INDOT contract B-42786-A bid tabulation
BRIDGE REPLACEMENT. Let by Indiana DOT on February 11, 2026, Monroe, Seymour. 7 bids received; low bid $1,789,854 by CLR Inc.
- Owner
- Indiana DOT
- Letting
- 11 FEB 2026
- Pay items
- 100
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | CLR Inc | $1,789,854 | Low |
| 2 | Force Construction Co Inc | $2,170,546 | +21% |
| 3 | Beaty Construction Inc | $2,215,625 | +24% |
| 4 | Milestone Contractors LP | $2,220,000 | +24% |
| 5 | E & B Paving LLC | $2,243,500 | +25% |
| 6 | Pontem Contractors Inc | $2,386,400 | +33% |
| 7 | Ragle, Inc. | $2,425,356 | +36% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. CLR Inc | 2. Force Construction Co Inc | 3. Beaty Construction Inc | 4. Milestone Contractors LP | 5. E & B Paving LLC | 6. Pontem Contractors Inc |
|---|---|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $60,500 | $21,000 | $29,252 | $35,001 | $53,912 | $25,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $89,495 | $100,000 | $103,250 | $170,926 | $112,175 | $119,270 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $35,795 | $54,540 | $50,000 | $44,800 | $6,600.00 | $47,308 |
| 0011 | Pipe abandon and grout fill (202-02637) | LFT | 70 | $65.00 | $78.00 | $40.00 | $30.00 | $75.00 | $30.00 |
| 0012 | Present structure, remove, structure no. 53-00308 (202-51330) | LS | 1 | $40,000 | $30,860 | $150,745 | $51,333 | $80,000 | $176,267 |
| 0013 | Excavation, common (203-02000) | CYS | 1,022 | $38.00 | $46.00 | $26.25 | $65.88 | $64.00 | $87.50 |
| 0014 | Excavation, rock (203-02010) | CYS | 285 | $150.00 | $247.00 | $150.00 | $195.00 | $250.00 | $193.50 |
| 0015 | Borrow (203-02070) | CYS | 1,850 | $8.50 | $23.00 | $26.50 | $19.12 | $20.00 | $32.50 |
| 0016 | Excavation, waterway (203-51223) | CYS | 210 | $29.00 | $61.00 | $32.25 | $45.00 | $94.00 | $71.00 |
| 0017 | Stormwater management budget (205-12108) | DOL | 48,696 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0018 | Stormwater management implementation (205-12616) | LS | 1 | $2,500.00 | $22,570 | $12,500 | $8,250.00 | $30,000 | $35,000 |
| 0019 | SWQCP preparation (205-12618) | LS | 1 | $1,300.00 | $3,088.00 | $3,500.00 | $3,630.00 | $3,630.00 | $10,000 |
| 0020 | Excavation, X (206-51215) | CYS | 75 | $300.00 | $284.00 | $225.00 | $245.00 | $565.00 | $203.50 |
| 0021 | Excavation, foundation, unclassified (206-51230) | CYS | 220 | $55.00 | $166.00 | $42.00 | $55.00 | $90.00 | $78.50 |
| 0022 | Cofferdam (206-51235) | LS | 1 | $12,000 | $53,320 | $175,000 | $65,321 | $95,000 | $145,000 |
| 0023 | Subgrade treatment, type II (207-08264) | SYS | 936 | $12.00 | $17.00 | $30.25 | $28.11 | $20.00 | $32.00 |
| 0024 | Subgrade treatment, type IC (207-09935) | SYS | 2,950 | $23.00 | $22.00 | $28.00 | $23.81 | $30.00 | $40.50 |
| 0025 | Aggregate for end bent backfill (211-06467) | CYS | 28 | $54.00 | $155.00 | $230.00 | $221.32 | $175.00 | $99.50 |
| 0026 | Structure backfill, type 1 (211-09264) | CYS | 15 | $116.00 | $179.00 | $75.00 | $50.31 | $95.00 | $96.50 |
