Force Construction Co Inc: INDOT bid record
Force Construction Co Inc submitted 166 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 05 NOV 2026, and was the low bidder on 26 of them (16%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Indiana DOT
- Low bid volume
- $91,378,941
- Latest bid
- 05 NOV 2026
- Data through
- 05 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 27 | 4 | 15% |
| 2023 | 30 | 5 | 17% |
| 2024 | 40 | 7 | 18% |
| 2025 | 43 | 5 | 12% |
| 2026 | 26 | 5 | 19% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Seymour | 110 | 20 | 18% |
| Vincennes | 25 | 1 | 4% |
| Greenfield | 18 | 1 | 6% |
| Crawfordsville | 13 | 4 | 31% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Liquidated damages | 109-08359 | DOL | 166 | 166 (100%) | $1.00 | $1.00 |
| Contract liens | 109-08360 | DOL | 166 | 166 (100%) | $1.00 | $1.00 |
| Quality adjustments, failed materials | 109-08444 | DOL | 164 | 164 (100%) | $1.00 | $1.00 |
| Quality adjustments, HMA | 109-08440 | DOL | 160 | 160 (100%) | $1.00 | $1.00 |
| Stormwater management budget | 205-12108 | DOL | 157 | 157 (100%) | $1.00 | $1.00 |
| Quality adjustments, failure to maintain temporary erosion and sediment control measures | 109-11362 | DOL | 157 | 157 (100%) | $1.00 | $1.00 |
| Quality adjustments, temporary traffic control devices | 109-08443 | DOL | 148 | 148 (100%) | $1.00 | $1.00 |
| Payment adjustment, PG asphalt binder | 109-09489 | DOL | 120 | 120 (100%) | $1.00 | $1.00 |
| Project estimate adjustment | 109-08463 | DOL | 81 | 81 (100%) | $1.00 | $1.00 |
| Reinforcing bars, epoxy coated | 703-06029 | LBS | 119 | 51 (43%) | $1.60 | $1.80 |
| Subgrade treatment, type IC | 207-09935 | SYS | 139 | 43 (31%) | $42.00 | $45.00 |
| Payment adjustment PG asphalt binder | 109-09489 | DOL | 40 | 40 (100%) | $1.00 | $1.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Milestone Contractors LP | 112 | 41 of 112 |
| E & B Paving LLC | 103 | 59 of 103 |
| Ragle, Inc. | 57 | 27 of 57 |
| Dave Omara Contractor Inc | 56 | 32 of 56 |
| Beaty Construction Inc | 47 | 14 of 47 |
| Paul H Rohe Company Inc | 33 | 20 of 33 |
| Morphey Construction Inc. | 33 | 6 of 33 |
| His Constructors Inc | 32 | 11 of 32 |
| CLR Inc | 29 | 24 of 29 |
| Pontem Contractors Inc | 29 | 7 of 29 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 NOV 2026 | B-44260-A | Crawfordsville | BRIDGE DECK OVERLAY AND REHABILITATION OR REPAIR | 5 of 5 | $2,237,930 | +34% |
| 05 NOV 2026 | B-44466-A | Seymour | BRIDGE DECK OVERLAY AND COPING REPLACEMENT | 7 of 7 | $1,613,218 | +26% |
| 07 OCT 2026 | B-43637-A | Seymour | BRIDGE REPLACEMENT | 7 of 8 | $1,981,784 | +16% |
| 07 OCT 2026 | B-44483-A | Greenfield | BRIDGE REPLACEMENT AND THIN DECK OVERLAY | 3 of 6 | $1,427,446 | +21% |
| 07 OCT 2026 | B-44620-A | Greenfield | BRIDGE REPLACEMENT | 6 of 7 | $2,427,915 | +25% |
| 02 SEP 2026 | R-44461-A | Seymour | SMALL STRUCTURE REPLACEMENT AND PIPE LINING | 4 of 9 | $1,957,068 | +25% |
| 02 SEP 2026 | R-45304-A | Seymour | SMALL STRUCTURE REPLACEMENT | 9 of 9 | $267,280 | +88% |
| 02 SEP 2026 | B-43605-A | Vincennes | BRIDGE REPLACEMENT | 3 of 9 | $2,712,790 | +13% |
| 02 SEP 2026 | B-43771-A | Seymour | BRIDGE AND SMALL STRUCTURE REPLACEMENT | 2 of 6 | $3,097,670 | +2.0% |
| 02 SEP 2026 | B-44473-A | Seymour | REPLACE SUPERSTRUCTURE | 1 of 5 | $3,157,300 | Low, 3.0% under the second |
| 05 AUG 2026 | R-44460-A | Seymour | SMALL STRUCTURE REPLACEMENT | 2 of 8 | $1,525,690 | +4.0% |
| 05 AUG 2026 | B-44406-A | Seymour | BRIDGE DECK OVERLAY | 3 of 7 | $1,415,345 | +9.0% |
| 05 AUG 2026 | B-44407-A | Seymour | BRIDGE DECK OVERLAY AND BRIDGE COATING | 3 of 4 | $2,796,130 | +10% |
| 05 AUG 2026 | B-44436-A | Seymour | SMALL STRUCTURE REPLACEMENT WITH BRIDGE | 2 of 10 | $586,335 | +3.0% |
| 08 JUL 2026 | R-43365-A | Seymour | SLIDE CORRECTION, SMALL STRUCTURE AND DRAINS CONSTRUCTION | 4 of 6 | $2,660,225 | +12% |
| 08 JUL 2026 | R-43761-A | Seymour | SLIDE CORRECTION | 6 of 6 | $1,673,146 | +52% |
| 08 JUL 2026 | B-44418-A | Seymour | SCOUR PROTECTION | 2 of 3 | $477,655 | +15% |
| 08 JUL 2026 | B-46217-A | Seymour | BRIDGE DECK OVERLAY | 4 of 8 | $1,487,677 | +29% |
| 08 APR 2026 | R-44820-A | Vincennes | SMALL STRUCTURE REPLACEMENT, MAINTENANCE AND REPAIR | 3 of 5 | $1,284,120 | +11% |
| 08 APR 2026 | B-40891-A | Seymour | BRIDGE REPLACEMENT | 1 of 7 | $1,431,389 | Low, 1.0% under the second |
| 11 MAR 2026 | B-45571-A | Vincennes | BRIDGE DECK OVERLAY AND PREVENTIVE MAINTENANCE | 5 of 5 | $1,216,550 | +24% |
| 11 FEB 2026 | B-42399-B | Seymour | BRIDGE REPLACEMENT | 1 of 4 | $1,578,608 | Low, 10% under the second |
| 11 FEB 2026 | B-42786-A | Seymour | BRIDGE REPLACEMENT | 2 of 7 | $2,170,546 | +21% |
| 14 JAN 2026 | B-40892-A | Seymour | BRIDGE REPLACEMENT | 1 of 7 | $2,116,306 | Low, 2.0% under the second |
| 14 JAN 2026 | B-43650-A | Seymour | BRIDGE REPLACEMENT | 3 of 5 | $1,136,849 | +12% |
How this record was read
INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
- Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.