INDOT contract B-43771-A bid tabulation

BRIDGE AND SMALL STRUCTURE REPLACEMENT. Let by Indiana DOT on September 2, 2026, Bartholomew, Seymour. 6 bids received; low bid $3,036,459 by Duncan Robertson Inc.

Owner
Indiana DOT
Letting
02 SEP 2026
Pay items
105
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Duncan Robertson Inc$3,036,459Low
2Force Construction Co Inc$3,097,670+2.0%
3Dave O'Mara Contractor Inc$3,193,647+5.0%
4Milestone Contractors LP$3,316,918+9.0%
5Ragle, Inc.$3,933,076+30%
6Rieth-Riley Construction Co., Inc.$3,994,016+32%
INDOT contract B-43771-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Duncan Robertson Inc2. Force Construction Co Inc3. Dave O'Mara Contractor Inc4. Milestone Contractors LP5. Ragle, Inc.6. Rieth-Riley Construction Co., Inc.
0001Construction engineering (105-06845)LS1$30,000$26,220$28,000$45,000$135,000$17,500
0002Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0003Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, temporary traffic control devices and markings (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Project estimate adjustment (109-08463)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$150,000$150,000$159,682$165,163$196,500$359,461
0011Clearing right-of-way (201-52370)LS1$60,000$34,540$63,873$120,000$78,500$79,880
0012Headwall, remove (202-02271)EACH1$750.00$3,028.00$300.00$1,470.00$300.00$1,529.13
0013Present structure, remove, structure no. 1 (202-51330)LS1$150,000$74,400$76,000$171,000$248,000$375,472
0014Pipe, remove (202-96133)LFT173$35.00$42.00$52.00$142.60$15.00$28.66
0015Excavation, common (203-02000)CYS6,960$12.00$22.00$34.00$22.40$35.00$28.12
0016Borrow (203-02070)CYS4,248$12.00$26.00$29.00$10.00$35.00$24.32
0017Excavation, waterway (203-51223)CYS980$20.00$14.00$42.00$36.15$35.00$41.00
0018Pump around (205-11626)EACH2$10,000$17,490$12,000$28,600$7,500.00$14,896
0019Stormwater management budget (205-12108)DOL45,300$1.00$1.00$1.00$1.00$1.00$1.00
0020Stormwater management implementation (205-12616)LS1$55,000$12,190$69,500$16,685$35,000$38,955
0021SWQCP preparation (205-12618)LS1$4,000.00$3,086.00$4,100.00$1,775.30$2,350.00$3,100.00
0022Excavation, wet (206-51220)CYS280$75.00$65.00$60.00$50.60$650.00$185.64
0023Cofferdam , structure no. 1 (206-51235)LS1$40,000$19,100$105,000$81,550$50,000$183,253
0024Subgrade treatment, type II (207-08264)SYS36$15.00$53.00$24.00$79.70$40.00$24.58
0025Subgrade treatment, type IC (207-09935)SYS1,609$40.00$40.00$44.00$36.00$50.00$50.86
0026Subgrade treatment, type ibc (207-12635)SYS4,174$16.00$14.00$18.00$17.80$18.50$16.31
0027Structure backfill, type 2 (211-09265)CYS266$150.00$91.00$115.00$103.85$70.00$117.38
0028Structure backfill, type 4 (211-09267)CYS12$300.00$431.00$310.00$214.70$325.00$214.42
0029Geogrid, type IC (214-000202)SYS42$5.00$22.00$5.50$11.95$7.00$17.18
0030Geotextile for pavement, type 2B (214-12239)SYS1,763$4.00$4.30$5.50$5.50$4.35$5.04
0031Chemical modification, soils, cement (215-12637)SYS5,447$14.00$12.00$13.00$16.50$15.00$11.40
0032Compacted aggregate, no. 8 (301-12233)CYS71$135.00$110.00$135.00$217.55$80.00$149.98
0033Compacted aggregate, no. 53 (301-12234)CYS52$120.00$96.00$98.00$169.15$150.00$185.46
0034Subbase for PCCP (302-06464)CYS38.60$200.00$130.00$120.00$140.45$180.00$147.26
0035Compacted aggregate, no. 53 (303-01180)TON742$70.00$46.00$42.00$48.50$50.00$51.78