| 0027 | Geotextile for pavement, type 2B (214-12239) | SYS | 180 | $8.00 | $7.30 | $5.90 | $10.01 | $9.00 | $8.50 |
| 0028 | Compacted aggregate, no. 2 (301-12231) | CYS | 106 | $60.00 | $71.00 | $132.50 | $110.00 | $100.00 | $60.00 |
| 0029 | Compacted aggregate, no. 53 (301-12234) | CYS | 554 | $77.00 | $55.00 | $67.00 | $50.05 | $80.00 | $74.50 |
| 0030 | Compacted aggregate, no. 53 (303-01180) | TON | 209 | $70.00 | $59.00 | $77.50 | $47.64 | $44.00 | $54.00 |
| 0031 | Milling, transition (306-08043) | SYS | 447 | $14.00 | $14.00 | $20.00 | $8.00 | $19.50 | $12.00 |
| 0032 | Lean concrete base, 9 in. (309-12695) | SYS | 180 | $125.00 | $101.00 | $80.00 | $125.00 | $75.00 | $134.00 |
| 0033 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 275 | $145.00 | $134.00 | $138.00 | $130.00 | $131.00 | $144.00 |
| 0034 | QC/QA-HMA, 2, 58H, surface, 9.5 MM (401-000004) | TON | 40 | $134.00 | $124.00 | $138.00 | $120.00 | $131.00 | $144.00 |
| 0036 | QC/QA-HMA, 2, 58S, base, 25.0 MM (401-000046) | TON | 1,083 | $95.00 | $87.00 | $95.00 | $85.00 | $89.25 | $99.50 |
| 0037 | Joint adhesive (401-11526) | LFT | 6,864 | $0.70 | $0.70 | $0.50 | $0.70 | $0.50 | $0.60 |
| 0038 | HMA wedge and level, type B (402-07451) | TON | 12 | $350.00 | $309.00 | $100.00 | $300.00 | $100.00 | $105.00 |
| 0039 | Asphalt for tack coat (406-05521) | SYS | 11,062 | $0.20 | $0.20 | $0.25 | $0.20 | $0.20 | $0.30 |
| 0040 | Guardrail, remove (601-02241) | LFT | 375 | $6.00 | $5.20 | $5.00 | $5.00 | $5.00 | $5.50 |
| 0041 | Guardrail, MGS W-beam, 6 FT 3 in. spacing (601-12281) | LFT | 107 | $24.00 | $22.00 | $21.00 | $21.00 | $21.00 | $22.50 |
| 0042 | Guardrail transition, MGS without curb (601-12292) | EACH | 4 | $3,500.00 | $3,242.00 | $3,150.00 | $3,150.00 | $3,150.00 | $3,307.50 |
| 0043 | Guardrail end treatment, type OS (601-94689) | EACH | 4 | $2,500.00 | $2,316.00 | $2,250.00 | $2,250.00 | $2,250.00 | $2,362.50 |
| 0044 | Curb and gutter, concrete, type C (605-06150) | LFT | 300 | $50.00 | $86.00 | $55.00 | $52.02 | $45.00 | $44.50 |
| 0045 | Reinforced concrete bridge approach, 12 in. (609-06259) | SYS | 186 | $218.00 | $218.00 | $190.00 | $262.73 | $275.00 | $195.50 |
| 0046 | HMA for approaches, type B (610-07487) | TON | 57 | $139.00 | $129.00 | $235.00 | $125.00 | $215.50 | $247.00 |
| 0047 | Mailbox assembly, reset, single (611-08232) | EACH | 2 | $200.00 | $206.00 | $200.00 | $200.00 | $200.00 | $210.00 |
| 0048 | Right-of-way marker (615-06490) | EACH | 19 | $140.00 | $180.00 | $175.00 | $175.00 | $175.00 | $184.00 |
| 0049 | Riprap, class 1 (616-05688) | TON | 1,396 | $47.00 | $78.00 | $70.00 | $95.22 | $70.00 | $93.50 |
| 0050 | Riprap, class 2 (616-05689) | TON | 141 | $78.00 | $122.00 | $92.00 | $135.22 | $120.00 | $96.00 |
| 0051 | Riprap, revetment (616-06405) | TON | 183 | $79.00 | $64.00 | $55.00 | $100.00 | $100.00 | $60.50 |
| 0052 | Geotextile for riprap, type 1A (616-12246) | SYS | 2,344 | $3.00 | $4.80 | $3.50 | $3.01 | $3.00 | $3.00 |
| 0053 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $250.00 | $926.00 | $800.00 | $800.00 | $900.00 | $840.00 |
| 0054 | Erosion control blanket (621-02770) | SYS | 1,199 | $3.05 | $2.20 | $1.45 | $2.00 | $2.10 | $2.50 |
| 0055 | Seed mixture, type U (621-06554) | LBS | 46 | $6.00 | $4.40 | $29.00 | $15.00 | $4.25 | $16.00 |
| 0056 | Mulched seeding, type U (621-06560) | SYS | 1,513 | $2.25 | $0.75 | $1.20 | $0.80 | $0.75 | $1.00 |
| 0057 | Water (621-06567) | KGAL | 1 | $0.01 | $10.00 | $150.00 | $0.01 | $10.00 | $0.50 |
| 0058 | Sodding (621-06574) | SYS | 45 | $10.00 | $103.00 | $65.00 | $60.00 | $100.00 | $95.50 |
| 0059 | Seed mixture, floodplain (621-12612) | LBS | 2 | $110.00 | $515.00 | $330.00 | $400.00 | $500.00 | $420.00 |
| 0060 | Field office, type C (628-09403) | MOS | 9 | $1,000.00 | $3,911.00 | $3,100.00 | $3,500.00 | $2,650.00 | $3,393.00 |
| 0061 | Computer system equipment (628-11976) | EACH | 1 | $100.00 | $1,029.00 | $850.00 | $850.00 | $500.00 | $1,190.00 |
| 0062 | Computer system (628-11977) | EACH | 1 | $100.00 | $1,029.00 | $850.00 | $1,500.00 | $550.00 | $1,572.00 |
| 0063 | Topsoil processing and distribution (629-000149) | SYS | 2,853 | $6.00 | $8.50 | $8.25 | $11.22 | $12.25 | $19.50 |
| 0064 | Topsoil amendment budget (629-000150) | DOL | 5,706 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0065 | Cored hole in rock, diameter 24 in. (701-02938) | LFT | 27 | $980.00 | $1,096.00 | $750.00 | $1,496.38 | $2,500.00 | $1,088.00 |
| 0066 | Test pile, indicator, restrike , modified (701-09560) | EACH | 9 | $585.00 | $1,705.00 | $1,275.00 | $2,410.11 | $2,400.00 | $3,045.50 |
| 0067 | Pile shoe, HP 12 X 74 (701-09683) | EACH | 9 | $200.00 | $149.00 | $150.00 | $110.00 | $150.00 | $147.50 |
| 0068 | Pile, steel H, HP 12 X 74 (701-95780) | LFT | 102 | $220.00 | $180.00 | $215.00 | $93.22 | $165.00 | $113.00 |
| 0069 | Concrete, A, substructure (702-51005) | CYS | 72 | $1,350.00 | $1,586.00 | $1,150.00 | $1,106.22 | $1,070.00 | $1,050.00 |
| 0070 | Concrete, B, footings (702-51015) | CYS | 32.50 | $1,325.00 | $706.00 | $850.00 | $1,808.74 | $875.00 | $770.00 |
| 0071 | Reinforcing bars (703-06028) | LBS | 17,412 | $1.55 | $1.50 | $1.50 | $1.46 | $2.00 | $1.50 |
| 0072 | Reinforcing bars, epoxy coated (703-06029) | LBS | 63,885 | $2.05 | $1.40 | $1.50 | $1.62 | $2.50 | $1.50 |
| 0073 | Threaded tie bar assembly, epoxy coated (703-97936) | EACH | 30 | $25.00 | $62.00 | $40.00 | $40.01 | $45.00 | $40.00 |
| 0074 | Articulating concrete mattress (704-09031) | SYS | 15 | $325.00 | $853.00 | $300.00 | $1,000.00 | $525.00 | $736.50 |
| 0075 | Concrete, C, superstructure (704-51002) | CYS | 192.30 | $1,265.00 | $1,510.00 | $1,540.00 | $1,634.91 | $1,360.00 | $1,284.50 |
| 0076 | Concrete bridge railing transition, type TPF-1 (706-06351) | EACH | 4 | $3,700.00 | $5,420.00 | $4,760.00 | $6,243.74 | $6,500.00 | $4,875.00 |
| 0077 | Railing, concrete type PF-1 (706-09962) | LFT | 164 | $115.00 | $135.00 | $156.00 | $179.00 | $141.00 | $154.50 |
