INDOT contract B-44407-A bid tabulation
BRIDGE DECK OVERLAY AND BRIDGE COATING. Let by Indiana DOT on August 5, 2026, Bartholomew, Seymour. 4 bids received; low bid $2,535,000 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 05 AUG 2026
- Pay items
- 96
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $2,535,000 | Low |
| 2 | E & B Paving LLC | $2,720,000 | +7.0% |
| 3 | Force Construction Co Inc | $2,796,130 | +10% |
| 4 | Beaty Construction Inc | $2,935,840 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. E & B Paving LLC | 3. Force Construction Co Inc | 4. Beaty Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $40,000 | $35,000 | $10,390 | $10,031 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices and markings (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $166,754 | $136,000 | $139,000 | $146,000 |
| 0011 | Clearing right-of-way (201-52370) | LS | 1 | $50,000 | $27,200 | $20,920 | $24,600 |
| 0012 | Debris, remove, structure no. 1 (201-90788) | LS | 1 | $5,000.00 | $35,000 | $5,195.00 | $20,000 |
| 0013 | Pavement removal (202-02240) | SYS | 240 | $217.00 | $70.00 | $55.00 | $50.00 |
| 0014 | Curb and gutter, remove (202-02279) | LFT | 20 | $33.00 | $96.00 | $87.00 | $32.00 |
| 0015 | Present structure, remove portions, structure no. 1 (202-51328) | LS | 1 | $65,000 | $60,000 | $19,640 | $150,000 |
| 0016 | Bridge railing, remove (202-62420) | LFT | 299 | $166.35 | $150.00 | $135.00 | $332.00 |
| 0017 | Excavation, common (203-02000) | CYS | 100 | $77.00 | $105.00 | $95.00 | $50.00 |
| 0018 | Borrow (203-02070) | CYS | 20 | $124.00 | $185.00 | $92.00 | $85.00 |
| 0019 | Linear grading (203-08607) | LFT | 10 | $40.30 | $104.00 | $64.00 | $32.00 |
| 0020 | Stormwater management budget (205-12108) | DOL | 40,972 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0021 | Stormwater management implementation (205-12616) | LS | 1 | $16,100 | $45,000 | $23,080 | $4,000.00 |
| 0022 | Cofferdam (206-51235) | LS | 1 | $100.00 | $15,000 | $1.00 | $1.00 |
| 0023 | Subgrade treatment, type IC (207-09935) | SYS | 120 | $102.90 | $106.00 | $75.00 | $150.00 |
| 0024 | Geotextile for pavement, type 2B (214-12239) | SYS | 354 | $10.15 | $5.50 | $6.40 | $6.50 |
| 0025 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 454 | $11.10 | $26.00 | $12.00 | $31.00 |
| 0026 | Lean concrete base, 9 in. (309-12695) | SYS | 235 | $130.05 | $95.00 | $120.00 | $95.00 |
| 0027 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 47 | $333.40 | $411.30 | $427.00 | $275.00 |
| 0028 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 16 | $312.80 | $389.00 | $404.00 | $275.00 |
| 0029 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 50 | $302.30 | $375.55 | $390.00 | $275.00 |
| 0030 | Asphalt for tack coat (406-05521) | SYS | 791 | $0.25 | $0.30 | $0.30 | $0.50 |
| 0031 | Barrier delineator (602-06729) | EACH | 11 | $59.15 | $35.00 | $32.00 | $30.00 |
| 0032 | Curb and gutter, concrete (605-06140) | LFT | 20 | $165.40 | $165.00 | $178.00 | $225.00 |
| 0033 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 240 | $231.80 | $285.00 | $229.00 | $200.00 |
| 0034 | Riprap, revetment (616-06405) | TON | 67 | $127.00 | $82.00 | $94.00 | $90.00 |
| 0035 | Geotextile for riprap, type 1A (616-12246) | SYS | 135 | $10.50 | $5.50 | $8.30 | $6.00 |
