INDOT contract B-40892-A bid tabulation

BRIDGE REPLACEMENT. Let by Indiana DOT on January 14, 2026, Franklin, Seymour. 7 bids received; low bid $2,116,306 by Force Construction Co Inc.

Owner
Indiana DOT
Letting
14 JAN 2026
Pay items
80
Data through
05 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Force Construction Co Inc$2,116,306Low
2Olco Inc$2,163,877+2.0%
3Dave Omara Contractor Inc$2,254,591+7.0%
4Beaty Construction Inc$2,315,550+9.0%
5Sunesis Construction Company$2,399,273+13%
6Paul H Rohe Company Inc$2,402,141+14%
7Milestone Contractors LP$2,794,500+32%
INDOT contract B-40892-A: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Force Construction Co Inc2. Olco Inc3. Dave Omara Contractor Inc4. Beaty Construction Inc5. Sunesis Construction Company6. Paul H Rohe Company Inc
0001Construction engineering (105-06845)LS1$19,040$19,400$20,500$31,000$18,641$18,500
0002Inspection hole, deeper than 3 FT (107-09358)EACH2$869.00$269.21$1,200.00$2,500.00$830.88$920.00
0003Liquidated damages (109-08359)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0004Contract liens (109-08360)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0005Quality adjustments, HMA (109-08440)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0006Quality adjustments, temporary traffic control devices (109-08443)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0007Quality adjustments, failed materials (109-08444)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0008Payment adjustment, PG asphalt binder (109-09489)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0009Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362)DOL1$1.00$1.00$1.00$1.00$1.00$1.00
0010Mobilization and demobilization (110-01001)LS1$105,000$16,382$112,730$115,400$213,632$103,990
0011Clearing right-of-way (201-52370)LS1$19,920$16,335$45,092$30,500$10,983$17,378
0012Present structure, remove, structure no. 24-00031 (202-51330)LS1$50,870$34,758$98,300$144,017$68,909$71,600
0013Sign, remove (202-74035)EACH1$184.00$51.06$15.00$200.00$221.67$155.00
0014Excavation, common (203-02000)CYS1,180$36.00$35.24$24.00$28.00$2.02$44.00
0015Borrow (203-02070)CYS3,440$27.00$58.94$32.50$23.00$44.21$46.00
0016Stormwater management budget (205-12108)DOL47,100$1.00$1.00$1.00$1.00$1.00$1.00
0017Stormwater management implementation (205-12616)LS1$8,785.00$10,800$51,000$12,500$14,963$35,000
0018SWQCP preparation (205-12618)LS1$2,573.00$5,000.00$3,100.00$5,000.00$5,037.99$3,000.00
0019Excavation, X (206-51215)CYS95$128.00$98.52$150.00$225.00$109.03$100.00
0020Excavation, foundation, unclassified (206-51230)CYS385$65.00$55.49$95.00$30.00$70.28$46.00
0021Cofferdam (206-51235)LS1$79,640$28,670$33,000$160,000$20,211$58,325
0022Subgrade treatment, type II (207-08264)SYS509$27.00$24.57$26.00$30.50$51.58$30.00
0023Subgrade treatment, type IC (207-09935)SYS2,286$34.00$35.48$44.00$28.00$45.14$38.00
0024B borrow (211-02050)CYS860$49.00$75.20$75.00$60.00$95.73$86.00
0025Aggregate for end bent backfill (211-06467)CYS52$129.00$80.36$140.00$190.00$175.06$140.00
0026Structure backfill, type 2 (211-09265)CYS6$169.00$122.14$105.00$100.00$127.62$160.00
0027Geotextile for pavement, type 2B (214-12239)SYS182$6.60$5.28$5.25$7.50$9.24$8.00
0028Compacted aggregate, no. 53 (301-12234)CYS309$58.00$79.01$97.00$90.00$141.13$96.00
0029Subbase for PCCP (302-06464)CYS46$108.00$98.44$102.00$200.00$197.74$160.00
0030Compacted aggregate, no. 53 (303-01180)TON211$45.00$53.40$43.00$64.00$95.86$64.00
0031QC/QA-HMA, 2, 58S, surface, 9.5 MM (401-000001)TON159$111.00$200.27$108.00$108.00$151.14$150.00
0032QC/QA-HMA, 2, 58S, intermediate, 19.0 MM (401-000037)TON502$111.00$170.26$108.00$108.00$115.87$115.00
0033Joint adhesive (401-11526)LFT1,594$0.50$1.67$0.50$0.50$0.71$0.80
0034Asphalt for tack coat (406-05521)SYS2,462$0.50$0.79$0.50$0.50$0.40$0.51
0035Guardrail terminal system, W-beam, curved, type 2 (601-01701)EACH1$2,727.00$2,365.00$2,600.00$2,365.00$2,382.97$2,365.00
0036Guardrail end treatment, type I (601-06037)EACH3$1,183.00$1,500.00$1,700.00$1,500.00$1,511.40$1,500.00
