INDOT contract R-44461-A bid tabulation
SMALL STRUCTURE REPLACEMENT AND PIPE LINING. Let by Indiana DOT on September 2, 2026, Bartholomew, Brown, Lawrence, Monroe, Seymour. 9 bids received; low bid $1,566,293 by 5 Star Company Inc.
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 74
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | 5 Star Company Inc | $1,566,293 | Low |
| 2 | CLR Inc | $1,862,077 | +19% |
| 3 | E & B Paving LLC | $1,878,388 | +20% |
| 4 | Force Construction Co Inc | $1,957,068 | +25% |
| 5 | Crider & Crider Inc | $1,978,114 | +26% |
| 6 | Milestone Contractors LP | $2,025,836 | +29% |
| 7 | Morphey Construction Inc. | $2,191,000 | +40% |
| 8 | Ragle, Inc. | $2,193,090 | +40% |
| 9 | Mac Construction & Excavating Inc | $2,346,000 | +50% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. 5 Star Company Inc | 2. CLR Inc | 3. E & B Paving LLC | 4. Force Construction Co Inc | 5. Crider & Crider Inc | 6. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $37,500 | $58,500 | $31,947 | $30,580 | $80,000 | $35,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $77,250 | $93,400 | $90,000 | $97,500 | $100,000 | $100,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $40,500 | $56,000 | $55,000 | $40,910 | $60,000 | $127,000 |
| 0012 | Present structure, remove, structure no. CV 058-003-113.53 (202-51330) | LS | 1 | $4,500.00 | $30,000 | $13,200 | $19,410 | $25,000 | $90,000 |
| 0013 | Present structure, remove, structure no. CV 135-007-087.75 (202-51330) | LS | 1 | $2,500.00 | $5,600.00 | $6,500.00 | $8,594.00 | $10,000 | $25,000 |
| 0014 | Excavation, common (203-02000) | CYS | 245 | $40.00 | $115.00 | $120.00 | $142.00 | $875.74 | $179.00 |
| 0015 | Pump around (205-11626) | EACH | 4 | $5,290.00 | $2,000.00 | $8,500.00 | $9,797.00 | $22,600 | $15,000 |
| 0016 | Stormwater management budget (205-12108) | DOL | 22,414 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $4,000.00 | $2,500.00 | $10,000 | $17,720 | $9,500.00 | $11,700 |
| 0018 | Excavation, foundation, unclassified (206-51230) | CYS | 36 | $50.00 | $81.00 | $255.00 | $190.00 | $250.00 | $235.00 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 670 | $34.00 | $60.00 | $110.00 | $37.00 | $65.00 | $75.00 |
| 0020 | Structure backfill, type 2 (211-09265) | CYS | 648 | $70.00 | $150.00 | $95.00 | $98.00 | $90.00 | $79.00 |
| 0021 | Structure backfill, type 5 (211-09268) | CYS | 421 | $180.00 | $252.00 | $215.00 | $171.00 | $200.00 | $320.00 |
| 0022 | Geotextile for pavement, type 2B (214-12239) | SYS | 670 | $3.80 | $7.00 | $9.00 | $4.80 | $4.50 | $6.40 |
| 0023 | Compacted aggregate, no. 8 (301-12233) | CYS | 87 | $60.00 | $245.00 | $255.00 | $70.00 | $150.00 | $285.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 255 | $41.00 | $55.00 | $140.00 | $71.00 | $75.00 | $92.50 |
| 0025 | Widening with HMA, type B (304-07493) | TON | 105 | $200.00 | $182.00 | $262.00 | $202.00 | $230.00 | $160.00 |