| 0036 | Slopewall, concrete, 4 in. (616-51367) | SYS | 12 | $390.00 | $660.00 | $641.00 | $450.00 |
| 0037 | Clean steel bridge, QP-1, bridge no. 1 (619-11051) | LS | 1 | $215,000 | $160,000 | $166,260 | $165,000 |
| 0038 | Disposal of cleaning waste, non-hazardous, bridge no. 1 (619-12460) | LS | 1 | $2,500.00 | $13,000 | $13,510 | $13,000 |
| 0039 | Coat steel bridge, bridge no. 1 (619-51859) | LS | 1 | $210,000 | $260,000 | $270,160 | $540,000 |
| 0040 | Mobilization and demobilization for seeding (621-01004) | EACH | 1 | $1,615.00 | $1,000.00 | $1,039.00 | $1,000.00 |
| 0041 | Mulched seeding, type U (621-06560) | SYS | 1,885 | $1.40 | $1.25 | $2.10 | $2.00 |
| 0042 | Water (621-06567) | KGAL | 1 | $1.00 | $10.00 | $0.01 | $0.01 |
| 0043 | Sodding (621-06574) | SYS | 41 | $112.95 | $150.00 | $78.00 | $42.00 |
| 0044 | Computer system equipment (628-11976) | EACH | 2 | $3,275.00 | $500.00 | $823.00 | $850.00 |
| 0045 | Field office, type D (628-12683) | MOS | 6 | $2,620.00 | $3,500.00 | $4,116.00 | $8,500.00 |
| 0046 | Reinforcing bars, epoxy coated (703-06029) | LBS | 18,575 | $2.15 | $2.25 | $1.70 | $2.10 |
| 0047 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 84 | $51.80 | $45.00 | $55.00 | $52.00 |
| 0048 | Railing, concrete type FC , modified (706-09960) | LFT | 258 | $163.45 | $195.00 | $141.00 | $260.00 |
| 0049 | Concrete bridge railing transition, type TFC (706-11620) | EACH | 2 | $6,110.00 | $6,500.00 | $5,715.00 | $7,050.00 |
| 0050 | Surface seal (709-51821) | LS | 1 | $22,445 | $20,870 | $32,340 | $36,500 |
| 0051 | Patching concrete structures (710-09158) | SFT | 144 | $176.35 | $164.00 | $240.00 | $250.00 |
| 0052 | Replace , cable grout caps (711-05395) | EACH | 38 | $3,965.00 | $2,141.00 | $2,225.00 | $4,200.00 |
| 0053 | Replace , cable neoprene boots (711-05395) | EACH | 80 | $1,560.00 | $2,696.00 | $2,801.00 | $1,650.00 |
| 0054 | Replace , cable tie assembly (711-05395) | EACH | 38 | $3,255.00 | $2,996.00 | $3,473.00 | $3,500.00 |
| 0055 | Replace , gasket (711-05395) | EACH | 2 | $4,735.00 | $4,000.00 | $4,156.00 | $7,500.00 |
| 0056 | Hanger cables , grout voids (711-12407) | LFT | 272 | $490.00 | $296.00 | $308.00 | $525.00 |
| 0057 | Bridge deck, remove concrete overlay and surface (722-000183) | SYS | 2,655 | $5.90 | $10.00 | $9.80 | $17.25 |
| 0058 | Bridge deck overlay budget (722-12380) | DOL | 50,800 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0059 | Longitudinal grooving (722-12732) | SYS | 2,888 | $3.75 | $10.00 | $4.00 | $4.00 |
| 0060 | Bridge deck overlay, latex modified (722-51842) | SYS | 2,655 | $126.00 | $155.00 | $98.00 | $110.00 |
| 0061 | Bridge deck patching, partial depth (722-51852) | SFT | 300 | $74.05 | $85.00 | $37.00 | $100.00 |
| 0062 | Overlay dam (722-51874) | SFT | 102 | $110.00 | $130.00 | $92.00 | $50.00 |
| 0063 | Bridge joint nosing (724-12420) | SFT | 154 | $121.85 | $125.00 | $319.00 | $106.00 |
| 0064 | Concrete for patching bridge expansion joint (724-12461) | SFT | 112 | $176.25 | $105.00 | $114.00 | $98.00 |
| 0065 | Bridge expansion joint, type PCF, replace (724-12776) | LFT | 82 | $270.60 | $82.00 | $95.00 | $100.00 |
| 0066 | Bridge expansion joint seal, type SS, replace (724-12777) | LFT | 28 | $800.00 | $750.00 | $361.00 | $60.00 |