0037Guardrail transition, type TGS-1 (601-06374)EACH3$1,039.00$1,550.00$1,700.00$1,550.00$1,561.78$1,550.00
0038Guardrail transition, type TGS-1 , modified (601-06374)EACH1$926.00$1,900.00$2,100.00$1,900.00$1,914.43$1,900.00
0039Guardrail, W-beam, 6 FT 3 in. spacing (601-99105)LFT119$23.00$22.00$24.00$22.00$22.17$22.00
0040Fence , electric (603-03829)LFT227$31.00$5.13$32.00$29.00$29.22$29.00
0041Fence , vinyl (603-03829)LFT50$103.00$46.15$102.00$92.00$92.70$92.00
0042Reinforced concrete bridge approach, 10 in. (609-06257)SYS182$170.00$160.25$295.00$175.00$328.24$200.00
0043HMA for approaches, type B (610-07487)TON96$111.00$190.30$108.00$108.00$187.77$155.00
0044Mailbox assembly, single (611-06497)EACH4$232.00$250.00$275.00$250.00$251.90$250.00
0045Right-of-way marker (615-06490)EACH14$165.00$175.00$185.00$175.00$176.33$175.00
0046Riprap, class 1 (616-05688)TON856$80.00$66.77$78.00$83.50$85.97$84.00
0047Riprap, revetment (616-06405)TON403$59.00$50.54$60.00$60.25$73.11$67.00
0048Geotextile for riprap, type 1A (616-12246)SYS932$3.70$3.56$5.25$3.00$2.90$2.60
0049Geotextile for riprap, type 2B (616-12249)SYS502$4.60$5.01$5.25$5.75$7.81$5.50
0050Mobilization and demobilization for seeding (621-01004)EACH1$823.00$319.24$825.00$900.00$806.08$800.00
0051Mulched seeding, type R (621-06559)SYS3,226$1.80$1.40$2.00$0.65$4.90$1.75
0052Computer system equipment (628-11976)EACH2$1,112.00$788.39$500.00$850.00$836.38$930.00
0053Field office, type D (628-12683)MOS18$4,156.00$1,612.03$2,000.00$4,500.00$2,727.50$3,125.00
0054Topsoil processing and distribution (629-000149)SYS3,226$4.20$4.47$11.00$4.00$1.71$11.35
0055Topsoil amendment budget (629-000150)DOL6,500$1.00$1.00$1.00$1.00$1.00$1.00
0056Cored hole in rock, diameter 24 in. (701-02938)LFT60$508.00$333.49$220.00$640.00$323.75$200.00
0057Pile shoe, HP 12 X 53 (701-09739)EACH12$152.00$1,188.94$1,150.00$162.00$167.28$145.00
0058Pile, steel H, HP 12 X 53 (701-51195)LFT264$115.00$100.73$155.00$146.00$139.47$265.00
0059Concrete, A, substructure (702-51005)CYS95.20$1,122.00$653.11$1,150.00$1,500.00$1,486.26$1,540.00
0060Concrete, B, footings (702-51015)CYS90.80$376.00$399.84$690.00$500.00$507.44$635.00
0061Reinforcing bars (703-06028)LBS28,892$1.40$2.01$1.65$1.45$1.52$1.05
0062Reinforcing bars, epoxy coated (703-06029)LBS65,326$1.40$1.83$1.65$1.50$1.62$1.20
0063Threaded tie bar assembly, epoxy coated (703-97936)EACH30$49.00$62.48$70.00$50.00$38.63$110.00
0064Concrete, C, superstructure (704-51002)CYS211.50$1,065.00$1,533.95$1,050.00$1,275.00$1,468.76$1,769.00
0065Railing, steel type TS-1 (706-06344)LFT350$74.00$72.75$75.00$73.00$73.30$72.75
0066Structural member, concrete, I-beam, 36 in. X 12 in. (707-05983)LFT674$408.00$638.68$510.00$486.65$538.55$530.00
0067Surface seal (709-51821)LS1$1.00$2,098.88$1,200.00$1.00$13.95$7,200.00
0068Pipe, type 3, circular, diameter 15 in. (715-05169)LFT57$80.00$95.04$98.00$75.00$126.05$86.00
0069Pipe end section, diameter 15 in. (715-46005)EACH2$1,134.00$585.19$1,150.00$720.00$513.94$845.00
0070Geotextile for underdrains, type 2A (718-12307)SYS130$6.40$181.05$5.25$6.25$10.11$3.70
0071Longitudinal grooving (722-12732)SYS723$3.90$3.80$4.00$6.40$6.69$3.80
0072Road closure sign assembly (801-04308)EACH4$301.00$250.00$350.00$220.00$294.79$220.00
0073Detour route marker assembly (801-06625)EACH32$121.00$85.00$200.00$95.00$118.40$95.00
0074Construction sign, type A (801-06640)EACH15$220.00$200.00$325.00$175.00$215.26$175.00
0075Maintaining traffic (801-06775)LS1$202,000$8,307.32$44,688$20,700$5,473.49$10,578
0076Barricade, type III-A (801-07118)LFT48$13.00$25.00$18.00$16.00$12.62$15.00
0077Barricade, type III-B (801-07119)LFT48$13.00$25.00$20.00$16.00$12.62$16.00
0078Sign post, square, type 1, reinforced anchor base (802-05701)LFT28$31.00$33.00$36.00$33.00$55.39$25.00
0079Sign, sheet, with legend, 0.100 in. thickness (802-09840)SFT12$31.00$47.00$50.00$47.00$53.63$28.00
0080Sign, ground mounted, reset (802-91122)EACH1$309.00$300.00$325.00$300.00$258.35$250.00
INDOT contract B-40892-A: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy