INDOT contract B-44473-A bid tabulation
REPLACE SUPERSTRUCTURE. Let by Indiana DOT on September 2, 2026, Washington, Seymour. 5 bids received; low bid $3,157,300 by Force Construction Co Inc.
- Owner
- Indiana DOT
- Letting
- 02 SEP 2026
- Pay items
- 104
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Force Construction Co Inc | $3,157,300 | Low |
| 2 | Milestone Contractors LP | $3,237,475 | +3.0% |
| 3 | E & B Paving LLC | $3,291,000 | +4.0% |
| 4 | Ragle, Inc. | $3,347,788 | +6.0% |
| 5 | American Contracting & Services Inc | $3,548,860 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Force Construction Co Inc | 2. Milestone Contractors LP | 3. E & B Paving LLC | 4. Ragle, Inc. | 5. American Contracting & Services Inc |
|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $24,180 | $12,000 | $70,022 | $30,250 | $24,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $150,500 | $160,248 | $164,550 | $167,250 | $177,443 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $12,800 | $32,475 | $33,600 | $33,500 | $35,489 |
| 0012 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $10,290 | $7,500.00 | $3,500.00 | $5,000.00 | $5,000.00 |
| 0013 | Pavement removal (202-02240) | SYS | 198.20 | $42.00 | $64.45 | $65.00 | $50.00 | $45.00 |
| 0014 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $89,490 | $105,500 | $106,589 | $80,000 | $215,000 |
| 0015 | Excavation, common (203-02000) | CYS | 2,160 | $38.00 | $39.00 | $69.00 | $40.00 | $60.00 |
| 0016 | Stormwater management budget (205-12108) | DOL | 44,301 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0017 | Stormwater management implementation (205-12616) | LS | 1 | $8,306.00 | $12,500 | $15,000 | $8,000.00 | $15,000 |
| 0018 | Cofferdam (206-51235) | LS | 1 | $25,710 | $19,000 | $25,000 | $50,000 | $20,000 |
| 0019 | Subgrade treatment, type IC (207-09935) | SYS | 3,553.70 | $42.00 | $39.00 | $51.00 | $38.50 | $45.00 |
| 0020 | Aggregate for end bent backfill (211-06467) | CYS | 15.80 | $180.00 | $170.00 | $240.00 | $170.00 | $190.00 |
| 0021 | Geotextile for pavement, type 2B (214-12239) | SYS | 3,553.70 | $4.00 | $5.75 | $5.00 | $4.50 | $5.00 |
| 0022 | Compacted aggregate, no. 53 (301-12234) | CYS | 479.40 | $82.00 | $80.00 | $105.00 | $105.00 | $125.00 |
| 0023 | Subbase for PCCP (302-06464) | CYS | 41.40 | $146.00 | $280.00 | $250.00 | $145.00 | $135.00 |
| 0024 | Compacted aggregate, no. 53 (303-01180) | TON | 681 | $48.00 | $48.00 | $60.00 | $52.00 | $45.00 |
| 0025 | Milling, transition (306-08043) | SYS | 1,470.30 | $5.60 | $10.00 | $10.00 | $4.75 | $7.00 |
| 0026 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 361 | $154.00 | $210.00 | $370.00 | $150.00 | $150.00 |
| 0027 | QC/QA-HMA, 3, 58H, intermediate, 9.5 MM (401-000023) | TON | 396 | $154.00 | $165.00 | $200.00 | $150.00 | $150.00 |
| 0028 | QC/QA-HMA, 3, 58H, base, 25.0 MM (401-000050) | TON | 1,739 | $154.00 | $132.00 | $107.00 | $150.00 | $150.00 |
| 0029 | Joint adhesive (401-11526) | LFT | 7,219 | $0.50 | $0.90 | $0.10 | $0.50 | $0.50 |
| 0030 | Asphalt for tack coat (406-05520) | TON | 5 | $617.00 | $580.00 | $1.00 | $600.00 | $600.00 |
| 0031 | Terminal joint, type HMA (503-12477) | LFT | 87 | $511.00 | $505.00 | $500.00 | $535.53 | $485.00 |
| 0032 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 176 | $119.00 | $115.55 | $115.55 | $115.55 | $250.00 |
| 0033 | Guardrail, remove (601-02241) | LFT | 521 | $5.10 | $5.00 | $0.01 | $6.90 | $0.01 |
| 0034 | Guardrail terminal system, W-beam, curved, type 9 (601-05586) | EACH | 1 | $3,065.00 | $2,979.00 | $3,050.00 | $2,979.00 | $3,050.00 |
| 0035 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 50 | $52.00 | $51.00 | $25.00 | $51.00 | $25.00 |
| 0036 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,272.00 | $1,236.00 | $1,000.00 | $1,236.00 | $1,000.00 |
| 0037 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,227.00 | $3,137.00 | $3,383.00 | $3,137.00 | $3,383.00 |
| 0038 | Guardrail end treatment, type OS (601-94689) | EACH | 3 | $3,201.00 | $3,111.00 | $3,105.00 | $3,111.00 | $3,105.00 |
| 0039 | Barrier delineator (602-06729) | EACH | 26 | $41.00 | $110.00 | $49.48 | $35.93 | $50.00 |
| 0040 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 2,104 | $2.70 | $5.42 | $4.24 | $1.75 | $3.00 |
| 0041 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 208.60 | $242.00 | $290.00 | $245.78 | $245.00 | $230.00 |
| 0042 | Monument, type B (615-06505) | EACH | 2 | $1,262.00 | $1,227.00 | $1,571.00 | $1,227.00 | $1,571.00 |
| 0043 | Riprap, class 2 (616-05689) | TON | 428 | $91.00 | $138.00 | $115.00 | $115.00 | $105.00 |
| 0044 | Riprap, revetment (616-06405) | TON | 44 | $81.00 | $135.00 | $110.00 | $90.00 | $110.00 |
| 0045 | Geotextile for riprap, type 1A (616-12246) | SYS | 508 | $3.90 | $4.50 | $2.50 | $3.00 | $7.00 |
| 0046 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $1,003.00 | $975.00 | $975.00 | $200.00 | $200.00 |
| 0047 | Erosion control blanket (621-02770) | SYS | 2,229 | $2.40 | $2.35 | $2.35 | $1.75 | $1.75 |
| 0048 | Mulched seeding, type R (621-06559) | SYS | 3,409 | $0.60 | $0.60 | $0.60 | $2.25 | $2.25 |
| 0049 | Water (621-06567) | KGAL | 1 | $10.00 | $10.00 | $10.00 | $0.10 | $0.10 |
| 0050 | Sodding (621-06574) | SYS | 29 | $129.00 | $125.00 | $125.00 | $130.00 | $115.00 |
| 0051 | Field office, type C (628-09403) | MOS | 24 | $3,292.00 | $4,100.00 | $3,000.00 | $2,400.00 | $4,000.00 |
| 0052 | Computer system equipment (628-11976) | EACH | 4 | $772.00 | $1,200.00 | $250.00 | $1,000.00 | $1,100.00 |
| 0053 | Field drilled hole in concrete (702-51863) | EACH | 180 | $34.00 | $40.00 | $65.00 | $24.00 | $30.00 |
| 0054 | Reinforcing bars, epoxy coated (703-06029) | LBS | 58,613 | $1.50 | $1.80 | $2.00 | $1.80 | $1.80 |
| 0055 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 468 | $43.00 | $51.00 | $45.00 | $70.00 | $55.00 |
| 0056 | Concrete, C, superstructure (704-51002) | CYS | 164.30 | $1,878.00 | $2,395.00 | $1,950.00 | $1,750.00 | $1,580.00 |
| 0057 | Railing, concrete type FC (706-11600) | CYS | 19.60 | $1,476.00 | $1,435.00 | $987.00 | $1,435.00 | $1,500.00 |
| 0058 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 4 | $1,538.00 | $1,495.00 | $2,000.00 | $1,495.00 | $3,100.00 |
| 0059 | Surface seal , bridge no. 1 (709-51821) | LS | 1 | $1.00 | $2,239.88 | $2,239.88 | $1,000.00 | $5,000.00 |
| 0060 | Surface seal , bridge no. 2 (709-51821) | LS | 1 | $7,432.00 | $7,224.00 | $7,224.00 | $7,224.00 | $15,000 |
| 0061 | Patching concrete structures (710-09158) | SFT | 50 | $51.00 | $50.00 | $50.00 | $82.00 | $195.00 |
| 0062 | Structural steel (711-51035) | LBS | 63,140 | $3.95 | $5.25 | $4.52 | $6.00 | $6.30 |
| 0063 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 62 | $85.00 | $180.00 | $130.00 | $80.00 | $85.00 |
| 0064 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 221 | $24.00 | $6.00 | $27.55 | $15.00 | $26.00 |
| 0065 | Pipe, roadway drain casting extension (715-10238) | EACH | 1 | $912.00 | $5,000.00 | $1,035.27 | $1,000.00 | $2,000.00 |
| 0066 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $1,319.00 | $1,800.00 | $800.00 | $750.00 | $700.00 |
| 0067 | Geotextile for underdrains, type 2B (718-12308) | SYS | 88 | $6.40 | $19.00 | $7.64 | $5.00 | $10.00 |
| 0068 | Bridge deck overlay, rigid (722-000134) | SYS | 1,600 | $76.00 | $95.00 | $95.00 | $125.00 | $100.00 |
| 0069 | Hydrodemolition (722-01066) | SYS | 1,600 | $69.00 | $80.00 | $74.00 | $85.00 | $100.00 |
| 0070 | Bridge deck overlay budget (722-12380) | DOL | 50,368 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0071 | Longitudinal grooving (722-12732) | SYS | 2,296.10 | $4.90 | $4.00 | $5.50 | $5.75 | $8.00 |