| 0067 | Bridge expansion joint seal, type M, replace (724-12778) | LFT | 108 | $147.25 | $250.00 | $312.00 | $65.00 |
| 0068 | Epoxy injection, epoxy injection adhesive (727-000188) | GAL | 5 | $62.40 | $58.00 | $104.00 | $205.00 |
| 0069 | Epoxy injection, crack preparation (727-90308) | LFT | 50 | $121.50 | $113.00 | $26.00 | $51.00 |
| 0070 | Epoxy injection, furnishing equipment (727-93560) | LS | 1 | $1,037.70 | $965.00 | $1,559.00 | $3,100.00 |
| 0071 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 2 | $143.00 | $150.00 | $138.00 | $180.00 |
| 0072 | Construction sign, type C (801-03290) | EACH | 2 | $244.10 | $150.00 | $236.00 | $250.00 |
| 0073 | Road closure sign assembly (801-04308) | EACH | 1 | $249.50 | $295.00 | $241.00 | $300.00 |
| 0074 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 9,755 | $2.15 | $3.35 | $2.40 | $2.50 |
| 0075 | Temporary pavement message marking, removable, lane indication arrow (801-06211) | EACH | 6 | $214.00 | $150.00 | $267.00 | $160.00 |
| 0076 | Detour route marker assembly (801-06625) | EACH | 23 | $165.55 | $120.00 | $159.00 | $130.00 |
| 0077 | Construction sign, type A (801-06640) | EACH | 44 | $226.90 | $175.00 | $219.00 | $200.00 |
| 0078 | Construction sign, type B (801-06645) | EACH | 19 | $119.40 | $98.00 | $115.00 | $115.00 |
| 0079 | Flashing arrow sign (801-06710) | DAY | 120 | $17.20 | $15.00 | $17.00 | $15.00 |
| 0080 | Maintaining traffic (801-06775) | LS | 1 | $30,000 | $116,187 | $491,237 | $75,000 |
| 0081 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 1 | $11,828 | $20,000 | $11,430 | $13,150 |
| 0082 | Barricade, type III-B (801-07119) | LFT | 48 | $17.20 | $16.00 | $17.00 | $17.25 |
| 0083 | Temporary traffic barrier, type 2 (801-08401) | LFT | 870 | $38.90 | $75.00 | $52.00 | $55.00 |
| 0084 | Portable changeable message sign (801-11642) | EACH | 2 | $4,373.25 | $4,000.00 | $4,226.00 | $4,200.00 |
| 0085 | Temporary pedestrian channelizer (801-12862) | LFT | 36 | $36.50 | $35.00 | $55.00 | $25.00 |
| 0086 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 5 | $1,001.10 | $550.00 | $967.00 | $785.00 |
| 0087 | Line, remove (808-06716) | LFT | 2,363 | $0.65 | $0.75 | $0.60 | $0.50 |
| 0088 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 144 | $13.45 | $5.95 | $13.00 | $12.00 |
| 0089 | Pavement message marking, multi- component, only (808-10052) | EACH | 2 | $265.60 | $195.00 | $257.00 | $250.00 |
| 0090 | Pavement message marking, multi- component, RXR (808-10053) | EACH | 4 | $1,397.00 | $595.00 | $1,350.00 | $625.00 |
| 0091 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 2 | $235.50 | $150.00 | $228.00 | $180.00 |
| 0092 | Grooving for pavement markings (808-12032) | LFT | 3,651 | $0.90 | $0.49 | $0.85 | $0.65 |
| 0093 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 2,045 | $8.15 | $7.95 | $7.90 | $6.25 |
| 0094 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 908 | $9.30 | $8.50 | $9.00 | $7.50 |
| 0095 | Line, preformed plastic, solid, yellow, 6 in. (808-75057) | LFT | 698 | $8.15 | $7.95 | $7.90 | $6.25 |
| 0096 | Prismatic reflector (808-75994) | EACH | 38 | $10.45 | $30.00 | $10.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of August 5, 2026. Compiled by Mirage Metrics.