| 0026 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 845 | $5.20 | $24.00 | $17.00 | $12.00 | $13.00 | $26.65 |
| 0027 | Milling, profile (306-11872) | SYS | 587 | $11.90 | $11.00 | $13.00 | $13.00 | $20.50 | $14.50 |
| 0028 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 167 | $190.00 | $335.00 | $300.00 | $312.00 | $350.00 | $300.00 |
| 0029 | QC/QA-HMA, 3, 58S, intermediate, 19.0 MM (401-000038) | TON | 78 | $180.00 | $325.00 | $344.00 | $338.00 | $350.00 | $325.00 |
| 0030 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 107 | $155.00 | $380.00 | $321.00 | $270.00 | $260.00 | $260.00 |
| 0031 | Joint adhesive (401-11526) | LFT | 1,755 | $1.00 | $4.45 | $3.00 | $4.60 | $1.00 | $4.45 |
| 0032 | Asphalt for tack coat (406-05521) | SYS | 2,375 | $1.00 | $0.25 | $0.65 | $0.25 | $1.00 | $0.25 |
| 0033 | Guardrail, remove (601-02241) | LFT | 114 | $6.00 | $40.00 | $32.50 | $5.20 | $5.00 | $5.00 |
| 0034 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 113 | $27.50 | $28.00 | $25.00 | $26.00 | $25.00 | $25.00 |
| 0035 | Guardrail, MGS, structure top-mounted posts (601-12293) | EACH | 8 | $500.00 | $500.00 | $450.00 | $468.00 | $450.00 | $450.00 |
| 0036 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $3,300.00 | $3,450.00 | $3,100.00 | $3,222.00 | $3,100.00 | $3,100.00 |
| 0037 | Right-of-way marker (615-06490) | EACH | 14 | $181.00 | $65.00 | $175.00 | $182.00 | $180.00 | $175.00 |
| 0038 | Monument, type B (615-06505) | EACH | 6 | $975.00 | $350.00 | $925.00 | $961.00 | $950.00 | $925.00 |
| 0039 | Riprap, class 1 (616-05688) | TON | 43 | $100.00 | $159.00 | $190.00 | $105.00 | $250.00 | $140.00 |
| 0040 | Riprap, class 2 (616-05689) | TON | 62 | $100.00 | $178.00 | $212.00 | $107.00 | $200.00 | $142.00 |
| 0041 | Riprap, revetment (616-06405) | TON | 324 | $80.00 | $86.00 | $155.00 | $94.00 | $155.00 | $116.00 |
| 0042 | Geotextile for riprap, type 1A (616-12246) | SYS | 167 | $4.00 | $5.00 | $4.50 | $3.10 | $6.50 | $10.40 |
| 0043 | Geotextile for riprap, type 2A (616-12248) | SYS | 1,014 | $4.00 | $6.75 | $3.75 | $3.80 | $3.75 | $8.00 |
| 0044 | Mobilization and demobilization for seeding (621-01004) | EACH | 5 | $800.00 | $500.00 | $500.00 | $520.00 | $1,000.00 | $500.00 |
| 0045 | Mulched seeding, type R (621-06559) | SYS | 5,686 | $2.90 | $0.45 | $2.75 | $2.90 | $0.50 | $2.75 |
| 0046 | Sodding (621-06574) | SYS | 104 | $17.00 | $50.00 | $50.00 | $52.00 | $100.00 | $50.00 |
| 0047 | Computer system equipment (628-11976) | EACH | 2 | $750.00 | $100.00 | $1,050.00 | $778.00 | $1,000.00 | $750.00 |
| 0048 | Field office, type D (628-12683) | MOS | 10 | $2,150.00 | $1,200.00 | $3,250.00 | $4,893.00 | $1,950.00 | $4,430.00 |
| 0049 | Temporary shoring (702-04325) | LS | 1 | $55,000 | $22,000 | $30,000 | $39,140 | $15,000 | $35,000 |
| 0050 | Concrete, A, substructure (702-51005) | CYS | 3.70 | $2,000.00 | $2,300.00 | $3,600.00 | $2,156.00 | $3,500.00 | $17,400 |
| 0051 | Concrete, B, footings (702-51015) | CYS | 4.40 | $2,000.00 | $795.00 | $2,250.00 | $2,553.00 | $0.01 | $0.01 |
| 0052 | Reinforcing bars, epoxy coated (703-06029) | LBS | 932 | $2.00 | $6.00 | $3.50 | $4.70 | $0.01 | $0.01 |
| 0053 | Waterproofing membrane, type 2 (714-000086) | SFT | 2,669 | $1.50 | $5.00 | $3.85 | $3.40 | $3.00 | $2.00 |
| 0054 | Structure, reinforced concrete, box sections, 5 FT X 3 FT (714-11198) | LFT | 54 | $900.00 | $738.00 | $750.00 | $411.00 | $580.00 | $217.00 |
| 0055 | Pipe, type 1, circular, diameter 6 in. (715-05115) | LFT | 8 | $45.00 | $153.00 | $150.00 | $114.00 | $160.00 | $184.00 |
| 0056 | Pipe, type 1, circular, diameter 54 in. (715-05129) | LFT | 152 | $425.00 | $730.00 | $600.00 | $611.00 | $400.00 | $560.00 |
| 0057 | Concrete anchor, diameter 54 in. (715-06492) | EACH | 2 | $5,100.00 | $7,500.00 | $8,800.00 | $9,473.00 | $5,000.00 | $6,780.00 |
| 0058 | Structure, reinforced concrete, three-sided (723-000267) | LFT | 38 | $7,700.00 | $9,035.00 | $8,500.00 | $6,380.00 | $7,250.00 | $6,665.00 |
| 0059 | Pipe liner, cured-in- place, 51 in. (725-11421) | LFT | 323 | $960.00 | $925.00 | $800.00 | $952.00 | $850.00 | $805.00 |
| 0060 | Road closure sign assembly (801-04308) | EACH | 13 | $128.00 | $125.00 | $173.00 | $180.00 | $240.00 | $239.00 |
| 0061 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 9,483 | $2.20 | $2.00 | $2.18 | $2.60 | $1.90 | $1.86 |
| 0062 | Detour route marker assembly (801-06625) | EACH | 99 | $77.00 | $75.00 | $135.00 | $140.00 | $130.00 | $129.00 |
| 0063 | Construction sign, type A (801-06640) | EACH | 63 | $179.00 | $195.00 | $165.00 | $171.00 | $190.00 | $189.00 |
| 0064 | Maintaining traffic (801-06775) | LS | 1 | $71,500 | $43,295 | $40,000 | $265,340 | $25,000 | $49,437 |
| 0065 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $9,000.00 | $4,650.00 | $8,200.00 | $11,120 | $8,250.00 | $8,200.01 |
| 0066 | Barricade, type III-A (801-07118) | LFT | 144 | $13.00 | $12.00 | $9.00 | $9.40 | $14.25 | $14.12 |
| 0067 | Barricade, type III-B (801-07119) | LFT | 216 | $13.00 | $12.00 | $12.00 | $12.00 | $14.25 | $14.12 |
| 0068 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 130 | $50.00 | $100.00 | $200.00 | $174.00 | $130.00 | $200.00 |
| 0069 | Portable changeable message sign (801-11642) | EACH | 2 | $3,150.00 | $3,350.00 | $3,600.00 | $3,742.00 | $3,000.00 | $2,943.00 |
| 0070 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 2 | $318.00 | $335.00 | $249.00 | $259.00 | $780.00 | $797.00 |
| 0071 | Line, remove (808-06716) | LFT | 8,203 | $0.70 | $0.39 | $0.42 | $0.45 | $0.60 | $0.56 |
| 0072 | Line, paint, broken, white, 6 in. (808-75002) | LFT | 560 | $1.10 | $1.12 | $1.10 | $1.10 | $1.50 | $1.22 |
| 0073 | Line, paint, solid, white, 6 in. (808-75007) | LFT | 4,819 | $0.90 | $0.68 | $1.13 | $1.20 | $1.30 | $1.01 |
| 0074 | Line, paint, solid, yellow, 6 in. (808-75047) | LFT | 5,370 | $0.90 | $0.68 | $1.13 | $1.20 | $1.30 | $1.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.