| 0072 | Bridge deck patching, full depth (722-51401) | SFT | 200 | $61.00 | $81.00 | $35.00 | $60.00 | $55.00 |
| 0073 | Overlay dam (722-51874) | SFT | 180 | $77.00 | $37.00 | $75.00 | $80.00 | $50.00 |
| 0074 | Bearing assembly, elastomeric (726-92406) | EACH | 24 | $3,019.00 | $4,250.00 | $1,250.00 | $4,800.00 | $4,500.00 |
| 0075 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 2 | $51.00 | $50.00 | $50.00 | $50.00 | $250.00 |
| 0076 | Epoxy injection, crack preparation (727-90308) | LFT | 20 | $82.00 | $80.13 | $80.13 | $80.13 | $129.00 |
| 0077 | Bridge deck, remove existing polymer overlay system (738-12917) | SYS | 1,600 | $14.00 | $7.91 | $8.50 | $10.00 | $15.00 |
| 0078 | Construction sign, type D (801-03291) | EACH | 2 | $185.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 0079 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 18,513 | $2.10 | $1.95 | $1.95 | $1.95 | $1.95 |
| 0080 | Temporary transverse pavement marking, 24 in. (801-06216) | LFT | 48 | $13.00 | $12.55 | $12.55 | $12.55 | $12.55 |
| 0081 | Temporary transverse pavement marking, removable, 24 in. (801-06218) | LFT | 75 | $13.00 | $12.55 | $12.55 | $12.55 | $12.55 |
| 0082 | Construction sign, type A (801-06640) | EACH | 63 | $185.00 | $180.00 | $180.00 | $180.00 | $180.00 |
| 0083 | Construction sign, type B (801-06645) | EACH | 19 | $113.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 0084 | Maintaining traffic (801-06775) | LS | 1 | $284,601 | $50,183 | $130,000 | $90,000 | $40,000 |
| 0085 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $7,295.00 | $7,091.00 | $8,300.00 | $7,091.00 | $8,500.00 |
| 0086 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 2 | $10,170 | $9,885.00 | $12,400 | $9,885.00 | $13,000 |
| 0087 | Barricade, type III-A (801-07118) | LFT | 60 | $16.00 | $15.55 | $15.55 | $15.55 | $15.55 |
| 0088 | Barricade, type III-B (801-07119) | LFT | 126 | $16.00 | $15.55 | $15.50 | $15.55 | $15.55 |
| 0089 | Temporary traffic barrier, type 2 (801-08401) | LFT | 750 | $47.00 | $52.00 | $29.13 | $45.00 | $45.00 |
| 0090 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 2,050 | $52.00 | $39.00 | $30.84 | $55.00 | $75.00 |
| 0091 | Portable changeable message sign (801-11642) | EACH | 5 | $4,686.00 | $4,555.00 | $4,555.00 | $4,555.00 | $4,555.00 |
| 0092 | Portable signal , bridge no. 1 (801-12081) | LS | 1 | $11,120 | $17,185 | $33,775 | $55,000 | $30,000 |
| 0093 | Portable signal , bridge no. 2 (801-12081) | LS | 1 | $11,120 | $5,728.36 | $27,020 | $35,000 | $15,000 |
| 0094 | Driveway assistance device (801-12482) | EACH | 2 | $3,504.00 | $1,500.00 | $4,050.00 | $5,000.00 | $5,000.00 |
| 0095 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 6 | $417.00 | $405.00 | $405.00 | $405.00 | $405.00 |
| 0096 | Reference post (802-04893) | EACH | 2 | $486.00 | $472.00 | $200.00 | $472.00 | $200.00 |
| 0097 | Line, remove (808-06716) | LFT | 16,187 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 0098 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 6,813 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0099 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 60 | $14.00 | $14.00 | $14.00 | $14.00 | $14.00 |
| 0100 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 5,513 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0101 | Grooving for pavement markings (808-12032) | LFT | 8,099 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 0102 | Line, multi-component, broken, yellow, 6 in. (808-12841) | LFT | 613 | $1.40 | $1.35 | $1.35 | $1.35 | $1.35 |
| 0103 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 63 | $80.00 | $15.00 | $15.00 | $25.00 | $50.00 |
| 0104 | Snowplowable raised pavement marker (808-75998) | EACH | 61 | $41.00 | $39.55 | $39.55 | $39.55 | $39.55 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of September 2, 2026. Compiled by Mirage Metrics.