0036Milling, transition (306-08043)SYS603$9.00$12.00$15.00$19.15$13.50$12.46
0037QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002)TON463$110.00$103.00$100.00$136.80$100.00$145.11
0038QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038)TON724$110.00$103.00$100.00$120.25$100.00$136.36
0039QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047)TON1,746$110.00$103.00$100.00$96.50$100.00$112.15
0040Joint adhesive (401-11526)LFT5,406$1.10$1.00$1.00$0.50$1.00$0.83
0041Void reducing asphalt membrane for HMA (401-12439)LFT5,616$6.60$5.60$6.00$4.25$6.00$4.30
0042Asphalt for tack coat (406-05520)TON3$660.00$617.00$600.00$540.00$600.00$0.01
0043Guardrail, remove (601-02241)LFT590$3.60$3.30$6.25$3.20$3.25$3.25
0044Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281)LFT243.75$25.00$24.00$27.00$22.70$23.00$23.00
0045Guardrail transition, MGS without curb (601-12292)EACH3$3,520.00$3,292.00$3,500.00$3,156.00$3,200.00$3,200.00
0046Guardrail transition, MGS without curb , modified (601-12292)EACH1$3,960.00$3,704.00$3,500.00$3,550.00$3,600.00$3,600.00
0047Guardrail end treatment, type OS (601-94689)EACH4$3,685.00$3,035.00$3,500.00$2,910.00$2,950.00$2,950.00
0048Barrier delineator (602-06729)EACH8$25.00$37.00$45.00$28.60$15.00$30.91
0049Reinforced concrete bridge approach, 12 in. (609-06259)SYS154$265.00$200.00$315.00$225.75$225.00$195.30
0050HMA for approaches, type B (610-07487)TON8$110.00$103.00$100.00$651.15$100.00$485.70
0051Right-of-way marker (615-06490)EACH18$176.00$165.00$200.00$157.80$160.00$160.00
0052Monument, type B (615-06505)EACH12$1,000.00$936.00$1,200.00$897.50$910.00$910.00
0053Riprap, revetment (616-06405)TON1,920$45.00$72.00$50.00$59.00$65.00$93.71
0054Geotextile for riprap, type 2A (616-12248)SYS2,768$3.50$2.90$5.50$6.40$3.50$6.01
0055Geotextile for riprap, type 2B (616-12249)SYS204$3.50$5.00$5.50$14.60$6.00$7.18
0056Mobilization and demobilization for seeding (621-01004)EACH2$880.00$1,029.00$1,100.00$789.00$800.00$800.00
0057Seed mixture, native (621-03909)LBS2$220.00$514.00$550.00$197.25$200.00$200.00
0058Mulching material (621-06565)TON7$561.00$566.00$600.00$503.00$510.00$510.00
0059Sodding (621-06574)SYS3,960$5.50$8.70$9.00$4.95$8.00$5.00
0060Seed mixture, floodplain (621-12612)LBS236$36.00$19.00$20.00$32.55$33.00$33.00
0061Plant, deciduous shrub, 18 in. to 24 in. (622-05639)EACH152$74.00$98.00$100.00$66.50$67.50$67.50
0062Plant, deciduous tree, single stem, 1.25 in. to 2 in. (622-05649)EACH304$330.00$360.00$375.00$295.00$300.00$300.00
0063Sign, 'DO not mow or spray' (622-52436)EACH8$110.00$129.00$140.00$98.60$100.00$100.00
0064Computer system equipment (628-11976)EACH2$1,000.00$772.00$750.00$675.00$750.00$1,065.94
0065Field office, type D (628-12683)MOS15$2,500.00$4,321.00$2,200.00$4,890.00$3,000.00$4,103.86
0066Topsoil processing and distribution (629-000149)SYS16,306$5.50$3.90$6.75$5.80$6.00$7.53
0067Topsoil amendment budget (629-000150)DOL32,612$1.00$1.00$1.00$1.00$1.00$1.00
0068Dynamic pile load test (701-06011)EACH4$5,000.00$3,325.00$3,750.00$4,434.00$3,250.00$5,453.87
0069Test pile, dynamic, production (701-09557)LFT273$75.00$110.00$35.00$66.60$90.00$50.58
0070Test pile, dynamic, restrike (701-09559)EACH4$3,000.00$2,956.00$2,400.00$3,130.00$2,500.00$2,228.32
0071Pile shoe, HP 12 X 53 (701-09739)EACH34$225.00$150.00$450.00$165.90$150.00$159.89