| 0078 | Railing, steel type PF-1 (706-11404) | LFT | 182 | $145.00 | $126.00 | $122.00 | $122.00 | $122.00 | $128.50 |
| 0079 | Surface seal (709-51821) | LS | 1 | $2,000.00 | $1.00 | $1.00 | $3,940.00 | $1.00 | $4,137.00 |
| 0080 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 300 | $9.00 | $33.00 | $31.00 | $31.00 | $50.00 | $44.00 |
| 0081 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 26 | $33.00 | $66.00 | $60.00 | $51.00 | $90.00 | $58.50 |
| 0082 | Pipe, type 1, circular, diameter 30 in. (715-05125) | LFT | 56 | $124.00 | $139.00 | $305.00 | $265.00 | $225.00 | $117.50 |
| 0083 | Pipe, end bent drain, diameter 6 in. (715-05407) | LFT | 100 | $25.00 | $46.00 | $12.75 | $25.25 | $10.00 | $19.00 |
| 0084 | Video inspection for underdrain (718-06532) | LFT | 300 | $5.00 | $5.20 | $11.00 | $11.00 | $9.50 | $16.00 |
| 0085 | Geotextile for underdrains, type 1A (718-12305) | SYS | 259 | $5.00 | $5.30 | $4.25 | $13.85 | $2.00 | $3.00 |
| 0086 | Geotextile for underdrains, type 2B (718-12308) | SYS | 93 | $8.00 | $8.90 | $12.75 | $29.31 | $4.00 | $12.50 |
| 0087 | Aggregate for underdrains (718-52610) | CYS | 26 | $120.00 | $86.00 | $132.00 | $245.22 | $90.00 | $81.50 |
| 0088 | Longitudinal grooving (722-12732) | SYS | 436 | $10.00 | $9.00 | $7.90 | $6.31 | $15.00 | $18.00 |
| 0089 | Road closure sign assembly (801-04308) | EACH | 4 | $250.00 | $337.00 | $220.00 | $265.00 | $265.00 | $278.50 |
| 0090 | Detour route marker assembly (801-06625) | EACH | 21 | $110.00 | $193.00 | $95.00 | $135.00 | $135.00 | $142.00 |
| 0091 | Construction sign, type A (801-06640) | EACH | 31 | $185.00 | $238.00 | $185.00 | $145.00 | $145.00 | $152.50 |
| 0092 | Maintaining traffic (801-06775) | LS | 1 | $20,437 | $158,000 | $63,200 | $40,022 | $25,000 | $17,585 |
| 0093 | Barricade, type III-A (801-07118) | LFT | 108 | $16.00 | $15.00 | $16.00 | $17.00 | $17.00 | $18.00 |
| 0094 | Barricade, type III-B (801-07119) | LFT | 156 | $18.00 | $19.00 | $18.00 | $17.00 | $17.00 | $18.00 |
| 0095 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 39 | $36.00 | $25.00 | $24.00 | $24.00 | $24.00 | $25.50 |
| 0096 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 15 | $28.00 | $39.00 | $38.00 | $38.00 | $38.00 | $40.00 |
| 0097 | Sign, ground mounted, reset (802-91122) | EACH | 2 | $225.00 | $334.00 | $325.00 | $325.00 | $325.00 | $341.50 |
| 0098 | Line, paint, solid, white, 4 in. (808-06713) | LFT | 1,797 | $1.11 | $1.30 | $1.00 | $1.00 | $1.00 | $1.50 |
| 0099 | Line, paint, solid, yellow, 4 in. (808-06714) | LFT | 1,888 | $1.11 | $0.65 | $1.00 | $1.00 | $1.00 | $1.50 |
| 0100 | Transverse marking, paint, stop line, white, 24 in. (808-06726) | LFT | 45 | $7.00 | $15.00 | $6.00 | $10.00 | $10.00 | $10.50 |
| 0101 | QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037) | TON | 515 | $112.00 | $103.00 | $100.00 | $100.00 | $89.75 | $103.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of February 11, 2026. Compiled by Mirage Metrics.