1 | $3,150.00 | $7,739.58 | $7,200.00 | $5,000.00 | $20,365 | $16,300 |
| 0014 | Stormwater management budget (205-12108) | DOL | 8,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $2,500.00 | $3,456.39 | $2,873.00 | $5,000.00 | $3,000.00 | $5,304.73 |
| 0016 | Subgrade treatment, type II (207-08264) | SYS | 78 | $31.00 | $29.55 | $32.00 | $8.00 | $50.00 | $36.65 |
| 0017 | Subgrade treatment, type IC (207-09935) | SYS | 358 | $41.00 | $54.64 | $67.00 | $15.00 | $60.00 | $46.30 |
| 0018 | Structure backfill, type 2 (211-09265) | CYS | 326 | $62.00 | $75.49 | $88.00 | $250.00 | $90.00 | $115.74 |
| 0019 | Geotextile for pavement, type 2B (214-12239) | SYS | 358 | $4.00 | $6.35 | $7.49 | $7.00 | $5.50 | $4.58 |
| 0020 | Compacted aggregate, no. 53 (301-12234) | CYS | 40 | $50.00 | $91.87 | $99.00 | $100.00 | $120.00 | $115.00 |
| 0021 | Compacted aggregate, no. 53 (303-01180) | TON | 82 | $48.00 | $60.74 | $63.00 | $50.00 | $64.00 | $72.34 |
| 0022 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 166 | $12.00 | $24.80 | $22.00 | $30.00 | $17.00 | $54.74 |
| 0023 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 40 | $181.00 | $232.98 | $225.00 | $270.00 | $250.00 | $201.61 |
| 0024 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 44 | $165.00 | $221.84 | $225.00 | $270.00 | $190.00 | $210.10 |
| 0025 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 104 | $140.00 | $194.19 | $225.00 | $270.00 | $165.00 | $165.56 |
| 0026 | Joint adhesive (401-11526) | LFT | 298 | $1.00 | $1.67 | $0.50 | $0.60 | $0.80 | $0.68 |
| 0027 | Asphalt for tack coat (406-05521) | SYS | 795 | $1.00 | $1.51 | $0.50 | $0.60 | $0.70 | $0.27 |
| 0028 | Guardrail terminal system, W-beam, curved, type 6 (601-01839) | EACH | 1 | $2,850.00 | $2,660.00 | $2,926.00 | $3,540.00 | $2,660.00 | $2,660.00 |
| 0029 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 19 | $50.00 | $45.00 | $49.50 | $89.00 | $45.00 | $45.00 |
| 0030 | Guardrail, MGS, long span, type 2 (601-12288) | EACH | 2 | $1,900.00 | $1,725.00 | $1,897.50 | $1,674.00 | $1,725.00 | $1,725.00 |
| 0031 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $2,970.00 | $2,700.00 | $2,970.00 | $3,960.00 | $2,700.00 | $2,700.00 |
| 0032 | HMA for approaches, type B (610-07487) | TON | 18 | $180.00 | $288.36 | $225.00 | $270.00 | $250.00 | $299.16 |
| 0033 | Right-of-way marker (615-06490) | EACH | 3 | $265.00 | $230.00 | $253.00 | $300.00 | $230.00 | $230.00 |
| 0034 | Monument, type B (615-06505) | EACH | 2 | $1,700.00 | $1,550.00 | $1,705.00 | $2,220.00 | $1,550.00 | $1,550.00 |
| 0035 | Riprap, revetment (616-06405) | TON | 422 | $68.90 | $60.18 | $62.00 | $60.00 | $75.00 | $154.42 |
| 0036 | Geotextile for riprap, type 1A (616-12246) | SYS | 511 | $4.00 | $4.24 | $7.49 | $5.00 | $4.00 | $2.94 |
| 0037 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $250.00 | $213.39 | $500.00 | $600.00 | $450.00 | $200.00 |
| 0038 | Erosion control blanket (621-02770) | SYS | 135 | $4.00 | $7.49 | $10.00 | $12.00 | $10.00 | $3.00 |
| 0039 | Mulched seeding, type R (621-06559) | SYS | 135 | $2.00 | $2.56 | $15.00 | $18.00 | $9.00 | $16.50 |
| 0040 | Field office, type D (628-12683) | MOS | 1 | $1,500.00 | $1,886.58 | $1,989.00 | $5,000.00 | $7,000.00 | $8,505.15 |
| 0041 | Waterproofing membrane, type 2 (714-000086) | SFT | 1,118 | $3.00 | $4.17 | $6.35 | $5.00 | $4.60 | $2.39 |
| 0042 | Structure, reinforced concrete, three-sided (723-10156) | LFT | 26 | $7,500.00 | $8,519.58 | $6,975.00 | $6,000.00 | $7,200.00 | $5,935.85 |
| 0043 | Road closure sign assembly (801-04308) | EACH | 4 | $165.00 | $150.00 | $212.00 | $180.00 | $150.00 | $436.78 |
| 0044 | Detour route marker assembly (801-06625) | EACH | 26 | $81.00 | $75.00 | $137.00 | $90.00 | $75.00 | $123.69 |
| 0045 | Construction sign, type A (801-06640) | EACH | 10 | $184.00 | $175.00 | $171.00 | $210.00 | $175.00 | $223.51 |
| 0046 | Maintaining traffic (801-06775) | LS | 1 | $18,500 | $7,818.96 | $7,450.89 | $6,000.00 | $11,040 | $4,000.00 |
| 0047 | Barricade, type III-A (801-07118) | LFT | 48 | $12.00 | $11.00 | $12.00 | $15.00 | $11.00 | $12.62 |
| 0048 | Barricade, type III-B (801-07119) | LFT | 48 | $12.00 | $11.00 | $13.00 | $15.00 | $11.00 | $12.62 |
| 0049 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 360 | $1.50 | $1.00 | $2.50 | $1.20 | $1.00 | $2.79 |
| 0050 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 360 | $1.50 | $1.00 | $2.50 | $1.20 | $1.00 | $2.79 |
| 0051 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 7 | $10.00 | $44.99 | $79.00 | $1.00 | $45.00 | $132.87 |
| 0052 | Snowplowable raised pavement marker (808-75998) | EACH | 7 | $164.00 | $150.00 | $470.00 | $180.00 | $150.00 | $464.05 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of November 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.