0072Pile, steel H, HP 12 X 53 (701-51195)LFT1,695$75.00$93.00$86.00$114.00$100.00$60.43
0073Concrete, A, substructure (702-51005)CYS73.10$1,300.00$1,162.00$1,500.00$1,283.00$1,350.00$1,270.38
0074Concrete, B, footings (702-51015)CYS105$750.00$667.00$420.00$828.80$700.00$675.51
0075Concrete, C, substructure (702-92857)CYS18.40$2,000.00$1,799.00$1,900.00$2,361.00$1,500.00$2,150.75
0076Reinforcing bars (703-06028)LBS14,524$2.00$1.70$1.50$1.80$1.80$1.75
0077Reinforcing bars, epoxy coated (703-06029)LBS86,638$2.00$1.40$1.50$1.65$1.80$1.48
0078Threaded tie bar assembly, epoxy coated (703-97936)EACH34$75.00$50.00$45.00$44.45$56.50$76.62
0079Concrete, C, superstructure (704-51002)CYS218.40$1,200.00$1,161.00$1,010.00$1,071.50$2,050.00$1,789.53
0080Railing, concrete type FC (706-11600)CYS19.40$1,500.00$1,229.00$850.00$789.00$1,195.00$800.00
0081Concrete bridge railing transition, type TFC (706-11620)EACH4$2,250.00$1,435.00$2,200.00$1,972.55$1,395.00$2,000.00
0082Surface seal , structure no. 1 (709-51821)LS1$3,250.00$1.00$1,200.00$9,862.75$1,200.00$1.00
0083Stud shear connectors (711-96800)EACH27$60.00$103.00$100.00$47.45$40.00$0.45
0084Waterproofing membrane, type 2 (714-000086)SFT949$8.00$0.90$3.00$3.15$5.00$6.67
0085Structure, reinforced concrete, box sections, 5 FT X 2 FT 6 in. (714-11129)LFT73$600.00$471.00$550.00$609.00$450.00$489.82
0086Pipe, type 1, circular, diameter 36 in. (715-05019)LFT108$185.00$281.00$170.00$173.15$155.00$179.80
0087Pipe, type 1, circular, diameter 60 in. (715-05133)LFT49$450.00$588.00$750.00$296.35$315.00$1,294.54
0088Concrete anchor, diameter 60 in. (715-05841)EACH1$6,000.00$8,812.00$7,500.00$14,000$4,500.00$4,564.85
0089Pipe extension, circular, diameter 10 in. , CPP (715-06568)LFT25$75.00$45.00$48.00$124.40$60.00$90.43
0090Pipe end section, diameter 36 in. (715-46040)EACH2$1,750.00$1,183.00$2,700.00$2,973.00$1,500.00$2,437.23
0091Longitudinal grooving (722-12732)SYS482$9.00$6.90$5.50$5.10$6.00$5.96
0092Road closure sign assembly (801-04308)EACH9$192.00$334.00$225.00$225.00$217.00$229.00
0093Detour route marker assembly (801-06625)EACH37$82.50$134.00$150.00$140.00$125.00$143.00
0094Construction sign, type A (801-06640)EACH28$220.00$206.00$250.00$186.00$222.00$189.00
0095Construction sign, type B (801-06645)EACH6$55.00$113.00$75.00$100.60$68.00$102.00
0096Maintaining traffic (801-06775)LS1$40,000$219,800$18,025$43,500$100,000$11,273
0097Barricade, type III-A (801-07118)LFT72$16.50$16.00$12.00$15.15$11.00$15.37
0098Barricade, type III-B (801-07119)LFT144$16.50$16.00$12.00$15.15$12.00$15.37
0099Reference post (802-04893)EACH1$330.00$309.00$200.00$295.00$300.00$300.00
0100Sign post, square, type 1, unreinforced anchor base (802-05704)LFT168$33.00$30.00$22.00$28.60$29.00$29.00
0101Sign, sheet, with legend, 0.080 in. thickness (802-09838)SFT96.25$33.00$30.00$30.00$28.60$29.00$29.00
0102Transverse marking, paint, stop line, white, 24 in. (808-06726)LFT9$11.00$12.00$12.50$10.35$12.00$10.53
0103Line, paint, solid, white, 6 in. (808-75007)LFT4,066$0.82$0.70$0.60$1.00$0.53$1.03
0104Line, paint, solid, yellow, 6 in. (808-75047)LFT4,119$0.82$0.70$0.60$1.00$0.53$1.03
0105Snowplowable raised pavement marker (808-75998)EACH42$82.00$46.00$300.00$41.45$200.00$42.00
INDOT contract B-43771-A: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way