Dave Omara Contractor Inc: INDOT bid record

Dave Omara Contractor Inc submitted 151 bids on Indiana DOT contracts in the data, from 12 JAN 2022 to 11 MAR 2026, and was the low bidder on 45 of them (30%). When it was not low, its total sat a median +18% above the low bid.

Owner
Indiana DOT
Low bid volume
$118,363,710
Latest bid
11 MAR 2026
Data through
05 NOV 2026
151Bids
45Low bids
30Win rate, percent
+18%Median gap to the low bid when not low, 106 bids

By year

YearBidsLow bidsWin rate
2022351234%
2023301343%
2024441330%
202536617%
20266117%
Dave Omara Contractor Inc, INDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Seymour1284334%
Greenfield2329%
Dave Omara Contractor Inc, INDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Liquidated damages109-08359DOL149149 (100%)$1.00$1.00
Contract liens109-08360DOL149149 (100%)$1.00$1.00
Quality adjustments, temporary traffic control devices109-08443DOL149149 (100%)$1.00$1.00
Quality adjustments, failed materials109-08444DOL147147 (100%)$1.00$1.00
Quality adjustments, HMA109-08440DOL135135 (100%)$1.00$1.00
Stormwater management budget205-12108DOL125125 (100%)$1.00$1.00
Quality adjustments, failure to maintain temporary erosion and sediment control measures109-11362DOL123123 (100%)$1.00$1.00
Payment adjustment, PG asphalt binder109-09489DOL9090 (100%)$1.00$1.00
Asphalt for tack coat406-05520TON8260 (73%)$600.00$650.00
Project estimate adjustment109-08463DOL5353 (100%)$1.00$1.00
Payment adjustment PG asphalt binder109-09489DOL5050 (100%)$1.00$1.00
Joint adhesive, surface401-10258LFT10940 (37%)$1.00$0.75
Dave Omara Contractor Inc, INDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Milestone Contractors LP9139 of 91
Paul H Rohe Company Inc7441 of 74
Force Construction Co Inc5624 of 56
E & B Paving LLC5428 of 54
Morphey Construction Inc.4720 of 47
5 Star Company Inc3625 of 36
Olco Inc3627 of 36
Sunesis Construction Company3513 of 35
Beaty Construction Inc259 of 25
His Constructors Inc219 of 21
Dave Omara Contractor Inc, INDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
11 MAR 2026R-44130-AGreenfieldAUXILIARY LANE CONSTRUCTION3 of 11$867,054+14%
11 MAR 2026R-45672-ASeymourPAVEMENT PATCHING, BRIDGE DECK OVERLAY, SUBSTRUCTURE REPAIR3 of 3$9,249,000+16%
11 MAR 2026R-45673-ASeymourPAVEMENT PATCHING3 of 3$3,248,000+50%
14 JAN 2026R-39911-BSeymourPAVEMENT REPLACEMENT1 of 4$5,784,721Low, 12% under the second
14 JAN 2026B-40892-ASeymourBRIDGE REPLACEMENT3 of 7$2,254,591+7.0%
14 JAN 2026B-43516-AGreenfieldSMALL STRUCTURE REPLACEMENT11 of 12$916,957+38%
10 DEC 2025R-43370-ASeymourHMA OVERLAY, PREVENTIVE MAINTENANCE1 of 3$2,138,500Low, 4.0% under the second
10 DEC 2025R-43621-AGreenfieldADDED TRAVEL LANES8 of 8$8,844,108+33%
10 DEC 2025R-43788-ASeymourSMALL STRUCTURE REPLACEMENT2 of 8$466,3800.0%
10 DEC 2025B-44276-AGreenfieldBRIDGE REPLACEMENT7 of 10$1,896,230+27%
10 DEC 2025B-44962-ASeymourEMBANKMENT STABILIZATION5 of 7$239,900+46%
13 NOV 2025R-42797-AGreenfieldBIKE AND PEDESTRIAN FACILITIES6 of 8$2,268,147+25%
13 NOV 2025R-43888-ASeymourSMALL STRUCTURE REPLACEMENT3 of 7$664,539+6.0%
13 NOV 2025B-43735-ASeymourBRIDGE DECK OVERLAY AND SMALL STRUC REPLACEMENT AND LINING2 of 4$2,679,811+1.0%
13 NOV 2025B-45038-ASeymourBRIDGE DECK OVERLAY3 of 3$2,535,337+11%
08 OCT 2025R-43320-ASeymourSMALL STRUCTURE REPLACEMENT WITH BRIDGE4 of 7$2,174,000+14%
08 OCT 2025R-43747-ASeymourSMALL STRUCTURE REPLACEMENT3 of 6$489,686+19%
08 OCT 2025R-43777-ASeymourSMALL STRUCTURE REPLACEMENT AND BRIDGE DECK OVERLAY1 of 7$2,982,539Low, 9.0% under the second
08 OCT 2025B-43654-ASeymourBRIDGE REPLACEMENT4 of 4$1,411,645+11%
08 OCT 2025B-43960-AGreenfieldSMALL STRUCTURE REPLACEMENT7 of 9$459,537+37%
08 OCT 2025B-45039-ASeymourBRIDGE DECK OVERLAY7 of 8$2,982,365+18%
10 SEP 2025R-43739-ASeymourSMALL STRUCTURE REPLACEMENT7 of 10$2,959,237+32%
10 SEP 2025R-43936-AGreenfieldSMALL STRUCTURES AND DRAINS CONSTRUCTION3 of 7$986,953+11%
10 SEP 2025B-42884-ASeymourBRIDGE DECK OVERLAY1 of 7$485,210Low, 2.0% under the second
10 SEP 2025B-44217-ASeymourBRIDGE DECK OVERLAY2 of 4$978,421+2.0%
Dave Omara Contractor Inc: latest INDOT bids in the data

How this record was read

INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.

  • Every bid counted here matched its published total to within one dollar; INDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy